1 |
16-Sep-2025 06:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[RRD Damages on Roda Nallah to Dhandal road km. 0/00 to 2/900. (SH- Construction of wire crate R/wall at Rd. 1/630 to 1/636).]
[MDII][2025_PWD_114891_13]
|
PWD |
2 |
16-Sep-2025 06:00 PM |
25-Sep-2025 11:00 AM |
25-Sep-2025 11:00 AM |
[C/O link road from Kushada to Samrahan Km 0/00 to 3/00 (SH- Metalling and Tarring in Km 0/00 to 2/00 under PDNA 2023)]
[MDII][2025_PWD_114891_16]
|
PWD |
3 |
16-Sep-2025 06:00 PM |
25-Sep-2025 11:00 AM |
25-Sep-2025 11:00 AM |
[R.R.Damages on Kun to Padhar road km. 0/00 to 1/500. (SH- P/L Kharanja stone soling, 80mm interlocking paver block, M/T and drain in km 0/00 to 1/500 Under PDNA 2023]
[MDII][2025_PWD_114891_14]
|
PWD |
4 |
16-Sep-2025 06:00 PM |
07-Oct-2025 02:00 PM |
07-Oct-2025 02:30 PM |
[E-tender for the Procurement of Fully automated Chemiluminescence system for Blood Bank Department IGMC Shimla.]
[HFW/ME(MCS)G3-1/20Pur(BB)18587][2025_IGMC1_114922_1]
|
Directorate of Medical Education and Research||IGMC Shimla||Principal IGMC Shimla |
5 |
16-Sep-2025 06:00 PM |
25-Sep-2025 11:00 AM |
25-Sep-2025 11:00 AM |
[Annual repair and maintenance of Motipur Dudar road km. 0/00 to 2/500.(SH- Providing and laying 30mm thick bituminous concrete including profile correction in km. 0/00 to 1/00) Under PDNA 2023]
[MDII][2025_PWD_114891_15]
|
PWD |
6 |
16-Sep-2025 06:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[RRD on Sandhapattan Bharol Bagora Bagla Hard Ropri Kalang Traimbli Drubbal Charonj Banwar Kotli Km ka Tar Mandokhar Bhargaon Kotli road at Rd70/600]
[MDII][2025_PWD_114891_1]
|
PWD |
7 |
16-Sep-2025 06:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[RRD On Madan Ka Ghar to Samrahan to road km. 0/00 to 7/200).(]
[MDII][2025_PWD_114891_2]
|
PWD |
8 |
16-Sep-2025 06:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[RRD Damages on Kun to Kot road km 0/00 to 2/00 ]
[MDII][2025_PWD_114891_3]
|
PWD |
9 |
16-Sep-2025 06:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[RRD Damages on Jablahi Nallah to Barnota Karkoh road km. 0/00 to 5/500. ]
[MDII][2025_PWD_114891_7]
|
PWD |
10 |
16-Sep-2025 06:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[RRD Damages on Kun to Kot road km. 0/00 to 2/800. ]
[MDII][2025_PWD_114891_9]
|
PWD |
11 |
16-Sep-2025 06:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[RRD Damages on Jablahi Nallah to Barnota Karkoh road. 0/00 to 5/500]
[MDII][2025_PWD_114891_6]
|
PWD |
12 |
16-Sep-2025 06:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[RRD Damages on Motipur Dudar Majhwar Road km. 0/00 to 2/800.(SH- Construction of PCC B/wall at RD. 0/110 TO 0/120,0/485 to 0/498 and 1/640 to 1/685). Under PDNA 2023.]
[MDII][2025_PWD_114891_11]
|
PWD |
13 |
16-Sep-2025 06:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[RRD on Dawahan Dwada Badwani Naga Ra Padhar Harizan Basti Dhwali road km. 0/00 to 5/00 ]
[MDII][2025_PWD_114891_4]
|
PWD |
14 |
16-Sep-2025 06:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[RRD Damages on Motipur Dudar Majhwar road km. 0//00 to 2/500. (SH- Construction of R/wall at R.D 0/150 TO 0/184) Under PDNA 2023]
[MDII][2025_PWD_114891_12]
|
PWD |
15 |
16-Sep-2025 06:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[RRD Damages on Pandoh seyog road km. 0/00 to 4/00. (SH Construction of PCC B/wall at R.D 0/038 TO 0/056). Under PDNA-2023]
[MDII][2025_PWD_114891_10]
|
PWD |
16 |
16-Sep-2025 06:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[RRD Damages on Jablahi Nallah to Barnota Karkoh Road km. 0/00 to 5/500. ]
[MDII][2025_PWD_114891_5]
|
PWD |
17 |
16-Sep-2025 06:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[RRD Damages on Roda Nallah Karkoh road km. 0/00 to 12/300.]
[MDII][2025_PWD_114891_8]
|
PWD |
18 |
16-Sep-2025 05:40 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/O of rain damages on various road Section Barotiwala under HPPWD Sub division baddi (SH Hiring of Tractor with trolly]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114939_1]
|
PWD |
19 |
16-Sep-2025 05:35 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/O of rain damages on various road Section Baddi under HPPWD Sub division baddi (SH Hiring of Tractor with trolly]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114936_1]
|
PWD |
20 |
16-Sep-2025 05:25 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/O of rain damages on various road under Baddi HPPWD Sub division baddi (SH Hiring of JCB with breaker on hours basis).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114934_1]
|
PWD |
21 |
16-Sep-2025 05:20 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/O of rain damages on Sai Ghared road a and other surrounding road under Baddi section HPPWD Sub division baddi (SH Hiring of JCB on hours basis).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114931_1]
|
PWD |
22 |
16-Sep-2025 05:00 PM |
25-Sep-2025 02:00 PM |
26-Sep-2025 11:30 AM |
[Imp of LWSS International Zoo]
[DHR-KNG02-728][2025_HPIPH_114925_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP||Dehra,Irrigation and Public Health,HP |
23 |
16-Sep-2025 05:00 PM |
09-Oct-2025 05:00 PM |
10-Oct-2025 02:30 PM |
[OUTSOURCING OF THE SANITATION SERVICES ]
[HFW-SML(Mental Hospital)(Tender Services)Estt-891][2025_DFHW_114644_1]
|
Department of Health and Family Welfare||Directorate of Health and Family Welfare||CMO SHIMLA |
24 |
16-Sep-2025 05:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 02:00 PM |
[Restoration of rain damaged road from Scandal Point to Kalibari Mandir in ward no 2 Ruldu Bhatta SH C O R wall RD 0 390 to 0 400]
[1996dated12092025][2025_MC_114871_3]
|
Municipal Corporation Shimla |
25 |
16-Sep-2025 05:00 PM |
23-Sep-2025 12:00 PM |
24-Sep-2025 01:00 PM |
[HPSEBL/GPHD/DB-9/2025-26-76]
[HPSEBL/GPHD/DB-9/2025-26-76][2025_HPSEB_114723_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Bhaba Nagar||RE Ganvi PH |
26 |
16-Sep-2025 05:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:30 AM |
[Construction of link road from Bhanei to Maira via Kut and Bhol km. 0/0 to 1/800 including bridge over BuhalKhad 53.41 mtr span at RD 0/256 (Under SCSP). ]
[No.PWJ/CB/TA/2025-4186 dated 09.09.2025][2025_PWD_114765_1]
|
PWD |
27 |
16-Sep-2025 05:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 02:00 PM |
[Restoration of rain damages on MC Road Lower Kaithu to Shiv Mandir RD 0 00 to 0 280 in Ward no 3 SH C O R wall at RD 0 170 to 0 190]
[1996dated12092025][2025_MC_114871_1]
|
Municipal Corporation Shimla |
28 |
16-Sep-2025 05:00 PM |
26-Sep-2025 11:00 AM |
26-Sep-2025 11:30 AM |
[C/o Road side drains with cover in BBNDA, Baddi Area.]
[BBNDA-06(Project) NIT(Online) 2024-25/-4003-13][2025_BBNDA_114484_1]
|
Baddi Barotiwala Nalagarh Development Authority||Director Industries to the Govt. of H.P.Shimla||CEO BBNDA at Baddi Distt.Solan (H.P.)||Executive Engineer (Project Division) BBNDA |
29 |
16-Sep-2025 05:00 PM |
26-Sep-2025 11:00 AM |
26-Sep-2025 11:30 AM |
[Strengthening of road from Jyoti Lab to VSGM Colony via Coca- Cola at I.A. Baddi (1.900 Km). ]
[BBNDA-06(Project) NIT(Online) 2024-25/-4003-13][2025_BBNDA_114478_1]
|
Baddi Barotiwala Nalagarh Development Authority||Director Industries to the Govt. of H.P.Shimla||CEO BBNDA at Baddi Distt.Solan (H.P.)||Executive Engineer (Project Division) BBNDA |
30 |
16-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/O rain damages on SAKB road in km 70/00 to 79/400 and other surrounding road under barotiwala section HPPWD Sub division baddi (SH Hiring of JCB on hours basis).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114929_1]
|
PWD |
31 |
16-Sep-2025 05:00 PM |
25-Sep-2025 04:00 PM |
26-Sep-2025 11:30 AM |
[Imp of LWSS Masot DPR]
[DHR-KNG02-728][2025_HPIPH_114928_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP||Dehra,Irrigation and Public Health,HP |
32 |
16-Sep-2025 05:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 02:00 PM |
[Restoration of rain damages in front of Leeladhar Chowk near Hotel Himland in ward no 34]
[1996dated12092025][2025_MC_114871_5]
|
Municipal Corporation Shimla |
33 |
16-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[A/R and M/O on Kulhariwala to Tipra road in km 0/0 to 1/930 (SH P/L patch work (MSS) in km 0/0 to 1/930) under MMSRRY]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114926_1]
|
PWD |
34 |
16-Sep-2025 05:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 02:00 PM |
[Restoration of rain damages on Ambulance road from Dogra Niwas to Bansal House Sector No 3 New Shimla Ward no 32 SH C O R wall RD 0 115 to 0 125]
[1996dated12092025][2025_MC_114871_4]
|
Municipal Corporation Shimla |
35 |
16-Sep-2025 05:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:30 AM |
[Construction of Ayurvedic Health Centre Building at Bagga in Tehsil Jawali, Distt. Kangra (H.P.) ]
[No.PWJ/CB/TA/2025-4186 dated 09.09.2025][2025_PWD_114765_2]
|
PWD |
36 |
16-Sep-2025 05:00 PM |
26-Sep-2025 11:00 AM |
26-Sep-2025 11:30 AM |
[Deploying of Manpower for cleaning drains, cutting bushes, sweeping of streets and Miscellaneous works in BBNDA, Baddi area]
[BBNDA-06(Project) NIT(Online) 2024-25/-4003-13][2025_BBNDA_114463_1]
|
Baddi Barotiwala Nalagarh Development Authority||Director Industries to the Govt. of H.P.Shimla||CEO BBNDA at Baddi Distt.Solan (H.P.)||Executive Engineer (Project Division) BBNDA |
37 |
16-Sep-2025 05:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 02:00 PM |
[Restoration of rain damaged ambulance road from NH 22 to Gorkhu Lodge below block no 12 in Ward no 27 Kasumpti SH R wall RD 0 400 to 0 418]
[1996dated12092025][2025_MC_114871_2]
|
Municipal Corporation Shimla |
38 |
16-Sep-2025 05:00 PM |
26-Sep-2025 11:00 AM |
26-Sep-2025 11:30 AM |
[Strengthening of road Nalagarh Ropar road to Radyali in BBNDA Nalagarh area]
[BBNDA-06(Project) NIT(Online) 2024-25/-4003-13][2025_BBNDA_114481_1]
|
Baddi Barotiwala Nalagarh Development Authority||Director Industries to the Govt. of H.P.Shimla||CEO BBNDA at Baddi Distt.Solan (H.P.)||Executive Engineer (Project Division) BBNDA |
39 |
16-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
24-Sep-2025 03:00 PM |
[Providing SOP to the HRTC Bilaspur by providing 630 KVA 11/0.4 KV S/Stn a/w 11 KV CT/PT Combined unit outdoor type and 11 KV HT Line at HRTC Workshop Nihal from existing 11 KV Feeder Jabli-Bilaspur No.II in E Section Roura under ESD No.II Bilaspur]
[07 Press/2025-26][2025_HPSEB_114865_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Bilaspur||Sr. Xen (E) Bilaspur |
40 |
16-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
24-Sep-2025 11:30 AM |
[RM of LWSS Bharoli Kallan Bhater Fallan in GP Bharoli Kallan in Tehsil Jhandutta Distt Bilaspur SH Replacement of 40mm dia pipe line from storage tank Bharoli Khurd to vill Bharoli Khurd Bagunder BASP]
[JSDJ-5321-5420 dt. 16.9.2025][2025_HPIPH_114887_1]
|
HP Irrigation and Public Health||Bilaspur Circle,Irrigation and Public Health,HP |
41 |
16-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
24-Sep-2025 11:30 AM |
[RM of GWSS Balh Chalog in GP Salwar in Tehsil Jhandutta Distt Bilaspur HP SH Construction of storage tank at village Salwar under BASP]
[JSDJ-5321-5420 dt. 16.9.2025][2025_HPIPH_114875_1]
|
HP Irrigation and Public Health||Bilaspur Circle,Irrigation and Public Health,HP |
42 |
16-Sep-2025 05:00 PM |
26-Sep-2025 11:00 AM |
26-Sep-2025 11:30 AM |
[Construction of Luned Khad bridge]
[NIT No. 4622-4680 dated 15.09.2025][2025_PWD_114914_1]
|
PWD |
43 |
16-Sep-2025 05:00 PM |
26-Sep-2025 11:00 AM |
26-Sep-2025 11:30 AM |
[Restoration of rain damage on Samote to Dramnallah road Km 0/0to 12/435]
[NIT No. 4622-4680 dated 15.09.2025][2025_PWD_114921_1]
|
PWD |
44 |
16-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
24-Sep-2025 01:30 PM |
[Counstruction of District Treasury office Una and DTO residence Una Distt. Una (H.P.) (SH- SITC of EPABX system therein)]
[NIT No. 3776-3800 dated 11/09/2025][2025_PWD_114917_1]
|
PWD |
45 |
16-Sep-2025 05:00 PM |
26-Sep-2025 11:00 AM |
26-Sep-2025 11:30 AM |
[Repair of Dehar Khad bridge at Rd 26/340]
[NIT No. 4622-4680 dated 15.09.2025][2025_PWD_114918_1]
|
PWD |
46 |
16-Sep-2025 05:00 PM |
27-Sep-2025 05:00 PM |
29-Sep-2025 12:30 PM |
[Removal of slip and Construction of Breast wall]
[HPPTCL/Bhaba/TENDER/2025-26/04][2025_HPPTC_114576_1]
|
HP Power Transmission Corporation limited||Projects||DGM (Shimla)||PIU Bhabhanagar |
47 |
16-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
24-Sep-2025 11:30 AM |
[Restoration of rain damages of LWSS Kot Mlahot in Tehsil Jhandutta Distt Bilaspur HP SH R/O RCC Storage tank at Malhot in GP Salwar]
[JSDJ-5321-5420 dt. 16.9.2025][2025_HPIPH_114907_1]
|
HP Irrigation and Public Health||Bilaspur Circle,Irrigation and Public Health,HP |
48 |
16-Sep-2025 05:00 PM |
23-Sep-2025 03:00 PM |
23-Sep-2025 03:30 PM |
[Restoration of rain damages Construction of retaining wall for protection of road and fencing at STP Summerhill STP ND Network. ]
[SJPNL/Sewerage/NIT/1805-09dt. 16.09.2025][2025_SJPNL_114893_1]
|
Shimla Jal Prabandhan Nigam Ltd |
49 |
16-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
24-Sep-2025 01:30 PM |
[Counstruction of District Treasury office at Una Distt. Una H.P. (H.P) (SH- Providing LAN and WIFI system therein) ]
[NIT No. 3776-3800 dated 11/09/2025][2025_PWD_114911_1]
|
PWD |
50 |
16-Sep-2025 05:00 PM |
26-Sep-2025 05:00 PM |
27-Sep-2025 11:00 AM |
[Construction of Farm Access Road at FIS Dhyari Dhalli Jadari ]
[NoAgrSLNDPMUJICAODAPhaseII G 99 2023-24-1308 ][2025_HPCDP_114900_1]
|
Himachal Pradesh Agriculture Development Society (JICA-ODA loan)||Project Director - HPCDP Project - JICA-ODA - Hamirpur||DPM-HPCDP - JICA-ODA - Solan |
51 |
16-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
24-Sep-2025 11:30 AM |
[Restoration of rain damages of LWSS Jhandutta Behran old in Tehsil Jhandutta Distt. Bilaspur HP SH Providing preliminary investigation on geological seismic sedimentation study foundation etc for construction of dam across the Seer Khad near Kabreta]
[JSDJ-5321-5420 dt. 16.9.2025][2025_HPIPH_114902_1]
|
HP Irrigation and Public Health||Bilaspur Circle,Irrigation and Public Health,HP |
52 |
16-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
24-Sep-2025 11:30 AM |
[Restoration of rain damages of LWSS Beheri Sanihra in Tehsil Jhandutta Distt Bilaspur HP SH Repair of RCC Storage tank of LWSS Bheri Sanihra in GP Sanihra]
[JSDJ-5321-5420 dt. 16.9.2025][2025_HPIPH_114889_1]
|
HP Irrigation and Public Health||Bilaspur Circle,Irrigation and Public Health,HP |
53 |
16-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
24-Sep-2025 11:30 AM |
[AR MO LWSS Samoh Bhajroun in Tehsil Jhandutta Distt. Bilaspur SH Repair of 125 HP centrifugal multistage pump mather and plat make 10 stage set No. 1 B SH Repair of 5 HP monosub KSB make set No1]
[JSDJ-5321-5420 dt. 16.9.2025][2025_HPIPH_114915_1]
|
HP Irrigation and Public Health||Bilaspur Circle,Irrigation and Public Health,HP |
54 |
16-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
24-Sep-2025 11:30 AM |
[RM of LWSS Paploa Gah Dhani in GP Paploa in Tehsil Jhandutta Distt. Bilaspur SH Laying jointing in trenches and testing of separate pipe line of various dia from existing tank at Kot to existing tank at Paploa under BASP]
[JSDJ-5321-5420 dt. 16.9.2025][2025_HPIPH_114910_1]
|
HP Irrigation and Public Health||Bilaspur Circle,Irrigation and Public Health,HP |
55 |
16-Sep-2025 05:00 PM |
26-Sep-2025 11:00 AM |
26-Sep-2025 11:30 AM |
[Restoration of rain damages due to laying of OFC on Shahpur Sihunta Chowari via Jot Bharmour road ]
[NIT No. 4622-4680 dated 15.09.2025][2025_PWD_114905_1]
|
PWD |
56 |
16-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
24-Sep-2025 11:30 AM |
[RM of LWSS Jejwin in GP Jejwin in Tehsil Jhandutta Distt. Bilaspur HP SH Dismantling and laying jointing in trenches and testing of GMS pipe line of various dia from Daroh tank to vill Sooh under BASP]
[JSDJ-5321-5420 dt. 16.9.2025][2025_HPIPH_114895_1]
|
HP Irrigation and Public Health||Bilaspur Circle,Irrigation and Public Health,HP |
57 |
16-Sep-2025 04:50 PM |
23-Sep-2025 11:30 AM |
23-Sep-2025 03:00 PM |
[Tender for prov. Aug of 1-ph to 3-ph LT to improve the low voltage in Baba Bankhandi Gurudwara village Bhanewal from the existing 25kva s/stn BW-4 UESD Haroli. T.S. No 68/25-26 , LOT new connection to newely build house of Sh. Sucha singh at vill Bal]
[NO/HED-132/2025-26][2025_HPSEB_113432_2]
|
HPSEBL||CE(OP) CZ Hamirpur||SE (OP) Una||Sr. Xen Haroli |
58 |
16-Sep-2025 04:40 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[A/R and M/O on narangpur to Nichla Thana road in km 0/0 to 1/00 (SH Patch work (MSS) in km 0/0 to 1/00) Under MMSRRY]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114923_1]
|
PWD |
59 |
16-Sep-2025 04:10 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[Restoration of rain damages on SKRN road in km 60/500 to 94/00 (SH P/L wire crate in R/wall at RD 67/780 to 67/810).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114919_1]
|
PWD |
60 |
16-Sep-2025 04:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/O rain damages on Ramshehar Sunna Nerli road in km 0/0 to 25/070 (SH P/L wire crate in R/wall at RD 7/580 to 7/600).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114912_1]
|
PWD |
61 |
16-Sep-2025 04:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/O rain damages on Ramshehar Sunna nerli road in km 0/0 to 25/070 (SH P/L Wire crates in R/wall at RD 7/225 to 7/445).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114909_1]
|
PWD |
62 |
16-Sep-2025 04:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 12:00 PM |
[Tender for construction of Division office building at newly created ED, Haroli. Ch. To-Board Building T.S No. 88-2025-26 Bid No. HED-133-2025-26 ]
[NO/HED-133/2025-26][2025_HPSEB_113558_2]
|
HPSEBL||CE(OP) CZ Hamirpur||SE (OP) Una||Sr. Xen Haroli |
63 |
16-Sep-2025 04:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[Supply of Explosive Material for the year 2025-26.]
[5544-45 dated 15.09.2025][2025_PWD_114901_1]
|
PWD |
64 |
16-Sep-2025 04:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[Supply of Explosive Material for the year 2025.26 ]
[5242-43 dated 15.09.2025][2025_PWD_114908_1]
|
PWD |
65 |
16-Sep-2025 03:30 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/O rain damages on Maloun Kusri road in km 15/00 to 17/300 (SH P/L B/wall at RD 16/840 to 16/860)]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114906_1]
|
PWD |
66 |
16-Sep-2025 03:30 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/O rain damages on Maloun Kusri road in km 15/00 to 17/300 (SH P/L wire crate in R/wall at RD 16/840 to 16/855).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114903_1]
|
PWD |
67 |
16-Sep-2025 03:10 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/R damages on various road in under Sectiom Diggal under Ramshehar sub Division HPPWD Ramshehar (SH Hiring of JCB with Breaker on hour basis).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114899_1]
|
PWD |
68 |
16-Sep-2025 03:00 PM |
22-Sep-2025 10:00 AM |
22-Sep-2025 11:30 AM |
[Tender for construction of Boundary wall at Electrical Campus Khad Co Main Gate for newly construction Sub-Division office Building Khad under ESD,HPSEBL Khad under ED, HPSEBL, Haroli Ch. To-Board Building T.S No. 90/2025-26 Bid No. HED-135/20]
[NO/HED-135/2025-26][2025_HPSEB_113580_2]
|
HPSEBL||CE(OP) CZ Hamirpur||SE (OP) Una||Sr. Xen Haroli |
69 |
16-Sep-2025 03:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 12:30 PM |
[Tender for Construction of Store and Record Room at newly created Electrical Division, HPSEBL, Haroli. Ch. To-Board Building T.S No. 89-2025-26 Bid No. HED-134-2025-26]
[NO/HED-134/2025-26][2025_HPSEB_113564_2]
|
HPSEBL||CE(OP) CZ Hamirpur||SE (OP) Una||Sr. Xen Haroli |
70 |
16-Sep-2025 03:00 PM |
24-Sep-2025 05:00 PM |
25-Sep-2025 11:00 AM |
[CO of FIS Lower Bebgya in GP Charang Tehsil Moorang Distt Kinnaur ]
[KNR-EE-JSD-Pooh-2025-7615-7715][2025_HPIPH_114885_1]
|
HP Irrigation and Public Health||Rekongpeo Circle,Irrigation and Public Health,HP||Pooh,Irrigation and Public Health,HP |
71 |
16-Sep-2025 03:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/R damages on various road in under Section Sunna Ramshehar sub Division HPPWD Ramshehar (SH Hiring of JCB with breaker on hour basis).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114897_1]
|
PWD |
72 |
16-Sep-2025 02:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/R damages on various road in Section Sunna under ramshehar sub Division HPPWD Ramshehar (SH Hiring of Tipper on hours basis).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114881_1]
|
PWD |
73 |
16-Sep-2025 02:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/R damages on various road in Section Diggal under ramshehar sub Division HPPWD Ramshehar (SH Hiring of Tipper on hours basis).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114888_1]
|
PWD |
74 |
16-Sep-2025 02:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/O rain damages on various road under Section diggal HPPWD Sub Division Ramshehar (SH Hiring Excavator 0.9 Cum bucket capacity). ]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114874_1]
|
PWD |
75 |
16-Sep-2025 02:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/R damages on various road in section Joghon under Nalagarh sub Division HPPWD Nalagarh (SH Hiring of Tipper on hours basis).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114879_1]
|
PWD |
76 |
16-Sep-2025 02:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/O rain damages on various road under HPPWD Sub Division Nalagarh (SH Hiring of Excavator 0.9 cum bucket capacity).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114877_1]
|
PWD |
77 |
16-Sep-2025 02:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/O rain damages on various road under section Sunna Section HPPWD Sub Division ramshehar (SH Hiring of Excavator 0.9 cum bucket capacity).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114876_1]
|
PWD |
78 |
16-Sep-2025 02:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/R and RD on Ramshehar Sunna Nerli road in km 0/0 to 25/070 (SH C/O B/wall at RD 0/900 to 0/915).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114870_1]
|
PWD |
79 |
16-Sep-2025 02:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[R/R damages on link road to village Dhar km 0/0 to 1/480 (SH C/O b/wall at RD 1/445 to 1/455).]
[NIT No. 4877-81 dated 12-09-2025][2025_PWD_114867_1]
|
PWD |
80 |
16-Sep-2025 01:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Annual Maintenance of 1 No. Passenger Lift Thyssen make Machine No. 8269 at Honble Governor Guest House Shimla-2 for Two years w.e.f 18.07.2025 to 17.07.2027.]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_17]
|
PWD |
81 |
16-Sep-2025 01:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Annual maintenance of 1 No. Service lift thyssen make machine No.S15546 at Armsdale Phase-II building at H.P Secretariat Shimla for Three years w.e.f.01-04.2025 to 31.03.2028]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_16]
|
PWD |
82 |
16-Sep-2025 01:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[AMC of EPABX/ IPPBX system at Nirman Bhawan Building, Nigam Vihar Shimla-2 for the year 2025-26 ( w.e.f 01-05-2025 to 30-04-2026).]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_15]
|
PWD |
83 |
16-Sep-2025 12:30 PM |
30-Sep-2025 01:00 PM |
01-Oct-2025 03:00 PM |
[SSD-571/2025]
[SSD-571/2025][2025_HPSEB_114705_1]
|
HPSEBL||CE(ES) Hamirpur||SE(Design) Hamirpur||Senior Executive Engineer-III |
84 |
16-Sep-2025 11:30 AM |
22-Sep-2025 11:00 AM |
23-Sep-2025 02:00 PM |
[Tender for improvement of existing Electrical Network from Old Circuit House to near BSNL Office in ( E) Section Keylong under ESD, HPSEBL, Keylong]
[HPSEBL/KLED/NIT-10/2025-26][2025_HPSEB_114757_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Keylong |
85 |
16-Sep-2025 11:00 AM |
22-Sep-2025 01:00 PM |
22-Sep-2025 03:00 PM |
[Repair and maintenance of Govt Sr. Secondary School Chabutra Building near Play Ground ]
[Repair and maintenance of Govt Sr. Secondary School Chabutra Building near Play Ground ][2025_PWD_114779_1]
|
PWD |
86 |
16-Sep-2025 11:00 AM |
22-Sep-2025 01:00 PM |
22-Sep-2025 03:00 PM |
[Construction of link road to Harizan Basti Lambera Km. 0/00 to 0/400]
[Construction of link road to Harizan Basti Lambera Km. 0/00 to 0/400][2025_PWD_114784_1]
|
PWD |
87 |
16-Sep-2025 11:00 AM |
22-Sep-2025 01:00 PM |
22-Sep-2025 03:00 PM |
[Repair and restoration of rain damages on Nanot to Bakkar Khad via Jamli road Repair and restoration of rain damages on Nanot to Bakkar Khad via Jamli road Km. 0/0 to 4/00 ]
[Repair and restoration of rain damages on Nanot to Bakkar Khad via Jamli road ][2025_PWD_114798_1]
|
PWD |
88 |
16-Sep-2025 11:00 AM |
22-Sep-2025 01:00 PM |
22-Sep-2025 03:00 PM |
[Repair and restoration of rain damages on Uhal to Bakkar Khad via Parnali road 0/0 to 6/100]
[Repair and restoration of rain damages on Uhal to Bakkar Khad via Parnali road 0/0 to 6/100][2025_PWD_114802_1]
|
PWD |
89 |
16-Sep-2025 11:00 AM |
22-Sep-2025 01:00 PM |
22-Sep-2025 03:00 PM |
[Repair and restoration of rain damages on Uhal to Bakkar Khad via Parnali road 0/0 to 6/100]
[Repair and restoration of rain damages on Uhal to Bakkar Khad via Parnali road 0/0 to 6/100][2025_PWD_114793_1]
|
PWD |
90 |
16-Sep-2025 11:00 AM |
22-Sep-2025 01:00 PM |
22-Sep-2025 03:00 PM |
[Repair and restoration of rain damages on Uhal to Bakkar Khad via Parnali road 0/0 to 6/100]
[Repair and restoration of rain damages on Uhal to Bakkar Khad via Parnali road 0/0 to 6/100][2025_PWD_114822_1]
|
PWD |
91 |
16-Sep-2025 11:00 AM |
22-Sep-2025 01:00 PM |
22-Sep-2025 03:00 PM |
[C/o link road from Dhangu to Kohlwin Km. 0/0 to 5/0]
[C/o link road from Dhangu to Kohlwin Km. 0/0 to 5/0][2025_PWD_114810_1]
|
PWD |
92 |
16-Sep-2025 11:00 AM |
22-Sep-2025 01:00 PM |
22-Sep-2025 03:00 PM |
[Repair and Maintenance work of Veterinary Hospital Building at Tauni Devi Distt. Hamirpur ]
[Repair and Maintenance work of Veterinary Hospital Building at Tauni Devi Distt. Hamirpur ][2025_PWD_114817_1]
|
PWD |
93 |
16-Sep-2025 10:45 AM |
21-Sep-2025 11:00 AM |
21-Sep-2025 11:30 AM |
[R/R damages on Kharyana to Ranopul road km 0/00 to 2/500 ]
[8646-55 dated 09.09.2025][2025_PWD_114861_1]
|
PWD |
94 |
16-Sep-2025 10:30 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:00 AM |
[Restoration of rain damages on Shillai Naya Daya Kuhant Road Km 0/0 to 6/900 (SH. P/L G-III and 25mm Bituminous Concrete in Km 2/00 to 5/00) Under PDNA]
[NIT 5700-5800 dated 10.09.2025][2025_PWD_114812_6]
|
PWD |
95 |
16-Sep-2025 10:30 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:00 AM |
[Restoration of rain damages on Gangtoli to Bambal Road Km 0/0 to 4/555 (SH. P/L Bituminous Concrete in Km 2/300 to 4/500) Under PDNA]
[NIT 5700-5800 dated 10.09.2025][2025_PWD_114812_2]
|
PWD |
96 |
16-Sep-2025 10:30 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:00 AM |
[Restoration of rain damages on Shillai Achhoti Pandiyat Road Km 0/0 to 7/500 (SH. C/o 3.00 Mtr Span Slab Culvert at RD 1/130) Under PDNA]
[NIT 5700-5800 dated 10.09.2025][2025_PWD_114812_5]
|
PWD |
97 |
16-Sep-2025 10:30 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:00 AM |
[Restoration of rain damages on Shillai Achhoti Pandiyat Road Km 0/0 to 7/500 (SH. C/o 3.00 Mtr Span Slab Culvert at RD 1/195) Under PDNA]
[NIT 5700-5800 dated 10.09.2025][2025_PWD_114812_4]
|
PWD |
98 |
16-Sep-2025 10:30 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:00 AM |
[Restoration of rain damages on Link Road Shillai to Bella Bashwa Km 0/0 to 6/200 (SH. C/O B/wall in Wire Crate at RD 1/810 to 1/825 and RD 2/600 to 2/630) Under PDNA]
[NIT 5700-5800 dated 10.09.2025][2025_PWD_114812_7]
|
PWD |
99 |
16-Sep-2025 10:30 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:00 AM |
[Restoration of rain damages on Shillai Achhoti Pandiyat Road Km 0/0 to 7/500 (SH. C/o 3.00 Mtr Span Slab Culvert at RD 1/060) Under PDNA]
[NIT 5700-5800 dated 10.09.2025][2025_PWD_114812_3]
|
PWD |
100 |
16-Sep-2025 10:30 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:00 AM |
[Restoration of rain damages on link road from Kando Dugana to Shamah Pamta Km 0/0 to 5/870 (SH. P/L Sub Base, Base Course and M/T in Km 2/00 to 3/400) Under PDNA]
[NIT 5700-5800 dated 10.09.2025][2025_PWD_114812_1]
|
PWD |
101 |
16-Sep-2025 10:25 AM |
21-Sep-2025 10:30 AM |
21-Sep-2025 11:30 AM |
[R/R damages to Shihardi Musalmana to Shihardi Chamaran road in Km 0/00 to 1/200]
[8646-55 dated 09.09.2025][2025_PWD_114859_1]
|
PWD |
102 |
16-Sep-2025 10:20 AM |
21-Sep-2025 10:30 AM |
21-Sep-2025 11:30 AM |
[R/R damages on Shaktight to Shamaghat road in km 0/00 to 14/00 ]
[8646-55 dated 09.09.2025][2025_PWD_114857_1]
|
PWD |
103 |
16-Sep-2025 10:15 AM |
21-Sep-2025 10:30 AM |
21-Sep-2025 11:30 AM |
[Annual maintenance plan for the year 2025-26 on Gandhi Gram Tarol via Green Hills road in km 0/00 to 8/00 ]
[8646-55 dated 09.09.2025][2025_PWD_114858_1]
|
PWD |
104 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Luddu to Gharmani road km 0/0 to 7/00 (Sub Head Construction of PCC retaining wall at Rd 2/300 to 2/380 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_19]
|
PWD |
105 |
16-Sep-2025 10:00 AM |
21-Sep-2025 10:30 AM |
21-Sep-2025 11:30 AM |
[R/R damages on Barotiwala to Mandhala Gunai road in km 16/900 to 26/135]
[8646-55 dated 09.09.2025][2025_PWD_114853_1]
|
PWD |
106 |
16-Sep-2025 10:00 AM |
21-Sep-2025 10:30 AM |
21-Sep-2025 11:30 AM |
[R/R damages on Barotiwala to Mandhala Gunai road in km 16/900 to 26/135]
[8646-55 dated 09.09.2025][2025_PWD_114854_1]
|
PWD |
107 |
16-Sep-2025 10:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 10:00 AM |
[AMC of one No. passenger cum bed elevator Thyssen Krupp make Machine No. ALM L5320 installed in New OPD Block at IGMC Shimla. 15.09.2025 to 14.09.2026]
[ED.II.TA.TENDER-25-26-1323 dt. 11-09-2025][2025_PWD_114499_3]
|
PWD |
108 |
16-Sep-2025 10:00 AM |
21-Sep-2025 10:30 AM |
21-Sep-2025 11:30 AM |
[R/R damages on Barotiwala to Mandhala Gunai road in km 16/900 to 26/135]
[8646-55 dated 09.09.2025][2025_PWD_114855_1]
|
PWD |
109 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Chamba Tissa road km 0/0 to 5/500 (Sub Head Construction of PCC retaining wall at Rd 1/00 to 1/070 to 2/00 to 2/070 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_13]
|
PWD |
110 |
16-Sep-2025 10:00 AM |
03-Oct-2025 10:00 AM |
04-Oct-2025 11:30 AM |
[R.M. of E.I. various N.R. Govt. Building at SLBSGMC and H Nerchowk in Distt. Mandi HP. SH- Replacement of damaged insulated M.S. chilled water pipe 150mm 32mm thick insulated existing from Nursing college Building Auditorium building]
[No.PW-MED-TA-Tender-2025- 3197-3211 Dtaed- 05.09.2025][2025_PWD_114813_6]
|
PWD |
111 |
16-Sep-2025 10:00 AM |
03-Oct-2025 10:00 AM |
04-Oct-2025 11:30 AM |
[Providing AMF panel and armored cable for connection at DG set of Regional Research Institute Ayurveda Building at Pandoh Distt. Mandi ]
[No.PW-MED-TA-Tender-2025- 3197-3211 Dtaed- 05.09.2025][2025_PWD_114813_5]
|
PWD |
112 |
16-Sep-2025 10:00 AM |
21-Sep-2025 10:30 AM |
21-Sep-2025 11:30 AM |
[R/R damages on Barotiwala to Mandhala Gunai road in km 16/900 to 26/135]
[8646-55 dated 09.09.2025][2025_PWD_114856_1]
|
PWD |
113 |
16-Sep-2025 10:00 AM |
03-Oct-2025 10:00 AM |
04-Oct-2025 11:30 AM |
[Providing Main Panel for E.I. in CHC Building Gohar Tehsil Chachiot Distt. Mandi HP]
[No.PW-MED-TA-Tender-2025- 3197-3211 Dtaed- 05.09.2025][2025_PWD_114813_7]
|
PWD |
114 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Maredi to Sillagharat road km 0/0 to 14/00 (Sub Head Construction of PCC retaining wall at Rd 5/120 to 5/160 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_18]
|
PWD |
115 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Kiri Lagga road km 0/0 to 5/00 (Sub Head Construction of PCC retaining wall at Rd 3/510 to 3/210 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_17]
|
PWD |
116 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Sahoo to Kiri road km 0/0 to 5/00 (Sub Head Construction of PCC retaining wall at Rd 2/210 to 2/230 and breast wall at Rd 2/880 to 290 , 2/900 to 3/00 and 3/380 to 3/400 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_16]
|
PWD |
117 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Rodi Gaila Gatyanu road km 0/0 to 7/00 (Sub Head Construction of PCC retaining wall at Rd 0/180 to 0/190 and 0/435 to 0/450) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_15]
|
PWD |
118 |
16-Sep-2025 10:00 AM |
23-Sep-2025 10:30 AM |
23-Sep-2025 11:00 AM |
[Restoration of Rain Damages on various road under Swarghat Sub-Division (Swahan Section)]
[Restoration of Rain Damages on various road under Swarghat Sub-Division (Swahan Section)][2025_PWD_114846_1]
|
PWD |
119 |
16-Sep-2025 10:00 AM |
03-Oct-2025 10:00 AM |
04-Oct-2025 11:30 AM |
[C.o of Atal Aadrash Vidyalaya at Marhi Tehsil Dharampur Distt. Mandi Boyes Hostel for 172 students SH- Providing E.I. therein.]
[No.PW-MED-TA-Tender-2025- 3197-3211 Dtaed- 05.09.2025][2025_PWD_114813_8]
|
PWD |
120 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Talai to Chilbangla road km 0/0 to 1/900 (Sub Head Construction of PCC retaining wall at Rd 0/820 to 0/840 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_14]
|
PWD |
121 |
16-Sep-2025 10:00 AM |
23-Sep-2025 10:30 AM |
23-Sep-2025 11:00 AM |
[Repair and Maintenance on Thatch Sikroha Neri Jukhala road km 0/00 to 18/690]
[Repair and Maintenance on Thatch Sikroha Neri Jukhala road km 0/00 to 18/690][2025_PWD_114848_1]
|
PWD |
122 |
16-Sep-2025 10:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 10:00 AM |
[Providing replacement of E.I. and safety devices in library Theog in District Shimla]
[ED.II.TA.TENDER-25-26-1323 dt. 11-09-2025][2025_PWD_114499_1]
|
PWD |
123 |
16-Sep-2025 10:00 AM |
03-Oct-2025 10:00 AM |
04-Oct-2025 11:30 AM |
[Siri Laxmi Naryan Temple at Raila Tehsil Sainj Distt. Kullu HP. SH Providing and Fixing Chandlier and spot light]
[No.PW-MED-TA-Tender-2025- 3197-3211 Dtaed- 05.09.2025][2025_PWD_114813_4]
|
PWD |
124 |
16-Sep-2025 10:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 10:00 AM |
[AMC of one No. passenger cum bed elevator Thyssen Krupp make Machine No. ALM L5320 installed in Block C of nurses and gilrs hostel at IGMC Shimla. w.e.f. 15.09.2025 to 14.09.26]
[ED.II.TA.TENDER-25-26-1323 dt. 11-09-2025][2025_PWD_114499_4]
|
PWD |
125 |
16-Sep-2025 10:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 10:00 AM |
[Annual maintenance contract for VRV system installed in VRV system installed in Trauma Block at IGMC Shimla.]
[ED.II.TA.TENDER-25-26-1323 dt. 11-09-2025][2025_PWD_114536_1]
|
PWD |
126 |
16-Sep-2025 10:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 10:00 AM |
[Providing staff for day to day maintenance at Civil Hospital Chopal under ESD Theog District Shimla. 21.06.2025 to 20.06.2026]
[ED.II.TA.TENDER-25-26-1323 dt. 11-09-2025][2025_PWD_114536_2]
|
PWD |
127 |
16-Sep-2025 10:00 AM |
23-Sep-2025 10:30 AM |
23-Sep-2025 11:00 AM |
[Restoration of Rain Damages on various road under Swarghat Sub-Division (Baner Section)]
[Restoration of Rain Damages on various road under Swarghat Sub-Division (Baner Section)][2025_PWD_114845_1]
|
PWD |
128 |
16-Sep-2025 10:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 10:00 AM |
[Providing staff for day to day maintenance at Civil Hospital Rohru under ESD Theog District Shimla.01.07.25 to 31.12.25 ]
[ED.II.TA.TENDER-25-26-1323 dt. 11-09-2025][2025_PWD_114536_4]
|
PWD |
129 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Sandhi Mani Sirh Sarol road km 0/0 to 14/00 (Sub Head Construction of PCC retaining wall at Rd 32/500 to 32/518.10 and 32/460 to 32/511) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_12]
|
PWD |
130 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Kiri to Guwari (portion Kalei to Bhalla) road km 0/0 to 14/00 (Sub Head Construction of PCC retaining wall at Rd 0/030 to 0/060 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_11]
|
PWD |
131 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Chamba Banikhet via Above Parel road km 0/0 to 14/00 (Sub Head Construction of PCC retaining wall at Rd0/030 to 0/055 and 1/635 to 1/673 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_10]
|
PWD |
132 |
16-Sep-2025 10:00 AM |
03-Oct-2025 10:00 AM |
04-Oct-2025 11:30 AM |
[C.o Govt. Sr. Sec. School at Deori Distt. Mandi HP. SH- Providing E.I. theren]
[No.PW-MED-TA-Tender-2025- 3197-3211 Dtaed- 05.09.2025][2025_PWD_114813_3]
|
PWD |
133 |
16-Sep-2025 10:00 AM |
03-Oct-2025 10:00 AM |
04-Oct-2025 11:30 AM |
[C.o PHC Building at Saichu Tehsil Killar Distt. Chamba HP SH-Providing E.I. therein]
[No.PW-MED-TA-Tender-2025- 3197-3211 Dtaed- 05.09.2025][2025_PWD_114813_2]
|
PWD |
134 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Parel Kohlari road km 0/0 to 12/500 (Sub Head Construction of PCC retaining wall at Rd 4/700 to 4/722 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_9]
|
PWD |
135 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Devidehra Bakhatpur road km 0/0 to 3/500 (Sub Head Construction of PCC retaining wall at Rd 0/270 to 0/275 and 1/765 to 1/788 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_7]
|
PWD |
136 |
16-Sep-2025 10:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 10:00 AM |
[Providing staff for day to day maintenance under HPPWD B and R Division Rohru under ESD Theog District Shimla. 01.06.2025 to 31.05.2026]
[ED.II.TA.TENDER-25-26-1323 dt. 11-09-2025][2025_PWD_114536_3]
|
PWD |
137 |
16-Sep-2025 10:00 AM |
03-Oct-2025 10:00 AM |
04-Oct-2025 11:30 AM |
[Annual Maintenance and contract for one number 8 Passenger Elevator Equipment No.44918151 Make KONE installed in warehouse for EVM and VVPAT Building at Bhuili Distt. Mandi HP for three year]
[No.PW-MED-TA-Tender-2025- 3197-3211 Dtaed- 05.09.2025][2025_PWD_114803_1]
|
PWD |
138 |
16-Sep-2025 10:00 AM |
03-Oct-2025 10:00 AM |
04-Oct-2025 11:30 AM |
[Supplying Installation, Testing and Commissioning of 20 KVA DG SET at NCC Hanger Kullu Manali Airport Bhuntar Distt. Kullu HP. ]
[No.PW-MED-TA-Tender-2025- 3197-3211 Dtaed- 05.09.2025][2025_PWD_114813_1]
|
PWD |
139 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Kolka Jatkari road km 8/200 (Sub Head Construction of PCC retaining wall at Rd 0/380 to 0/390 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_6]
|
PWD |
140 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:35 AM |
[Restoration of Rain damages on Rajera Dhullara road km 0/0 to 15/500 (Sub Head Construction of PCC retaining wall at Rd5/530 to 5/550 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_8]
|
PWD |
141 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Chamba Khajjiar road km 19/00 (Sub Head Construction of PCC retaining wall at Rd 9/980 to 9/995 , 13/050 to 13/074 and 13/740 to 13/761.50) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_2]
|
PWD |
142 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Bhanera Kolka road km 5/370 (Sub Head Construction of PCC retaining wall at Rd 0/090 to 0/095 and 1/00 to 1/017 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_5]
|
PWD |
143 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Chamba Khajjiar road km 19/00 (Sub Head Construction of PCC retaining wall at Rd 5/610 to 5/631.50 and 7/110 to 7/143) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_1]
|
PWD |
144 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Chamba Khajjiar road km 19/00 (Sub Head Construction of PCC retaining wall at Rd 15/620 to 15/644 , 16/030 to 16/046 and 17/600 to 17/616 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_3]
|
PWD |
145 |
16-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Restoration of Rain damages on Shahpur Sihunta Chowari Chamba via Jot road km 76/0 to 87/0 (Sub Head Construction of PCC retaining wall at Rd 82/215 to 82/220 , 82/500 to 82/512 and 82/575 to 82/587 ) Against PDNA-2023]
[No. PWD-WA-II/Contract/2025-26- 13688-787 Dated 10.09.25][2025_PWD_114791_4]
|
PWD |
146 |
16-Sep-2025 09:00 AM |
23-Sep-2025 03:00 PM |
24-Sep-2025 11:00 AM |
[HPSEBL/ESDU-08-2025-26]
[HPSEBL/ESDU-08-2025-26][2025_HPSEB_114824_1]
|
HPSEBL||CE(ES) Hamirpur||SE(ES) Hamirpur||Sr. Xen (ES) Una (Rakkar) |
147 |
16-Sep-2025 09:00 AM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Restoration/Reconstruction on Gowal Tikker to Mahesh Garh Road km 0/00 to 3/380 ]
[PWD/BD/NIT/2024-25/-8667-8717 dated 10.09.2025][2025_PWD_114767_5]
|
PWD |
148 |
16-Sep-2025 09:00 AM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Restoration / Reconstruction on Chobin Sansai road km 0/00 to 13/780 ]
[PWD/BD/NIT/2024-25/-8667-8717 dated 10.09.2025][2025_PWD_114767_4]
|
PWD |
149 |
16-Sep-2025 09:00 AM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Restoration / Reconstruction on Sansai to Dhandole road km 0/00 to 9/00 ]
[PWD/BD/NIT/2024-25/-8667-8717 dated 10.09.2025][2025_PWD_114767_3]
|
PWD |
150 |
16-Sep-2025 09:00 AM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Restoration / Reconstruction on Doli Khurd to Chordu Dhangore road km 0/00 to 4/950 ]
[PWD/BD/NIT/2024-25/-8667-8717 dated 10.09.2025][2025_PWD_114767_2]
|
PWD |
151 |
16-Sep-2025 09:00 AM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Restoration/Reconstruction on Link road from N.H. Kukaina to Nauri km 0/00 to 3/600 ]
[PWD/BD/NIT/2024-25/-8667-8717 dated 10.09.2025][2025_PWD_114767_1]
|
PWD |
152 |
16-Sep-2025 09:00 AM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Restoration/Reconstruction on Chobin Sansai road km 0/00 to 13/780 ]
[PWD/BD/NIT/2024-25/-8667-8717 dated 10.09.2025][2025_PWD_114755_6]
|
PWD |
153 |
16-Sep-2025 09:00 AM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Restoration/Reconstruction on Gowal Tikker to Mahesh Garh Road km 0/00 to 3/380 ]
[PWD/BD/NIT/2024-25/-8667-8717 dated 10.09.2025][2025_PWD_114755_5]
|
PWD |
154 |
16-Sep-2025 09:00 AM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Reconstruction/Restoration on Bir to Badagran Road km 0/00 to 32/00 ]
[PWD/BD/NIT/2024-25/-8667-8717 dated 10.09.2025][2025_PWD_114755_3]
|
PWD |
155 |
16-Sep-2025 09:00 AM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Reconstruction/Restoration on Bir to Badagran Road km 0/00 to 32/00 ]
[PWD/BD/NIT/2024-25/-8667-8717 dated 10.09.2025][2025_PWD_114755_2]
|
PWD |
156 |
16-Sep-2025 09:00 AM |
23-Sep-2025 09:00 AM |
23-Sep-2025 11:00 AM |
[Restoration of rain damages on link road from G.T.B. road to village Baloh km 0/00 to 1/510 SH CC/o V-shape drain at Rd 1/060 to 1/260, U-shape Drain at Rd 0/780 to 1/00, B/wall at Rd 0/970 to 1/00, 1/030 to 1/050, Interlocking Paver Block at Rd 0/]
[7626-30 dated 15/9/2025][2025_PWD_114835_2]
|
PWD |
157 |
16-Sep-2025 09:00 AM |
23-Sep-2025 09:00 AM |
23-Sep-2025 11:00 AM |
[Restoration of rain damages of link road Jol to Domehar road km 0/00 to 3/270 SH Construction of drain in between 0/600 to 0/800 at various Rds Under PDNA Year 2023]
[7626-30 dated 15/9/2025][2025_PWD_114835_1]
|
PWD |
158 |
16-Sep-2025 09:00 AM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Restoration/Rconstruction on Road from Dhandole to Khela Ghangole km 0/00 to 2/500 ]
[PWD/BD/NIT/2024-25/-8667-8717 dated 10.09.2025][2025_PWD_114755_4]
|
PWD |
159 |
16-Sep-2025 09:00 AM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Restoration/Reconstruction of Tashizong Jhikli Beth Ghorpith Averi road km 0/00 to 8/915 (SCA Deposit ) ]
[PWD/BD/NIT/2024-25/-8667-8717 dated 10.09.2025][2025_PWD_114755_1]
|
PWD |
160 |
16-Sep-2025 09:00 AM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Restoration/Reconstruction on Barot to Polling road km 0/00 to 9/00 ]
[PWD/BD/NIT/2024-25/-8667-8717 dated 10.09.2025][2025_PWD_114788_1]
|
PWD |
161 |
16-Sep-2025 09:00 AM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Restoration/Reconstruction of Chobu Bhullana road km 0/00 to 8/00 (SCA Deposit) ]
[PWD/BD/NIT/2024-25/-8667-8717 dated 10.09.2025][2025_PWD_114783_1]
|
PWD |
162 |
15-Sep-2025 06:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 02:00 PM |
[HPSEBL/BED/DB-Tender JOB No.35/25-26]
[HPSEBL/BED/DB-Tender JOB No.35/25-26][2025_HPSEB_114834_1]
|
HPSEBL||CE(OP) South||SE(OP) Solan||Sr.Xen (E) Baddi |
163 |
15-Sep-2025 06:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 02:00 PM |
[HPSEBL/BED/DB-Tender JOB No.37/25-26]
[HPSEBL/BED/DB-Tender JOB No.37/25-26][2025_HPSEB_114838_1]
|
HPSEBL||CE(OP) South||SE(OP) Solan||Sr.Xen (E) Baddi |
164 |
15-Sep-2025 06:00 PM |
20-Sep-2025 06:00 PM |
22-Sep-2025 11:30 AM |
[Restoration of Rain damages to various WSS/LWSS under JSV Section Larji and Sainj Under JSV Sub-Division Larji in Tehsil Sainj Distt. Kullu (H.P) SH Providing and Supplying of G.I Fittings of various locations under JSV Sub Division Larji )]
[NIT No. 7219-7318 dt. 15.09.2025][2025_HPIPH_114805_7]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
165 |
15-Sep-2025 06:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 02:00 PM |
[HPSEBL/BED/DB-Tender JOB No.36/25-26]
[HPSEBL/BED/DB-Tender JOB No.36/25-26][2025_HPSEB_114837_1]
|
HPSEBL||CE(OP) South||SE(OP) Solan||Sr.Xen (E) Baddi |
166 |
15-Sep-2025 06:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[RO of Central Heating Plant in State Vigilance and ACB office building Shimla-2 w.e.f 01.11.2025 to 15.03.2026]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_14]
|
PWD |
167 |
15-Sep-2025 06:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[RO of Central Heating Plant in Directorate Public relation office building at Majitha House . Shimla-2 w.e.f 01.11.2025 to 15.03.2026]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_13]
|
PWD |
168 |
15-Sep-2025 06:00 PM |
01-Oct-2025 11:00 AM |
01-Oct-2025 11:30 AM |
[Restoration of Rain Damages to LWSS Daulatpur Jalari ]
[EE/JSDK/NIT/2025-3078-3127 dated-15/09/2025 ][2025_HPIPH_114811_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Jal Shakti Division Kangra |
169 |
15-Sep-2025 06:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[RO of Central Heating Plant in Armsdale Phase-I Building at HP Sectt. Shimla-2 w.e.f 01.11.2025 to 15.03.2026]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_12]
|
PWD |
170 |
15-Sep-2025 06:00 PM |
01-Oct-2025 11:00 AM |
01-Oct-2025 11:30 AM |
[Construction of underground storage Tank of 50000 liters capacity District Kangra ]
[EE/JSDK/NIT/2025-3078-3127 dated-15/09/2025 ][2025_HPIPH_114823_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Jal Shakti Division Kangra |
171 |
15-Sep-2025 06:00 PM |
01-Oct-2025 11:00 AM |
01-Oct-2025 11:30 AM |
[Annual Repair and maintenance of JSV Sub-Division Ranital ]
[No.EE/JSDK/NIT/2025-3078-3127 dated-15/09/2025 ][2025_HPIPH_114800_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Jal Shakti Division Kangra |
172 |
15-Sep-2025 06:00 PM |
01-Oct-2025 11:00 AM |
01-Oct-2025 11:30 AM |
[Operation and maintenance of water sample testing laboratory at JSV Sub-Division Kangra]
[EE/JSDK/NIT/2025-3078-3127 dated-15/09/2025 ][2025_HPIPH_114818_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Jal Shakti Division Kangra |
173 |
15-Sep-2025 06:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[RO of Central Heating Plant in Ellerslie Building at HP Sectt. Shimla-2 w.e.f 01.11.2025 to 15.03.2026]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_11]
|
PWD |
174 |
15-Sep-2025 06:00 PM |
01-Oct-2025 11:00 AM |
01-Oct-2025 11:30 AM |
[Improvement of LWSS Gahlian Thakurdwara LWSS Rajiana and Ranital ]
[EE/JSDK/NIT/2025-3078-3127 dated-15/09/2025 ][2025_HPIPH_114808_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Jal Shakti Division Kangra |
175 |
15-Sep-2025 06:00 PM |
01-Oct-2025 11:00 AM |
01-Oct-2025 11:30 AM |
[Providing sewerage system to Kangra town ]
[EE/JSDK/NIT/2025-3078-3127 dated-15/09/2025 ][2025_HPIPH_114827_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Jal Shakti Division Kangra |
176 |
15-Sep-2025 06:00 PM |
01-Oct-2025 11:00 AM |
01-Oct-2025 11:30 AM |
[Drilling of bore well and installation of submersible pump for bore well at Govt. College Matour ]
[EE/JSDK/NIT/2025-3078-3127 dated-15/09/2025 ][2025_HPIPH_114830_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Jal Shakti Division Kangra |
177 |
15-Sep-2025 05:50 PM |
20-Sep-2025 05:50 PM |
22-Sep-2025 11:30 AM |
[Restoration of rain Damages to WSS Hat Bajaura, Kalehli in G.P Bajaura in Tehsil Bhunter Distt. Kullu (HP) ]
[NIT No. 7219-7318 dt. 15.09.2025][2025_HPIPH_114805_6]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
178 |
15-Sep-2025 05:30 PM |
20-Sep-2025 05:30 PM |
22-Sep-2025 11:30 AM |
[Restoration of Rain Damages to providing LWSS to PC habitation Dodniage Bhatgran in Tehsil Bhuntar Distt. Kullu HP.(SH- Providing and erection of pumping machinery)]
[NIT No. 7219-7318 dt. 15.09.2025][2025_HPIPH_114805_5]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
179 |
15-Sep-2025 05:15 PM |
20-Sep-2025 05:15 PM |
22-Sep-2025 11:30 AM |
[Restoration of Rain Damages to providing LWSS to PC habitation Dodniage Bhatgran in Tehsil Bhuntar Distt. Kullu HP.(SH-Drilling ,lowering of 1 No bore well 60 Mtr. deep)]
[NIT No. 7219-7318 dt. 15.09.2025][2025_HPIPH_114805_4]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
180 |
15-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:30 AM |
[Restoration of Rain damages to various WSS under JSV Sub Division Larji in Tehsil Banjar Distt. Kullu (H.P) ]
[NIT No. 7219-7318 dt. 15.09.2025][2025_HPIPH_114805_3]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
181 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[RO of Central Heating Plant in Armsdale Phase-III Building at HP Sectt. Shimla-2 w.e.f 01.11.2025 to 15.03.2026]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_8]
|
PWD |
182 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[RO of Central Heating Plant in Honble Governor residence Rajbhawan Shimla-2 w.e.f 01.11.2025 to 15.03.2026]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_4]
|
PWD |
183 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[RO of Central Heating Plant in Block-A-B and C of Nirman Bhawan Building at Nigam Vihar Shimla for the year 2025-26 i.e form 01.11.2025 to 15.03.2025.]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_7]
|
PWD |
184 |
15-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:30 AM |
[Emergency work of Restoration of Rain Damages ( Cloud Brust) to LWSS Railla and its adjoining area in Tehsil Banjar, Distt. Kullu (H.P.) ]
[NIT No. 7219-7318 dt. 15.09.2025][2025_HPIPH_114805_1]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
185 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[RO of Central Heating Plant in Block-D of Nirman Bhawan Building at Nigam Vihar Shimla for the year 2025-26 i.e form 01.11.2025 to 15.03.2025.]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_6]
|
PWD |
186 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Annual maintenance contract of various essential electrical components like electrical installation D.G set, Air Conditioner and CCTV system installed in Circuit House at Willy Park Shimla-4 for the period of 11.06.2025 to 10.06.2026.]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_3]
|
PWD |
187 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Providing 300 KVA Servo Voltage Stabilizer for computer UPS supply in Armsdale building of H.P Secretariat Shimla-9.]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_2]
|
PWD |
188 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Providing 300 KVA Servo voltage Stabilizer for Computer UPS supply in Ellerslie Building of H.P Secretariat Shimla-9.]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_1]
|
PWD |
189 |
15-Sep-2025 05:00 PM |
25-Sep-2025 05:00 PM |
26-Sep-2025 11:30 AM |
[Upgradation of Sewerage Treatment Plant Sundernagar and providing connectivity to leftout area under MC Sundernagar Distt. Mandi H.P. ]
[EE JSD SNR TA etender 2025-8410-40 dt. 15.09.2025][2025_HPIPH_114795_1]
|
HP Irrigation and Public Health||S Nagar Circle,Irrigation and Public Health,HP||S.nagar,Irrigation and Public Health,HP |
190 |
15-Sep-2025 05:00 PM |
22-Sep-2025 11:30 AM |
22-Sep-2025 03:30 PM |
[Cutting, looping and pruning of tree branches underneath HT lines in Electrical Sub-Division No.I, HPSEBL, Jogindernagar under Electrical Division, HPSEBL, Joginder Nagar.]
[JED-61/2025-26][2025_HPSEB_114799_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Mandi||Sr. Xen (E) J/ Nager |
191 |
15-Sep-2025 05:00 PM |
25-Sep-2025 05:00 PM |
26-Sep-2025 11:30 AM |
[Repair and maintenance of Sewerage Scheme Sundernagar Town in Tehsil Sundernagar Distt. Mandi H.P. ]
[EE JSD SNR TA etender/2025-8441-70 dt. 15.09.2025][2025_HPIPH_114789_1]
|
HP Irrigation and Public Health||S Nagar Circle,Irrigation and Public Health,HP||S.nagar,Irrigation and Public Health,HP |
192 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[RO of Central Heating Plant in Armsdale Phase-II and Yojna Bhawan Building at HP Sectt. Shimla-2 w.e.f 01.11.2025 to 15.03.2026]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_9]
|
PWD |
193 |
15-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:30 AM |
[Restoration of Rain Damage to Providing LWSS to Railla Surrounding and its adjoining area in Tehsil Sainj Distt Kullu (H.P) ]
[NIT No. 7219-7318 dt. 15.09.2025][2025_HPIPH_114805_2]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
194 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[RO of Central Heating Plant in Regional Ayurvedc Hospital RAH Building at Chotta . Shimla-2 w.e.f 01.11.2025 to 15.03.2026]
[Electrical Division-I dated 03.09.2025][2025_PWD_114796_5]
|
PWD |
195 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Providing Special repair to E.I in type VI set No. 9 at Melhi Shimla-9.]
[Electrical Division-I dated 03.09.2025][2025_PWD_114761_7]
|
PWD |
196 |
15-Sep-2025 05:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[Repair and Restoration of Rain Damages link road from Madan Lal Ex Pardhan Roshan Lal Di Hatti to Fish Farm Deoli km 000 to 2050, SH Construction of Retaining wall between RD 0300 to 0330 and 0400 to 0425 Under PDNA 2023]
[REPAIR AND RESTORATION OF RAIN DAMAGES LINK ROAD FROM MADAN LAL EX PARDHAN ROSHAN LAL DI HATTI ][2025_PWD_114770_1]
|
PWD |
197 |
15-Sep-2025 05:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[Repair and Restoration of Rain Damages Link road NH70 to Thaplan in GP Thaplan Km 000 to 8300 SH Construction of Retaining wall between RD 8170 to 8180 Under PDNA 2023]
[REPAIR AND RESTORATION OF RAIN DAMAGES LINK ROAD NH 70 THAPLAN IN GP THAPLAN ][2025_PWD_114777_1]
|
PWD |
198 |
15-Sep-2025 05:00 PM |
24-Sep-2025 05:00 PM |
25-Sep-2025 11:30 AM |
[Construction of FIS Kulal (SH Cutting in hard rock at RD 0/0 to 0/380]
[EE-Killar-Tender/25-2880-2900 dt 15-9-25][2025_HPIPH_114760_1]
|
HP Irrigation and Public Health||Chamba Circle,Irrigation and Public Health,HP |
199 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Repair of Seismic Vulnerability and Retrofit of Health and Lift Line building of Govt. Sr. Sec. School Girls Paonta Sahib under deposit head SH Providing Replacement of E.I in Govt. Sr. Sec. School Girls at Paonta Sahib.]
[Electrical Division-I dated 03.09.2025][2025_PWD_114761_3]
|
PWD |
200 |
15-Sep-2025 05:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[Repair and Restoration of Rain Damages Link road NH70 to Thaplan in GP Thaplan Km 000 to 8300 SH Construction of Retaining wall between RD 8240 to 8260 Under PDNA 2023]
[REPAIR AND RESTORATION OF RAIN DAMAGES LINK ROAD NH 70 THAPLAN IN GP THAPLAN][2025_PWD_114781_1]
|
PWD |
201 |
15-Sep-2025 05:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[Repair and Restoration of Rain Damages on Link road to Village Tattehra in GP Tatehra km 000 to 2250 SH Relaying Metalling and Tarring due to road crust damage and Drain Km 0200 to 0500 Under PDNA 2023]
[REPAIR AND RESTORATION OF RAIN DAMAGES LINK ROAD TO VILL. TETEHRA IN GP TATEHRA][2025_PWD_114762_1]
|
PWD |
202 |
15-Sep-2025 05:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[Repair and Restoration of Rain Damages on Link road to Village Loharli in GP Loharli Km 000 to 3165 SH CO 300 Mtr Span RCC slab culvert near GMS Khad Guzran at RD 1200 Under PDNA 2023]
[REPAIR AND RESTORATION OF RAIN DAMAGES LINK ROAD TO VILL. LOHARLI IN GP LOHARLI ][2025_PWD_114758_1]
|
PWD |
203 |
15-Sep-2025 05:00 PM |
22-Sep-2025 10:30 AM |
22-Sep-2025 03:00 PM |
[Tender for SOP to LWSS PC/FC Bithri Khad to Churag ,Bakhrot stage -1st (near Bithri )and 2nd Stage at Tikkar in Electrical section Bithri Under ESD Pangna. (Sub Head - Repair Maintenance of water storage and tank Residential building at Pangna)]
[184619/DB/2025-26-3304-09 Dated 15-09-2025][2025_HPSEB_114773_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Bilaspur||Sr. Xen (E) Karsog |
204 |
15-Sep-2025 05:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[Repair and Restoration of Rain Damages link road Dakha wala Khoo to Badoh in Gram Panchayat Badoh Km 0000 to 1500 SH PL Interlocking Concrete Paver Block in Km 0200 to 0340 and Drain in Km 0230 to 0430 Under PDNA 2023]
[REPAIR AND RESTORATION OF RAIN DAMAGES LINK ROAD DAKHA WALA KHOO TO BADOH IN GRAM PANCHYAT BADOH][2025_PWD_114754_1]
|
PWD |
205 |
15-Sep-2025 05:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[Repair and Restoration of Rain Damages Link Road Chintpurni Amlehar Road via Dhalwari Km 8500 to 12000 SH Co Retaining wall RD 8800 to 8900 and 10100 to 10300 VShape Drain work RD 8500 to 9800 Paver Block RD 8500 to 9000 and Widening and Strengthenin]
[REPAIR AND RESTORATION OF RAIN DAMAGES LINK ROAD CHINTPURNI AMLEHAR ROAD VIA DHALWARI ][2025_PWD_114752_1]
|
PWD |
206 |
15-Sep-2025 05:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[Repair and Restoration of Rain Damages link road from NMT road to Kua Devi Mandir km 000 to 4000 SH Construction of Retaining wall between RD 2340 to 2365 Under PDNA 2023]
[Repair and restoration of rain damages link road from NMT road to Kua devi minder ][2025_PWD_114772_1]
|
PWD |
207 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Renovation of Coles Cottage Type-IV and servant Qtr. at U.S Club Shimla SH Providing additional alternation to E.I therein]
[Electrical Division-I dated 03.09.2025][2025_PWD_114761_6]
|
PWD |
208 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Providing Services of technician for running and operation of Electrical services HP Vidhan Sabha during winter session Budget session and day to day maintenance for the year 2025-26 w.e.f 30.09.2025 to 29.09.2026]
[Electrical Division-I dated 03.09.2025][2025_PWD_114761_4]
|
PWD |
209 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Renovation of Kitchen, Bath rooms Toilets in set No. 303 at Jawahar lal Nehru Vidhayak Sadan MLA s Hostel at set No.2 Library Ground floor at Vidhan Sabha Shimla-4 SH Providing Additional Alternation to E.I therein]
[Electrical Division-I dated 03.09.2025][2025_PWD_114761_8]
|
PWD |
210 |
15-Sep-2025 05:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[Repair and Restoration of Rain Damages link road Bari mohalla Deoli to Connect Ghanari Nangal Jariala in GP Deoli Km 000 to 1800 SH CO wire crate wall and Filling in Km 10 to 1035 Under PDNA 2023]
[REPAIR AND RESTORATION OF RAIN DAMAGES LINK ROAD BARI MOHALLA DEOLI TO CONNECT GHANARI NANGAL JARI ][2025_PWD_114766_1]
|
PWD |
211 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[CO 1 No. type-III and 12 No. type-II Quarters for women Police Station at Nahan Distt. Sirmour H.P SH Providing E.I therein]
[Electrical Division-I dated 03.09.2025][2025_PWD_114761_2]
|
PWD |
212 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Providing Eelctrical wiring and electrical accessories in various Rest houses under ESD HPPWD Solan District Solan.]
[Electrical Division-I dated 03.09.2025][2025_PWD_114761_5]
|
PWD |
213 |
15-Sep-2025 05:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[CO 1 No. type-III and 12 No. type-II Quarters for Police Station Sadar at Nahan Distt. Sirmour H.P SH Providing E.I therein]
[Electrical Division-I dated 03.09.2025][2025_PWD_114761_1]
|
PWD |
214 |
15-Sep-2025 04:50 PM |
20-Sep-2025 04:50 PM |
20-Sep-2025 06:00 PM |
[providing Survey Supply design Erection testing Commissioning of 22 KV HT line to proposed 100KVA DTR along with CT/PT Metering equipment for providing SOP to FIS Chhaprohal Ghatta Near Samshan Ghat for 25HP/18.65KW load in E Section Gagal Under N]
[HPSEBL/OCM/DB-23/ NIT-16/2025-26][2025_HPSEB_114801_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Mandi |
215 |
15-Sep-2025 04:35 PM |
24-Sep-2025 04:00 PM |
25-Sep-2025 11:00 AM |
[Housing Colony at Basal, Distt. Solan H.P. SH- Construction of 2 Nos. Twin Towers Block No. 26 and 27 24 Nos. 3BHK flats with Parking and Attic Floor including Internal Water Supply, Sanitary Installation, Co 2 Nos. 13000 Liter Capacity]
[HIMUDA ND CB ETENDER 2024 2713-22 DT 15.09.2025][2025_HIMUD_114806_1]
|
Himachal Urban Development Authority||Supdt. Engineer (S),HIMUDA||Executive Engineer,Shimla Division-II,HIMUDA |
216 |
15-Sep-2025 04:00 PM |
20-Sep-2025 04:00 PM |
20-Sep-2025 05:00 PM |
[providing Survey Supply design Erection testing Commissioning of 11 KV HT line to proposed 100KVA DTR along with CtPT Metering unit for prov. SOP to FIS Malwana Tube Well NoII near Four lane for 60HP/44.46KW load in E Section Gagal Under Nerchowk ]
[HPSEBL/OCM/DB-23/ NIT.-15/2025-26][2025_HPSEB_114768_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Mandi |
217 |
15-Sep-2025 03:50 PM |
22-Sep-2025 03:00 PM |
22-Sep-2025 04:00 PM |
[Tender for Prov. New 11 kv HT line to prop. 11/0.4 kV, 63 kVA S/Stn. at vill. Reda Peda -2 in (E) section Bharwain under ESD HPSEBL Bharwain.]
[AED69/2025-26][2025_HPSEB_114282_2]
|
HPSEBL||CE(OP) CZ Hamirpur||SE (OP) Una||Sr. Xen Amb |
218 |
15-Sep-2025 03:20 PM |
21-Sep-2025 10:30 AM |
21-Sep-2025 11:30 AM |
[R/R damages on SAKB road in Km 37/00 to 70/00 ]
[8646-55 dated 09.09.2025][2025_PWD_114790_1]
|
PWD |
219 |
15-Sep-2025 03:15 PM |
20-Sep-2025 03:20 PM |
20-Sep-2025 03:25 PM |
[S/R to various residential sets under Shimla Division No.III. (SH Repair/renovation of set No. 1/27 Type-IV Royal Hotel Nabha Estate Repair of tiles and flooring, painting and distempering and wood work and sanitary work etc.]
[SD-III-10622-38dt.15-9-2025][2025_PWD_114785_1]
|
PWD |
220 |
15-Sep-2025 03:15 PM |
21-Sep-2025 10:30 AM |
21-Sep-2025 11:30 AM |
[R/R damages on Dharampur Kasauli road in km 0/00 to 10/835 ]
[8646-55 dated 09.09.2025][2025_PWD_114786_1]
|
PWD |
221 |
15-Sep-2025 03:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[R R Damages on Mandi Gagal Chail Janjehli road Km 0 000 to 82 000 SH Construction of Retaining wing wall in wire crate at Rds 75 022 to 75 034 and 75 036 to 75 048]
[4824-26 dated 11/09/2025][2025_PWD_114764_3]
|
PWD |
222 |
15-Sep-2025 03:00 PM |
21-Sep-2025 10:30 AM |
21-Sep-2025 11:30 AM |
[R/R damages on SAKB road in Km 37/00 to 70/00 ]
[8646-55 dated 09.09.2025][2025_PWD_114782_1]
|
PWD |
223 |
15-Sep-2025 03:00 PM |
21-Sep-2025 10:30 AM |
21-Sep-2025 11:30 AM |
[R/R damages on Dharampur Kiyard road in Km 0/00 to 6/00 ]
[8646-55 dated 09.09.2025][2025_PWD_114780_1]
|
PWD |
224 |
15-Sep-2025 03:00 PM |
21-Sep-2025 10:30 AM |
21-Sep-2025 11:30 AM |
[R/R damages to Shihardi Chamara to Bhere Ka Khech road in km 0/00 to 1/120]
[8646-55 dated 09.09.2025][2025_PWD_114778_1]
|
PWD |
225 |
15-Sep-2025 03:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[R R Damages on Janjehli Chhatri road in Km 0 000 to 11 200 SH Construction of Retaining wall in wire crate at Rds in Km 1 815 to 1 835]
[4824-26 dated 11/09/2025][2025_PWD_114764_2]
|
PWD |
226 |
15-Sep-2025 03:00 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[R R Damages on Janjehli Chhatri road in Km 0 000 to 11 200 SH Construction of Retaining wall in wire crate at Rds in Km 1 685 to 1 705]
[4824-26 dated 11/09/2025][2025_PWD_114764_1]
|
PWD |
227 |
15-Sep-2025 02:00 PM |
23-Sep-2025 04:00 PM |
24-Sep-2025 11:00 AM |
[Construction of ambulance road from Chokhariya to Dhar Karewari km. 0/00 to 1/925 ]
[SD-I-CTR-Tender-2025- 9997 dated 12-09-2025][2025_PWD_114745_6]
|
PWD |
228 |
15-Sep-2025 02:00 PM |
23-Sep-2025 04:00 PM |
24-Sep-2025 11:00 AM |
[A/R and M/O to Type-I to Type-VI Qtrs at mehli Shimla ]
[SD-I-CTR-Tender-2025- 9997 dated 12-09-2025][2025_PWD_114745_2]
|
PWD |
229 |
15-Sep-2025 02:00 PM |
23-Sep-2025 04:00 PM |
24-Sep-2025 11:00 AM |
[Construction of Link road from Rihari Jubber to Kahlot km. 0/00 to 2/00 ]
[SD-I-CTR-Tender-2025- 9997 dated 12-09-2025][2025_PWD_114745_1]
|
PWD |
230 |
15-Sep-2025 02:00 PM |
23-Sep-2025 04:00 PM |
24-Sep-2025 11:00 AM |
[Restoration of Rain Damages on Dublu to Lakhoti road km. 0/00 to 5/760 ]
[SD-I-CTR-Tender-2025- 9997 dated 12-09-2025][2025_PWD_114745_8]
|
PWD |
231 |
15-Sep-2025 02:00 PM |
23-Sep-2025 04:00 PM |
24-Sep-2025 11:00 AM |
[A/R and M/O various type-I to type-VI GAD Residential qtrs. At kasumpti Shimla ]
[SD-I-CTR-Tender-2025- 9997 dated 12-09-2025][2025_PWD_114745_7]
|
PWD |
232 |
15-Sep-2025 02:00 PM |
23-Sep-2025 04:00 PM |
24-Sep-2025 11:00 AM |
[A/R and M/O various Type-I to Type-VI of GAD at kasumpti Shimla-9 ]
[SD-I-CTR-Tender-2025- 9997 dated 12-09-2025][2025_PWD_114745_3]
|
PWD |
233 |
15-Sep-2025 02:00 PM |
23-Sep-2025 04:00 PM |
24-Sep-2025 11:00 AM |
[A/R and M/O various Type-I to Type-VI Qtrs of GAD at kasumpti Shimla-9 ]
[SD-I-CTR-Tender-2025- 9997 dated 12-09-2025][2025_PWD_114745_4]
|
PWD |
234 |
15-Sep-2025 02:00 PM |
23-Sep-2025 04:00 PM |
24-Sep-2025 11:00 AM |
[Restoration of Rain damages on sadhora to Mohanpur road km. 0/00 to 6/525 ]
[SD-I-CTR-Tender-2025- 9997 dated 12-09-2025][2025_PWD_114745_5]
|
PWD |
235 |
15-Sep-2025 02:00 PM |
22-Sep-2025 11:00 AM |
23-Sep-2025 12:00 PM |
[HPSEBL/GPHD/DB-9/2025-26-75]
[HPSEBL/GPHD/DB-9/2025-26-75][2025_HPSEB_114713_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Bhaba Nagar||RE Ganvi PH |
236 |
15-Sep-2025 01:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:30 AM |
[Restoration of rain damage on Khara Danda road Kotwali Bazar Dharamshala to Mecleodganj Via Delek Hospital Karmu Mod km 0/000 to 3/535 in Tehsil Dharamshala Distt. Kangra HP ]
[5194-5224][2025_PWD_114748_2]
|
PWD |
237 |
15-Sep-2025 01:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:30 AM |
[Restoration of rain damage on Rait Chari Chambi Dharamshala road km 0/000 to 14/715 Portion 12/800 to 14/715 in Tehsil Dharamshala Distt. Kangra HP]
[5194-5224][2025_PWD_114748_4]
|
PWD |
238 |
15-Sep-2025 01:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:30 AM |
[Restoration of rain Damage on Mecleoganj to Dharamkot road km 0/00 to 1/800 in Tehsil Dharamshala Distt. Kangra HP Sub Head- Construction of Wire Crate, Retaining wall ,with Pusta at RD 0/110 to 0/140]
[5194-5224][2025_PWD_114748_3]
|
PWD |
239 |
15-Sep-2025 01:00 PM |
21-Sep-2025 05:00 PM |
22-Sep-2025 11:30 AM |
[Restoration of rain damage on rait Chari Chambi Dharamshala road 0/000 to 14/715 Portion 12/800 to 14/715 in Tehsil Dharamshala Distt. Kangra HP ]
[5194-5224][2025_PWD_114748_1]
|
PWD |
240 |
15-Sep-2025 12:30 PM |
22-Sep-2025 09:00 AM |
22-Sep-2025 11:00 AM |
[R.R damages on Jhakri Khadkag road Km 0.000 to 5.445 and Guri Basara to Chandali road Km. 0.000 to 7.150 ]
[PW/RMP/TA/2025-4788 dated 09.09.2025][2025_PWD_114382_1]
|
PWD |
241 |
15-Sep-2025 11:20 AM |
22-Oct-2025 09:00 AM |
22-Oct-2025 11:00 AM |
[Restoration of rain damages on link road Takarla to Basuni via Abadi Kamaldeen km 000 to 2400 SH Repair of Pot holes Const of both side berms and Providing and Erecting of Wmetal beam crash barrier in km 2200 to 2400 Under PDNA2023]
[RRD Takarla to Basuni via Abadi Kamaldeen Job No.1][2025_PWD_114751_1]
|
PWD |
242 |
15-Sep-2025 11:00 AM |
22-Sep-2025 10:30 AM |
22-Sep-2025 11:30 AM |
[Restoration of road damage caused due to laying of OFC on NH 503 A at Km 00 to 700 SH Protection work to Bhadsali Bridge in Km 10214 for filling of cavity under bridge foundation from abutment 1 A1 to Pier 2 P2 downstream side by providing plain r]
[PW-NHD-GA Tender/2025-26- 4433 Dated 08.09.2025][2025_PWD_114708_2]
|
PWD |
243 |
15-Sep-2025 11:00 AM |
22-Sep-2025 10:30 AM |
22-Sep-2025 11:30 AM |
[Restoration of Road damages caused due to laying of OFC on NH 20A New NH 503 Km 3900 to 9100 SH Construction of U Shape Drain right side at RD 59730 to 59790 and 59870 to 59900 ]
[PW-NHD-GA Tender/2025-26- 4433 Dated 08.09.2025][2025_PWD_114708_1]
|
PWD |
244 |
15-Sep-2025 11:00 AM |
22-Sep-2025 03:00 PM |
23-Sep-2025 11:00 AM |
[HPSEBL/SE/PS-446(T)-03/2025-26 ]
[HPSEBL/SE/PS-446(T)-03/2025-26][2025_HPSEB_114716_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Palampur |
245 |
15-Sep-2025 11:00 AM |
22-Sep-2025 03:00 PM |
23-Sep-2025 11:00 AM |
[HPSEBL/SE/PS-446(T)-01/2025-26 ]
[HPSEBL/SE/PS-446(T)-01/2025-26][2025_HPSEB_114701_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Palampur |
246 |
15-Sep-2025 11:00 AM |
22-Sep-2025 03:00 PM |
23-Sep-2025 11:00 AM |
[HPSEBL/SE/PS-446(T)-02/2025-26 ]
[HPSEBL/SE/PS-446(T)-02/2025-26][2025_HPSEB_114710_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Palampur |
247 |
15-Sep-2025 10:00 AM |
22-Sep-2025 10:30 AM |
22-Sep-2025 11:00 AM |
[Restoration of Rain Damages on Deoth Dabber Road km 0/00 to 10/960]
[Restoration of Rain Damages on Deoth Dabber Road km 0/00 to 10/960][2025_PWD_114674_1]
|
PWD |
248 |
15-Sep-2025 10:00 AM |
22-Sep-2025 10:30 AM |
22-Sep-2025 11:00 AM |
[Restoration of Rain Damages on Patwarkhana Plog Dungloo road km 0/00 to 7/000]
[Restoration of Rain Damages on Patwarkhana Plog Dungloo road km 0/00 to 7/000][2025_PWD_114684_1]
|
PWD |
249 |
15-Sep-2025 10:00 AM |
22-Sep-2025 10:30 AM |
22-Sep-2025 11:00 AM |
[ Restoration of Rain Damages on Namhol Ashamajhari road km 0/00 to 10/555]
[ Restoration of Rain Damages on Namhol Ashamajhari road km 0/00 to 10/555][2025_PWD_114679_1]
|
PWD |
250 |
15-Sep-2025 10:00 AM |
22-Sep-2025 10:30 AM |
22-Sep-2025 11:00 AM |
[Restoration of Rain Damages on Ghayal Dabar road km 0/00 to 11/000]
[Restoration of Rain Damages on Ghayal Dabar road km 0/00 to 11/000][2025_PWD_114672_1]
|
PWD |
251 |
15-Sep-2025 10:00 AM |
23-Sep-2025 10:00 AM |
24-Sep-2025 02:00 PM |
[A/R and M/o of road from Petrol Pump under Ward No 7 to Vardhman chowk Municipal Corporation Baddi]
[MCORP/BADDI/092025/1419-1425][2025_UDDHP_114744_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Baddi - UDDHP |
252 |
15-Sep-2025 10:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Flooring in Mini Auditorium and Committee room in COCS, CSKHPKV, Palampur. (SH Providing and fixing vitrified tile flooring, wall tile etc.)]
[EE CSKHPKV NIT No. 3273-96 dt 04/09/2025][2025_HPKV_114447_1]
|
HP Krishi Vishva Vidyalaya |
253 |
15-Sep-2025 10:00 AM |
23-Sep-2025 10:00 AM |
24-Sep-2025 02:00 PM |
[A/R and M/o Road from Water Tank under Ward No 2 to Harman Filling Petrol Pump under Ward No 8, Municipal Corporation Baddi]
[MCORP/BADDI/092025/1419-1425][2025_UDDHP_114744_3]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Baddi - UDDHP |
254 |
15-Sep-2025 10:00 AM |
27-Sep-2025 05:00 PM |
30-Sep-2025 11:00 AM |
[Construction of Boundary wall to the Sarai ward No 03 Nagrota Bagwan]
[1277-85 Dated 25/08/2025][2025_UDDHP_113302_3]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Nagrota - UDDHP |
255 |
15-Sep-2025 10:00 AM |
27-Sep-2025 05:00 PM |
30-Sep-2025 11:00 AM |
[Construction of Children park near Railway Station in ward No 04 M.C. Nagrota Bagwan]
[1277-85 Dated 25/08/2025][2025_UDDHP_113302_2]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Nagrota - UDDHP |
256 |
15-Sep-2025 10:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Renovation of Electrical Installation in Administrative Block and Guest House at MAREC, Salooni under CSKHPKV, Palampur.]
[EE CSKHPKV NIT No. 3273-96 dt 04/09/2025][2025_HPKV_114454_1]
|
HP Krishi Vishva Vidyalaya |
257 |
15-Sep-2025 10:00 AM |
22-Sep-2025 10:30 AM |
22-Sep-2025 11:00 AM |
[ Restoration of Rain Damages on Laraghat to Ghamrada km 0/00 to 4/690]
[ Restoration of Rain Damages on Laraghat to Ghamrada km 0/00 to 4/690][2025_PWD_114666_1]
|
PWD |
258 |
15-Sep-2025 10:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Providing and fixing wooden partition in Reading Hall-2 in University Library at CSKHPKV, Palampur. ]
[EE CSKHPKV NIT No. 3273-96 dt 04/09/2025][2025_HPKV_114451_1]
|
HP Krishi Vishva Vidyalaya |
259 |
15-Sep-2025 10:00 AM |
23-Sep-2025 10:00 AM |
24-Sep-2025 02:00 PM |
[A/R and M/o Road from Aggarwal Chowk to Radha Swami Satsang , Municipal Corporation Baddi.]
[MCORP/BADDI/092025/1419-1425][2025_UDDHP_114744_2]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Baddi - UDDHP |
260 |
15-Sep-2025 10:00 AM |
27-Sep-2025 05:00 PM |
30-Sep-2025 11:00 AM |
[Construction of cover the drain with half round iron angles at ward No 07 Nagrota Bagwan ]
[1277-85 Dated 25/08/2025][2025_UDDHP_113302_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Nagrota - UDDHP |
261 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on link road Haritalyanger to Johadi km 0/00 to 0/500 SH Repair of Pot Holes at Rd 0/00 to 0/450 and construction of road side V-shape drain at damage reahes Rd 0/00 to 0/450 Under PDNA Year 2023]
[7376-82 Dated 11-9-2025][2025_PWD_114749_7]
|
PWD |
262 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damage on Kapahra to Karloti via Seenbehal km 0/0 to 2/190 SH P/L Cement concrete pavement and G-I at RD 1/540 to 1/640, C/o R/wall at RD 0/075 to 0/105, 1/540 to 1/570 and 0/390 to 0/411 Under PDNA Year 2023]
[7376-82 Dated 11-9-2025][2025_PWD_114749_15]
|
PWD |
263 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on G.T.B. road km 0/00 to 4/00 SH C/o R/wall at Rd 3/465 to 3/485 Under PDNA Year 2023]
[7376-82 Dated 11-9-2025][2025_PWD_114749_16]
|
PWD |
264 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on link road Dangar to Dangar Chowk km 0/00 to 0/800 SH C/o R/wall at Rd 0/405 to 0/410 , 0/435 to 0/440 and Repair of Pot Holes Between Rd 0/00 to 0/450 Under PDNA Year 2023]
[7376-82 Dated 11-9-2025][2025_PWD_114749_6]
|
PWD |
265 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on Khanger Bari Kotla Thalotu road km 0/00 to 5/00 SH C/o B/wall at Rd 0/300 to 0/375 and Removal of slips at Rd 0/290 to 0/375 Under PDNA Year 2023]
[7376-82 Dated 11-9-2025][2025_PWD_114749_5]
|
PWD |
266 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on link road Dangar to Badhaghat via Chokhna road km 0/00 to 13/200 SH C/O R/wall at RD 12/00 to 12/015, 12/565 to 12/570 and Construction of C.C. pavement at damaged reaches Rd 12/075 to 12/136.50 Under PDNA Year 2023]
[7376-82 Dated 11-9-2025][2025_PWD_114749_4]
|
PWD |
267 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on link road Gugga Mandir Ghandalwin to village Bhadarwan road km 0/00 to 2/00 SH Construction of R/wall in between 0/00 to 2/00 at various Rds Under PDNA Year 2023]
[7376-82 Dated 11-9-2025][2025_PWD_114749_3]
|
PWD |
268 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on link road Nihari to Dadhol Kallan road km 0/00 to 3/00 SH C/o R/wall at Rd 0/382 to 0/390.5 .Under PDNA Year 2023]
[7376-82 Dated 11-9-2025][2025_PWD_114749_2]
|
PWD |
269 |
15-Sep-2025 09:00 AM |
22-Sep-2025 09:00 AM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on Amarpur Hadsar Dahad Jaman Ghumarwin road km 0/00 to 7/500 SH C/o wire crate wall at Rd 4/240 to 4/260 Under PDNA Year 2023]
[7376-82 Dated 11-9-2025][2025_PWD_114749_1]
|
PWD |
270 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on link road to village Muhana km 0/00 to 0/500 SH C/o Edge wall at RD 0/392 to 0/412 and 0/180 to 0/220, C/o R/wall at Rd 0/435 to 0/450 and 0/480 to 0/500 and P/L Cement concrete pavement at Rd 0/392 to 0/412 Under PDNA]
[7376-82 Dated 11-9-2025][2025_PWD_114749_17]
|
PWD |
271 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on link road Dangar to Dakhiut Nichla km 0/00 to 2/00 SH C/O B/wall at Rd 1/900 to 1/915 ,R/wall at RD 1/930 to 1/950 and Construction of U-shape drain at Rd 0/00 to 0/100,0/150 to 0/230, 0/690 to 0/750 (Both side) and 0/7]
[7376-82 Dated 11-9-2025][2025_PWD_114749_18]
|
PWD |
272 |
15-Sep-2025 09:00 AM |
22-Sep-2025 09:00 AM |
23-Sep-2025 09:00 AM |
[Restoration of rain damages of link road Doon Sohni Devi road km 0/00 to 1/00 SH C/o U-shape drain at d 0/830 to 0/940 and R/wall at Rd 0/515 to 0/523 Under PDNA Year 2023]
[7376-82 Dated 11-9-2025][2025_PWD_114749_13]
|
PWD |
273 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on link road Badhaghat to Kassaru road km 0/00 to 1/600 SH C/o B/wall at Rd 0/320 to 0/335, C/o road side U-shape drain at Rd 0/340 to 0/425 and P/L cement concrete pavement at Rd 0/320 to 0/450 Under PDNA Year 2023]
[7376-82 Dated 11-9-2025][2025_PWD_114749_12]
|
PWD |
274 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on link road Daloh to Mundkhar road km 0/00 to 1/500 SH C/o B/wall at Rd 0/400 to 0/430, C/o road side U-shape drain at Rd 0/500 to 0/700 Under PDNA Year 2023]
[7376-82 Dated 11-9-2025][2025_PWD_114749_11]
|
PWD |
275 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on Talai Randoh road Km 0/00 to 2/00 SH P/L wire crate wall RHS at Rd 0/930 to 0/945 LHS at RD 0/930 to 0/945 Under PDNA Year 2023]
[7376-82 Dated 11-9-2025][2025_PWD_114749_10]
|
PWD |
276 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on link road Sidh Chano mandir Dadhol Kallan to Bhel km 0/00 to 1/200 SH Proposed Solid cause way at Rd 0/030 and Construction of road right side V-shape drain at Rd 0/720 to 1/110 and C/o R/wall at Rd 0/390 to 0/405, 0/8]
[7376-82 Dated 11-9-2025][2025_PWD_114749_9]
|
PWD |
277 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on link road Badhaghat to Kassaru road km 0/00 to 1/600 SH C/O B/wall at Rd 0/318 to 0/338 and Construction of road side U-shape drain at Rd 0/340 to 0/425 and P/L Cement concrete pavement damaged reaches Rd 0/320 to 0/450]
[7376-82 Dated 11-9-2025][2025_PWD_114749_8]
|
PWD |
278 |
15-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 10:00 AM |
[Restoration of rain damages on link road to village Seo km 0/0 to 0/700. SH Construction of Breast wall at RD 0/015 to 0/040, P/L cement concrete pavement at RD 0/280 to 0/330 and 0/470 to 0/500, 0/550 to 0/635 and repair of pot holes at RD 0/0 to 0]
[7376-82 Dated 11-9-2025][2025_PWD_114749_14]
|
PWD |
279 |
15-Sep-2025 09:00 AM |
29-Sep-2025 05:00 PM |
30-Sep-2025 11:30 AM |
[Services for housekeeping, cleaning, gardening, waste disposal, pest control, pantry and office support, and other ancillary tasks for 220 kV GIS Switching Station Hatkoti, incl. housekeeping and dining services at Rest Camp, for 1 year.]
[HPPTCL/PIUG/NIT/2025-26/3][2025_HPPTC_114359_1]
|
HP Power Transmission Corporation limited||Projects||DGM (Shimla)||PIU Gumma |
280 |
14-Sep-2025 09:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[AMP on Janoul to Jaral road km 0/0 to 2/00 (PMGSY Road) ]
[PW-SNR-Tender-5677-88 dt 09.09.25][2025_PWD_114747_3]
|
PWD |
281 |
14-Sep-2025 09:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[AMP on Sundernagar to Maloh road km 0/0 to 5/565 (SH- Providing and laying 25 mm. thick Mix seal surfacing in km 3/0 to 5/570) under AMP fog 25 mm. thick Mix seal surfacing in km 3/0 to 5/570) under AMP for the year 2025-26 (VILLAGE ROADS)]
[PW-SNR-Tender-5677-88 dt 09.09.25][2025_PWD_114747_1]
|
PWD |
282 |
14-Sep-2025 09:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[AMP on Bangalu Luhnu road km 0/0 to 7/600 and AMP on Alsoo to Jambla road km 0/0 to 8/900 (PMGSY Roads)]
[PW-SNR-Tender-5677-88 dt 09.09.25][2025_PWD_114747_2]
|
PWD |
283 |
13-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Providing GWSS to Village Tikkari Surrounding area in GP Tikkari Teshil Nerwa Distt. Shimla HP ]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114736_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
284 |
13-Sep-2025 05:00 PM |
19-Sep-2025 05:00 PM |
20-Sep-2025 02:30 PM |
[Channelization of Nalla and Filling to Construct Park and other community facility in Ward No 07 old HBC M.C. Hamirpur Phase 2 Sub Head Construction of R.C.C. Box culvert]
[CW/Vol-12/25-26-2603][2025_UDDHP_114738_2]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Una - UDDHP |
285 |
13-Sep-2025 05:00 PM |
19-Sep-2025 05:00 PM |
20-Sep-2025 02:30 PM |
[Channelization of Nalla and Filling to Construct Park and other community facility in Ward No 07 old HBC M.C. Hamirpur Phase 1 Sub Head Construction of R.C.C. Box culvert]
[CW/Vol-12/25-26-2603][2025_UDDHP_114738_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Una - UDDHP |
286 |
13-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Rem and co various WSS Storage Tank under Karsog Constituency in Tehsil Karsog consultance service for survey and preparation of detailed project report for Sub Division Churag]
[JSV_KSG_DPR_2025_1][2025_HPIPH_114691_1]
|
HP Irrigation and Public Health||S Nagar Circle,Irrigation and Public Health,HP||Karsog,Irrigation and Public Health,HP |
287 |
13-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Rem and co various WSS Storage Tank under Karsog Constituency in Tehsil Karsog consultance service for survey and preparation of detailed project report for Sub Division Kotlu]
[JAV_KSG_DPR_2025_3][2025_HPIPH_114704_1]
|
HP Irrigation and Public Health||S Nagar Circle,Irrigation and Public Health,HP||Karsog,Irrigation and Public Health,HP |
288 |
13-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Rem and co various WSS Storage Tank under Karsog Constituency in Tehsil Karsog consultance service for survey and preparation of detailed project report for Sub Division Karsog]
[JSV_KSG_DPR_2025_2][2025_HPIPH_114697_1]
|
HP Irrigation and Public Health||S Nagar Circle,Irrigation and Public Health,HP||Karsog,Irrigation and Public Health,HP |
289 |
13-Sep-2025 01:00 PM |
19-Sep-2025 09:00 AM |
19-Sep-2025 11:00 AM |
[Recovery and Restoration on Kashdhar Darkali road Km. 0.000 to 22.700 ]
[PW/RMP/TA/2025-5051 dated 11.09.2025][2025_PWD_114733_1]
|
PWD |
290 |
13-Sep-2025 12:00 PM |
19-Sep-2025 09:00 AM |
19-Sep-2025 11:00 AM |
[Recovery and Restoration on Rohru Sungri Bhali Taklech Nogli road Km. 27.000 to 80.000 ]
[PW/RMP/TA/2025-5051 dated 11.09.2025][2025_PWD_114728_1]
|
PWD |
291 |
13-Sep-2025 11:00 AM |
19-Sep-2025 09:00 AM |
19-Sep-2025 11:00 AM |
[Recovery and Restoration on Mashnoo Taklech road Km. 12.000 to 48.000 ]
[PW/RMP/TA/2025-5051 dated 11.09.2025][2025_PWD_114724_1]
|
PWD |
292 |
13-Sep-2025 11:00 AM |
27-Sep-2025 05:00 PM |
29-Sep-2025 11:00 AM |
[E tender for civil, infra, repair and minor electrical works in around 300 libraries on FOR basis in Himachal Pradesh]
[HPGIC/ CIVIL/ INFRA/ TENDER/ 2025-770][2025_HPGIC_114726_2]
|
HP General Industries Corporation Ltd |
293 |
13-Sep-2025 11:00 AM |
27-Sep-2025 05:00 PM |
29-Sep-2025 11:00 AM |
[E tender for purchase of furniture items on FOR basis in around 500 schools in HP]
[HPGIC/ FURNITURE/ TENDER/ 2025-769][2025_HPGIC_114717_2]
|
HP General Industries Corporation Ltd |
294 |
13-Sep-2025 10:00 AM |
19-Sep-2025 10:00 AM |
19-Sep-2025 11:30 AM |
[Restoration of rain damages on Uhl Valley road Km 0/00 to 10/00. (PDNA-2023)]
[PW-MDI(P)Tender-NIT-7999-8034 dated 11.09.2025][2025_PWD_114739_1]
|
PWD |
295 |
13-Sep-2025 10:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[Repair of conference hall at CMO office Chamba (SH Dismantling of floor, painting, putty , plastering and sanitary installation etc.)]
[No. PWC-WA-II-13447-546 Dt. 09-09-2025][2025_PWD_114735_5]
|
PWD |
296 |
13-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Const./Est. of 50-Bedded Critical Care Block and DIPHL at Civil Hospital Dehra, Tehsil Dehra, Distt. Kangra, HP (SH- Providing services on temporary basis of T-Mate in the office of the AE, ESD HPPWD Dehra against contingency therein)]
[Elect. Division HPPWD Palampur][2025_PWD_114743_3]
|
PWD |
297 |
13-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[C/O Govt. Senior Secondary School at Silh in Tehsil Jawalamukhi, Distt. Kangra (HP) (C/O Three rooms in Ground Floor with Verandah) (SH- Providing E.I. therein)]
[Elect. Division HPPWD Palampur][2025_PWD_114743_4]
|
PWD |
298 |
13-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[C/O Ayurvedic Health Centre at Pihri in Tehsil Khundian Distt. Kangra HP (SH- Providing E.I. therein)]
[Elect. Division HPPWD Palampur][2025_PWD_114743_5]
|
PWD |
299 |
13-Sep-2025 10:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[Repair of leprosy Building at Sarol (SH Demolishing of stone masonry wall and construction of Breast wall, Dismantling of floor, painting work wood work , shutter work, tile work , steel work, bison board ceiling, putty etc.) ]
[No. PWC-WA-II-13447-546 Dt. 09-09-2025][2025_PWD_114735_4]
|
PWD |
300 |
13-Sep-2025 10:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[Retrofitting of GSSS Randoh Block-A (SH Provision of wire mesh in lintel, sill belt in horizontal and vertical jambs at corner along with doors, window, repair of floor )]
[No. PWC-WA-II-13447-546 Dt. 09-09-2025][2025_PWD_114735_1]
|
PWD |
301 |
13-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[C/O Senior Secondary School at Dadh in Tehsil Palampur, Distt. Kangra (HP) (SH- Providing E.I. therein)]
[Elect. Division HPPWD Palampur][2025_PWD_114743_2]
|
PWD |
302 |
13-Sep-2025 10:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[Construction of Multipurpose Hall Administrative Block, Atal tinkering Lab, Vocational Lab ICI in Govt Senior Secondary School Sarol District Chamba (SH Construction of Building portion WS and SI, septic Tank Rain Water Harvesting, Boundary wall ]
[No.PWC-WA-II/25-26-13447-546 dated 9-9-25][2025_PWD_114727_1]
|
PWD |
303 |
13-Sep-2025 10:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[Repair of Hospital Sarai Building at Chamba (SH Dismantling of floor, painting, plastering, shutter work , tile work and sanitary installation etc.)]
[No. PWC-WA-II-13447-546 Dt. 09-09-2025][2025_PWD_114735_2]
|
PWD |
304 |
13-Sep-2025 10:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[Restoration of Rain Damages on Maredi Sillaghrat road Km. 0/0 to 14/0 (SH Construction of Breast wall at RD 6/200 to 6/209,8/880 to 8/905 and 9/050 to 9/062)]
[No. PWC-WA-II-13447-546 Dt. 09-09-2025][2025_PWD_114735_3]
|
PWD |
305 |
13-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[C/O Ayurvedic Health Centre building at Dagla in Tehsil Indora, Distt. Kangra (HP) (SH- Providing E.I. therein)]
[Elect. Division HPPWD Palampur][2025_PWD_114743_1]
|
PWD |
306 |
13-Sep-2025 09:00 AM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on Jallo di Bar to Jawal km 000 to 2500 SHConst of Retaining wall at RD 0045 to 0060 and 2010 to 2025) Under PDNA2023]
[RRD Jallo di Bar to Jawal Job No. 8 PDNA][2025_PWD_114737_1]
|
PWD |
307 |
13-Sep-2025 09:00 AM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on link road Kailu di Bar to Bharabar via Kailu di Bar km 00 to 500 SH Const of Retaining wall between km 0800 to 0940) Under PDNA2023]
[RRD Kailu Di bar to Bharabar job No10 PDNABharwain Chintpurni Mandir BC Job No3][2025_PWD_114741_1]
|
PWD |
308 |
13-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Providing Flood protection work on Jibhi Khad at Hidab Ghiyaghi Jibhi Dawala and damothi and on Tirthan Khad at Bathad Pariyadi Gushaini Sairopa deori and Kandhidhar and kaluropa Khundan to Manglore in Tehsil Banjar Distt. ]
[NIT No.7097-7196 dated 12/09/2025][2025_HPIPH_114742_1]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
309 |
13-Sep-2025 09:00 AM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on link road from Kalu Di Bar to Dharamshala Mahantan Jhikli Km 000 to 1585 SH CC Pavement Retaining wall Breast wall and Vshape drain between Km 1125 to 1350 Under PDNA2023]
[RRD Kalu Di Bar to Dharamshala mahantan Job-9 PDNA][2025_PWD_114740_1]
|
PWD |
310 |
12-Sep-2025 06:20 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Restoration of rain damages on HPPWD 3rd circle office building at solan ]
[No. 7995-8002 dated 06.09.2025][2025_PWD_114729_11]
|
PWD |
311 |
12-Sep-2025 06:15 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Repair and maintenance of 15 bedded hospital at Kandaghat Distt. Solan (Deposit work)(]
[No. 7995-8002 dated 06.09.2025][2025_PWD_114729_9]
|
PWD |
312 |
12-Sep-2025 06:15 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Repair and maintenance of 15 bedded hospital at Kandaghat Distt. Solan (Deposit work)(]
[No. 7995-8002 dated 06.09.2025][2025_PWD_114729_10]
|
PWD |
313 |
12-Sep-2025 06:15 PM |
13-Oct-2025 03:00 PM |
13-Oct-2025 03:00 PM |
[ICT 01 Central Computerized System for Monitoring at Head Quarter Himachal Pradesh Rural Drinking Water Improvement and Livelihood Project]
[3821][2025_HPIPH_114718_1]
|
HP Irrigation and Public Health||JSV (Project) Mandi||Project Director (PMU) HPRWSP JSV Mandi |
314 |
12-Sep-2025 06:15 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Repair and maintenance of type-IV set no. 1 officer colony Kotla nallah Solan ]
[No. 7995-8002 dated 06.09.2025][2025_PWD_114729_8]
|
PWD |
315 |
12-Sep-2025 06:00 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Construction of Rajsav Sadan building at Solan Deposit work ]
[No. 7995-8002 dated 06.09.2025][2025_PWD_114729_2]
|
PWD |
316 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Retrofitting of 28 Nos. ongoing completed GWSS LWSS schemes under NRDWP in Chopal Constituency to provide functional households tap connection under JJM]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114619_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
317 |
12-Sep-2025 06:00 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Annual repair and maintenance of type-II quarter set no. 7,8,9 and 10 near ITI colony at Solan ]
[No. 7995-8002 dated 06.09.2025][2025_PWD_114729_7]
|
PWD |
318 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[R R of Divisional Building at Jal Shakti Division Nerwa Distt, Shima]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114734_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
319 |
12-Sep-2025 06:00 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Restoration of rain damages on Chaila Neripul Yashwantnagar Oachghat Kumarhatti road km 62/0 to 75/575 ]
[No. 7995-8002 dated 06.09.2025][2025_PWD_114729_6]
|
PWD |
320 |
12-Sep-2025 06:00 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Repair and maintenance of Govt. women polytechnic college at Kandaghat ]
[No. 7995-8002 dated 06.09.2025][2025_PWD_114729_5]
|
PWD |
321 |
12-Sep-2025 06:00 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Repair and maintenance of Govt. Sanskrit college building at Solan (Deposit work) ]
[No. 7995-8002 dated 06.09.2025][2025_PWD_114729_4]
|
PWD |
322 |
12-Sep-2025 06:00 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Construction of home guard building at Solan (Deposit work]
[No. 7995-8002 dated 06.09.2025][2025_PWD_114729_3]
|
PWD |
323 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[RR of Staff Quarter under SD Chopal Distt, Shimla H.P ]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114730_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
324 |
12-Sep-2025 06:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on link road Dadasiba to Daulatpur road Km 000 to 9000 SH PL 80mm thick interlocking paver block Vshape drain and Breast wallin Km 3200 to 3600 Under PDNA2023]
[RRD Dadasiba to daulatpur road No.6 PDNA][2025_PWD_114720_1]
|
PWD |
325 |
12-Sep-2025 06:00 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Repair and maintenance of CMO Residence at officer colony Kotla Nallah Solan Deposit work ]
[No. 7995-8002 dated 06.09.2025][2025_PWD_114729_1]
|
PWD |
326 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Renovation of GWSS to Village UP Mohal Rohana in GP Bagan Teshil Nerwa Distt. Shimla HP ]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114725_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
327 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[R R of GWSS Raw Dharwali in GP khgna tehsil chopal distt Shimla hp ]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114721_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
328 |
12-Sep-2025 06:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on Dada Siba Daulatpur road km 000 to 9000SHConst of Protection work in wire crates at RD 5250 to 5278 and Retaining wall at RD 5300 to 5330 and 7000 to 7300 Under PDNA2023]
[RRD Dadasiba daulatpur Road Job No7 PDNA][2025_PWD_114732_1]
|
PWD |
329 |
12-Sep-2025 06:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Const of Retaining wall at RD 2200 to 2225 and 2230 to 2254 Breast wall at RD 2210 to 2240 RHS and CC Berms Under PDNA2023]
[RRD RRD on Bharwain Chintpurni Talwara road Job No. 4][2025_PWD_114677_1]
|
PWD |
330 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[R R of Various WSS under JSV Division Nerwa in Tehsil Nerwa District Shimla ]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114659_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
331 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[R R of GWSS Dimmo in GP Sarian Tehsil Chopal Distt. Shimla ]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114652_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
332 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[R M of GWSS Thundal II village HB Bhuni in GP Thundal Tehsil Chopal distt. Shimla ]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114636_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
333 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Providing GWSS to Village Bohar in GP Bohar Teshil Nerwa Distt. Shimla ]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114647_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
334 |
12-Sep-2025 06:00 PM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:30 AM |
[R/R damages on link road from Labrang Bus stand to Labrang Gompa Km. 0/00 to 1/600 (SH- C/O R/wall in R.R. masonry at RD. 1/485 to 1/500]
[PW/KNR-E-Tender/25-4005-14 dated 06-09-2025][2025_PWD_114681_1]
|
PWD |
335 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Provding GWSS Pabodhar in GP Mandhana Tehsil Nerwa Distt. Shimla ]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114715_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
336 |
12-Sep-2025 06:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[Recharging of Dry and Defunct Hand pumps through Rain Water Harvesting Structure under JSV Sub Division Raja Ka Talab under Division Fatehpur Distt. Kangra H.P. (SH- Recharging Structure of Defunct Hand Pumps 8 Nos.)]
[NIT NO. 4819-58 dated 11-09-2025][2025_HPIPH_114709_1]
|
HP Irrigation and Public Health||Nurpur Circle,Irrigation and Public Health,HP||Fatehpur-Irrigation and Public Health-HP |
337 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Augmentation of GWSS to village Kiran and surrounding area in GP Kiran Tehsil Nerwa Distt. Shimla H.P]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114689_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
338 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[R R of LWSS Kirri Shwalla in GP Kirri Tehsil Nerwa Distt. Shimla ]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114707_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
339 |
12-Sep-2025 06:00 PM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:30 AM |
[Special repair to Health Sub Center Building at Akpa in District Kinnaur (HP) (SH- Painting, distempering, tile flooring and plinth protection thereof]
[PW/KNR-E-Tender/25-4005-14 dated 06-09-2025][2025_PWD_114681_2]
|
PWD |
340 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Renovation of GWSS Lachog Khilar in GP Pouria Tehsil Chopal District Shimla HP ]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114700_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
341 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[R R of LWSS Gagna Badlog in GP Nanhar Tehsil chopal Distt. Shimla HP ]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114669_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
342 |
12-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Renovation of GWSS Kandal in GP Dhanat Mohal Teshil Nerwa Distt Shimla HP]
[JSV-ND-CB-Ten/2025/4297-4397][2025_HPIPH_114676_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
343 |
12-Sep-2025 05:40 PM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recovery and Restoration on Labana Sadana road Km. 0.000 to 8.000 ]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114719_1]
|
PWD |
344 |
12-Sep-2025 05:00 PM |
25-Sep-2025 05:00 PM |
26-Sep-2025 11:30 AM |
[R-31/Sec.Str. /25-26]
[R-31/Sec.Str. /25-26][2025_CPD1_114561_1]
|
Chief Project Director IDP Solan||DPO Sirmaur |
345 |
12-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on Bharwain Chintpurni Talwara road km 000 to 15310 MDR42 ]
[RRD Bharwain Chintpurni Job No. 5 PDNA][2025_PWD_114711_1]
|
PWD |
346 |
12-Sep-2025 05:00 PM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Construction Nursing College at Radha Krishanan Medical College Hamirpur at Jol Sappar, District Hamirpur ]
[Construction Nursing College at Radha Krishanan Medical College Hamirpur at Jol Sappar, District Ham][2025_PWD_114714_1]
|
PWD |
347 |
12-Sep-2025 05:00 PM |
25-Sep-2025 01:00 PM |
26-Sep-2025 11:00 AM |
[Repair and restoration of 33KV Bhuntar Kullu underground feeder damaged by Sh. Ashwani Kumar S/o Sh. Dhani Ramm VPO Shamshi on dated 20/07/2025 in (E) Section Local-I, under, ESD, HPSEBL, Bhuntar.]
[NIT-137/2025-26][2025_HPSEB_114703_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Kullu |
348 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Ambulance road in village Badal Gram Panchyat Jarpal ward no 04 (Under Deposit MPLAD)]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_16]
|
PWD |
349 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Flood embankment near the House of Sh. Desh Raj and Bittu Kumar adjoining PWD road in Gram Panchyat Jarpal (Under Deposit MPLAD)]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_15]
|
PWD |
350 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of wall to stop land erosion near land of Surinder, Mohinder, subhash etcetera ward no 01 Gram Panchyat Bassa (Under Deposit MPLAD) ]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_14]
|
PWD |
351 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Repair of Sarai Building Adjoining Shiv Temple Kotla Gram Panchyat Kotla (Under Deposit MPLAD) ]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_9]
|
PWD |
352 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Gram Panchayat Community Centre Panchayat Ghar at Saroun Development Block Dharmpur Distt Mandi H P Sub Head Site Development Civil work in ground floor Septic tank and Water supply and Sanitary Installations etc]
[2182-2187][2025_DRDPR_114682_3]
|
Directorate Rural Development and Panchayati Ra |
353 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Pucca path in Village Bagey Baley to the House of Balwant, Shashi, Kewal, Dharam etcetera ward no 05 Gram Panchyat Panalath (Under Deposit MPLAD)]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_8]
|
PWD |
354 |
12-Sep-2025 05:00 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Restoration of rain damages on Sataun Pocca Kando Kotga Road Km 0.0 to 11/00. (SH. C/o R/wall in PCC 1.4.8 at RD 9/340 to 9/357 )Under PDNA]
[NIT 5486-5585 dated 05.09.2025][2025_PWD_114621_4]
|
PWD |
355 |
12-Sep-2025 05:00 PM |
19-Sep-2025 01:30 PM |
19-Sep-2025 03:00 PM |
[E-tenders for Providing and lying Oxygen pipeline from existing medical gas plant to Trauma/New OPD Block .]
[RKS (MS-Samiti) Manifold-592][2025_IGMC1_114702_1]
|
Directorate of Medical Education and Research||IGMC Shimla||MS IGH Shimla |
356 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Pucca path from main road to the House of Budhi Singh, Daljit Swaran etcetera ward no 05 Gram Panchayat Nadoli (Under Deposit MPLAD)]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_13]
|
PWD |
357 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Gram Panchayat Community Centre Panchayat Ghar at Jordhan Development Block Dharmpur Distt Mandi H P Sub Head Site Development Civil work in ground floor Septic tank and Water supply and Sanitary Installations etc]
[2182-2187][2025_DRDPR_114682_2]
|
Directorate Rural Development and Panchayati Ra |
358 |
12-Sep-2025 05:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:30 AM |
[Construction of FIS Rainki Kuhl in Tehsil Baijnath District Kangra HP ]
[7307-7350 Dated 12.09.2025][2025_HPIPH_114692_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Nagrota Bagwan |
359 |
12-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[Recharging of Dry and Defunct Hand pumps through Rain Water Harvesting Structure under JSV Sub Division Fatehpur under Division Fatehpur Distt. Kangra H.P. (SH- Recharging Structure of Defunct Hand Pumps 8 Nos.)]
[NIT NO. 4819-58 dated 11-09-2025][2025_HPIPH_114695_1]
|
HP Irrigation and Public Health||Nurpur Circle,Irrigation and Public Health,HP||Fatehpur-Irrigation and Public Health-HP |
360 |
12-Sep-2025 05:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:30 AM |
[Improvement of WSS Binwa in Tehsil Baijnath District Kangra HP]
[7307-7350 Dated 12.09.2025][2025_HPIPH_114683_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Nagrota Bagwan |
361 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Repair/Construction of Ambulance road from the House of Gian singh to Foujia Singh ,Chuni Lal etcetera Gram Panchyat Nana (Under Deposit MPLAD)]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_5]
|
PWD |
362 |
12-Sep-2025 05:00 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Restoration of rain damages on link road from kando Dugana to Shamah Pamta km 0/0 to 5/870. (SH. C/o R/wall in PCC 1.4.8 at RD 0/500 to 0/516) Under PDNA]
[NIT 5486-5585 dated 05.09.2025][2025_PWD_114621_2]
|
PWD |
363 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Ambulance road from Kut Mata Temple to the House of Milkhi Ram Dhiman in village Samlana Gram Panchyat Nargala (Under Deposit MPLAD)]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_4]
|
PWD |
364 |
12-Sep-2025 05:00 PM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recovery and Restoration on Samej Sarpara road Km 0.00 to 13.450]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114699_1]
|
PWD |
365 |
12-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[CONSTRUCTION OF VETERINARY DISPENSARY BUILDING AT GANGATH TEHSIL INDORA DISTRICT INDORA SUB HEAD PROVIDING E I THERE IN]
[Elect. Division HPPWD Palampur][2025_PWD_114597_1]
|
PWD |
366 |
12-Sep-2025 05:00 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Restoration of rain damages on Kinnu Kulah Road Km 0.0 to 3/00. (SH. C/o B/wall in a Wire Crate at RD 0/280 to 0/335) Under PDNA]
[NIT 5486-5585 dated 05.09.2025][2025_PWD_114621_5]
|
PWD |
367 |
12-Sep-2025 05:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Const Lift water supply scheme to Central University campus at Dehra from River Beas in Tehsil Dehra Distt Kangra ]
[DHR-KNG02-728][2025_HPIPH_114675_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP||Dehra,Irrigation and Public Health,HP |
368 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of flood embankment near the House of Lyak kumar, Anu kumar, Parveen kumar in village Basantpur (Under Deposit MPLAD (H.P.) ]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_3]
|
PWD |
369 |
12-Sep-2025 05:00 PM |
24-Sep-2025 10:00 AM |
24-Sep-2025 11:10 AM |
[Construction of Tube well 200mm dia in Khairi farm at RHRand TS DhaulaKuan, Distt. Sirmour SH Construction of Pump House ]
[No.UHF/Const.-1/Partfile /2025/-1753 dated 12.09.2025 ][2025_YSPU_114673_1]
|
Dr. Yashwant Singh Parmar University of Horticulture and Forestry||Estate Organisation - YSPU||Construction Division - YSPU||Executive Engineer (Const.) - YSPU |
370 |
12-Sep-2025 05:00 PM |
25-Sep-2025 05:00 PM |
26-Sep-2025 11:30 AM |
[R-56/Link /25-26]
[R-56/Link /25-26][2025_CPD1_114552_1]
|
Chief Project Director IDP Solan||DPO Sirmaur |
371 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Pacca Path from House of Deshraj to Bhoto Devi ward no 03 village chanani, Gram Panchyat Siyunhi (Under Deposit MPLAD)(]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_11]
|
PWD |
372 |
12-Sep-2025 05:00 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Restoration of rain damages on Shillai Naya Kuhant Road Km 0/0 to 6/900. (SH. C/o R/wall in PCC 1.4.8 at RD 2/405 to 2/415, 2/440 to 2/450, 3/045 to 3/060, 3/470 to 3/495 and 3/675 to 3/705)Under PDNA]
[NIT 5486-5585 dated 05.09.2025][2025_PWD_114621_1]
|
PWD |
373 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Pucca path with drain from khad to the House of Subash, Naresh, Kashmir etcetera in ward no 4 Village Thappal Gram Panchyat Haar (Under Deposit MPLAD)(]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_2]
|
PWD |
374 |
12-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Restoration of LWSS Rail in Tehsil Nadaun Distt Hamirpur HP]
[No. JSV-EE-NDN-CB-Tender/2025-26/- ][2025_HPIPH_114670_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP||Hamirpur,Irrigation and Public Health,HP |
375 |
12-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Repair and maintenance of E I in Rajeev Gandhi Govt Engineering College Complex Sub Head Replacement of damaged Light switch socket exhaust fan flood lights cable therein]
[Elect. Division HPPWD Palampur][2025_PWD_114667_1]
|
PWD |
376 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Repair/Construction of Ambulance road from the House of Harbans ,Anu etcetera to little Flower school Durana Gram Panchyat Dole Village Kehrian Block Nagrota Surian (Under Deposit MPLAD)]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_10]
|
PWD |
377 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Pucca path with Paver tiles from Khildu chowk to Harizan basti ,Dhiman basti ward no 04 Gram Panchyat Chalwara Khas (Under Deposit MPLAD)(]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_7]
|
PWD |
378 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Pucca path with Paver tiles and drain near House of Vijaydeep Pathania ward no 03 Gram Panchyat Paloura Khas (Under Deposit MPLAD)]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_6]
|
PWD |
379 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Gram Panchayat Community Centre Panchayat Ghar at Kumharda Development Block Dharmpur Distt Mandi H P Sub Head Site Development Civil work in ground floor Septic tank and Water supply and Sanitary Installations etc]
[2182-2187][2025_DRDPR_114682_1]
|
Directorate Rural Development and Panchayati Ra |
380 |
12-Sep-2025 05:00 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Restoration of rain damages on Shahid Kalyan Singh Marg Km 0.0 to 2/800. (SH. C/o R/wall in PCC 1.4.8 at RD 1/120 to 1/140, 2/470 to 2/485 and 2/600 to 2/612)Under PDNA]
[NIT 5486-5585 dated 05.09.2025][2025_PWD_114621_3]
|
PWD |
381 |
12-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Construction of Additional Accommodation for Newly upgraded 50 bedded Civil Hospital at Indora District Kangra HP Sub Head Providing SOP therein Balance work]
[Elect. Division HPPWD Palampur][2025_PWD_114601_1]
|
PWD |
382 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Ambulance road from Panj Peeri Than to Taped Basti upto houses of Kishore Chand ,Sham, Ravinder etcetera ward no 04 Gram Panchyat Jol (Under Deposit MPLAD)(]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_12]
|
PWD |
383 |
12-Sep-2025 05:00 PM |
25-Sep-2025 05:00 PM |
26-Sep-2025 11:30 AM |
[P-34/Sec.Str./25-26.]
[P-34/Sec.Str./25-26.][2025_CPD1_114643_1]
|
Chief Project Director IDP Solan||DPO Sirmaur |
384 |
12-Sep-2025 05:00 PM |
25-Sep-2025 05:00 PM |
26-Sep-2025 11:30 AM |
[R-37/Sec.Str./25-26]
[R-37/Sec.Str./25-26][2025_CPD1_114638_1]
|
Chief Project Director IDP Solan||DPO Sirmaur |
385 |
12-Sep-2025 05:00 PM |
25-Sep-2025 05:00 PM |
26-Sep-2025 11:30 AM |
[R-36/Sec.Str./25-26]
[R-36/Sec.Str./25-26][2025_CPD1_114635_1]
|
Chief Project Director IDP Solan||DPO Sirmaur |
386 |
12-Sep-2025 05:00 PM |
25-Sep-2025 05:00 PM |
26-Sep-2025 11:30 AM |
[R-35/Sec.Str./25-26]
[R-35/Sec.Str./25-26][2025_CPD1_114631_1]
|
Chief Project Director IDP Solan||DPO Sirmaur |
387 |
12-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Construction of AHC Building at Suan in Tehsil Jaisinghpur in District Kangra HP Sub Head Providing E I therein First Floor Dr Residence ]
[Elect. Division HPPWD Palampur][2025_PWD_114653_1]
|
PWD |
388 |
12-Sep-2025 05:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[Restoration of rain damages to FIS Sapni Tehsil Sangla Distt Kinnaur hP]
[KNR-JSD-Peo-EA-I-Tender][2025_HPIPH_114610_1]
|
HP Irrigation and Public Health||Rekongpeo Circle,Irrigation and Public Health,HP||Rekongpeo,Irrigation and Public Health,HP |
389 |
12-Sep-2025 05:00 PM |
25-Sep-2025 05:00 PM |
26-Sep-2025 11:30 AM |
[R-34/Sec.Str./25-26]
[R-34/Sec.Str./25-26][2025_CPD1_114625_1]
|
Chief Project Director IDP Solan||DPO Sirmaur |
390 |
12-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
[Restoration of rain damages on Repoh Sandhari Kadap road km 00 to 9100 SH CO UShape drain with berms at RD 4230 to 4500 LHS CO Retaining wall at RD 4410 to 4453 RHS CO 900 mm dia RCC hume pipe culvert at RD 4360 4410 Under PDNA2023]
[RRD Repoh Sandhari Karap Job No.2][2025_PWD_114650_1]
|
PWD |
391 |
12-Sep-2025 05:00 PM |
25-Sep-2025 05:00 PM |
26-Sep-2025 11:30 AM |
[R-33/Sec.Str./25-26]
[R-33/Sec.Str./25-26][2025_CPD1_114617_1]
|
Chief Project Director IDP Solan||DPO Sirmaur |
392 |
12-Sep-2025 05:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[Construction of Sewerage Treatment plant in Reckong Peo in tehsil Kalpa Distt Kinnaur HP]
[KNR-JSD-Peo-EA-I-Tender][2025_HPIPH_114629_1]
|
HP Irrigation and Public Health||Rekongpeo Circle,Irrigation and Public Health,HP||Rekongpeo,Irrigation and Public Health,HP |
393 |
12-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Replacement of old and damaged MCCB geyser, exhust fan in Circuit house HPPWD Dalhousie in Tehsil Dalhousie District Chamba HP]
[Elect. Division HPPWD Palampur][2025_PWD_114606_1]
|
PWD |
394 |
12-Sep-2025 05:00 PM |
25-Sep-2025 05:00 PM |
26-Sep-2025 11:30 AM |
[R-32/Sec.Str./25-26]
[R-32/Sec.Str./25-26][2025_CPD1_114565_1]
|
Chief Project Director IDP Solan||DPO Sirmaur |
395 |
12-Sep-2025 05:00 PM |
19-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
[A/R and M/o Various road under HPPWD Division Nahan ]
[NHN 3630-49][2025_PWD_114640_1]
|
PWD |
396 |
12-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on link road Amb to Saloi km 000 to 6100 SH-CO Retaining wall at RD 0520 to 0550 LHS Under PDNA2023 Restoration of rain damages on link roa ]
[RRD AMB Job No3 PDNA ][2025_PWD_114660_1]
|
PWD |
397 |
12-Sep-2025 05:00 PM |
25-Sep-2025 05:00 PM |
26-Sep-2025 11:30 AM |
[R-54/Link /25-26]
[R-54/Link /25-26][2025_CPD1_114524_1]
|
Chief Project Director IDP Solan||DPO Sirmaur |
398 |
12-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Replacement of old damaged light fixture and other Accessories to Robotic OT area in Maternity Block of 500 bedded hospital at Dr RPGMC Kangra at Tanda]
[Elect. Division HPPWD Palampur][2025_PWD_114657_1]
|
PWD |
399 |
12-Sep-2025 05:00 PM |
19-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
[A/R and M/o Various road under HPPWD Division Nahan ]
[NHN 3630-49][2025_PWD_114641_1]
|
PWD |
400 |
12-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Pucca path along with Protection wall flood embankment near the House of Sh. Harbans Singh , Sh. Balwant Singh etcetera Gram PanchayatBholKhas (Under Deposit MPLAD) ]
[No.PWJ/CB/TA/2025-3817 dated 30.08.2025][2025_PWD_114624_1]
|
PWD |
401 |
12-Sep-2025 05:00 PM |
19-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
[C/o Temporary bridge over Giri River]
[NHN 3630-49][2025_PWD_114642_1]
|
PWD |
402 |
12-Sep-2025 05:00 PM |
24-Sep-2025 10:00 AM |
24-Sep-2025 11:10 AM |
[Addition of toilet cum bathroom to common room in first floor of Farmers Hostel at Regional ]
[No.UHF/Const.-1/Partfile /2025/-1753 dated 12.09.2025 ][2025_YSPU_114665_1]
|
Dr. Yashwant Singh Parmar University of Horticulture and Forestry||Estate Organisation - YSPU||Construction Division - YSPU||Executive Engineer (Const.) - YSPU |
403 |
12-Sep-2025 05:00 PM |
24-Sep-2025 10:00 AM |
24-Sep-2025 11:10 AM |
[Construction of LDPE lined water harvesting pond at Village Thuran in kotla panjola sirmour]
[No.UHF/Const.-1/Partfile /2025/-1753 dated 12.09.2025 ][2025_YSPU_114656_1]
|
Dr. Yashwant Singh Parmar University of Horticulture and Forestry||Estate Organisation - YSPU||Construction Division - YSPU||Executive Engineer (Const.) - YSPU |
404 |
12-Sep-2025 05:00 PM |
24-Sep-2025 10:00 AM |
24-Sep-2025 11:10 AM |
[Renovation of Gymnasium at Dr YSP University of Horticulture and Forestry Nauni Solan]
[No.UHF/Const.-1/Partfile /2025/-1753 dated 12.09.2025 ][2025_YSPU_114671_1]
|
Dr. Yashwant Singh Parmar University of Horticulture and Forestry||Estate Organisation - YSPU||Construction Division - YSPU||Executive Engineer (Const.) - YSPU |
405 |
12-Sep-2025 05:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[Restoration fo rain damages to WSS Powari in GP Powari Tehsil Kalpa Distt Kinnaur HP]
[KNR-JSD-Peo-EA-I-Tender][2025_HPIPH_114618_1]
|
HP Irrigation and Public Health||Rekongpeo Circle,Irrigation and Public Health,HP||Rekongpeo,Irrigation and Public Health,HP |
406 |
12-Sep-2025 05:00 PM |
25-Sep-2025 05:00 PM |
26-Sep-2025 11:30 AM |
[R-55/Link /25-26]
[R-55/Link /25-26][2025_CPD1_114546_1]
|
Chief Project Director IDP Solan||DPO Sirmaur |
407 |
12-Sep-2025 04:50 PM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recovery and Restoration on Ganvi Keyo road Km. 0.000 to 4.180 ]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114712_1]
|
PWD |
408 |
12-Sep-2025 04:30 PM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recovery and Restoration on Ganvi to Fancha road Km. 0.000 to 9.500 ]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114706_1]
|
PWD |
409 |
12-Sep-2025 04:05 PM |
19-Sep-2025 09:00 AM |
20-Sep-2025 12:00 PM |
[Restoration of damaged Slab Culvert of the road to intake of Ganvi Stage 2 near outlet of Vortex Tank and Spillway Channel which was damaged due to heavy flood in Ganvi Khad on dated 13.08.2025.]
[HPSEBL/GPHD/DB-9/2025-26-72][2025_HPSEB_114698_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Bhaba Nagar||RE Ganvi PH |
410 |
12-Sep-2025 04:00 PM |
19-Sep-2025 04:00 PM |
20-Sep-2025 01:00 PM |
[HPSEBL/GPHD/DB-9/2025-26-74]
[HPSEBL/GPHD/DB-9/2025-26-74][2025_HPSEB_114690_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Bhaba Nagar||RE Ganvi PH |
411 |
12-Sep-2025 04:00 PM |
20-Sep-2025 12:00 PM |
20-Sep-2025 03:00 PM |
[SED-33/2025-26]
[SED-33/2025-26][2025_HPSEB_114616_1]
|
HPSEBL||CE (OP) North||SE (OP) Kangra||Sr. Xen Shahpur |
412 |
12-Sep-2025 04:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Balance work of Health Sub Centre Nandrool at Kangra]
[3579-95 dated 10.09.2025][2025_PWD_114663_2]
|
PWD |
413 |
12-Sep-2025 04:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Repair of damages on Old Kangra Bye Pass Matour road km. 0/000 to 4/900)]
[3579-95 dated 10.09.2025][2025_PWD_114663_1]
|
PWD |
414 |
12-Sep-2025 04:00 PM |
20-Sep-2025 12:00 PM |
20-Sep-2025 03:00 PM |
[SED-34/2025-26]
[SED-34/2025-26][2025_HPSEB_114628_1]
|
HPSEBL||CE (OP) North||SE (OP) Kangra||Sr. Xen Shahpur |
415 |
12-Sep-2025 04:00 PM |
20-Sep-2025 12:00 PM |
20-Sep-2025 03:00 PM |
[SED-35/2025-26]
[SED-35/2025-26][2025_HPSEB_114637_1]
|
HPSEBL||CE (OP) North||SE (OP) Kangra||Sr. Xen Shahpur |
416 |
12-Sep-2025 03:45 PM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recover and Restoration on RGMSJ road Km. 0.000 to 61.000 ]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114696_1]
|
PWD |
417 |
12-Sep-2025 03:30 PM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recovery and Restoration on Gaura Kartot road Km 0.00 to 4.300 ]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114685_1]
|
PWD |
418 |
12-Sep-2025 03:20 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:00 AM |
[TRANSPORTATION OF FOODGRAINS FROM HPSCSC WHOLE SALE GODOWN FATEHPUR TO VARIOUS FAIR PRICE SHOPS]
[FDSKGR--FATEHPURDSD-TENDER-][2025_FCSCA_114693_1]
|
Directorate of Food Civil Supplies and Consumer Affairs |
419 |
12-Sep-2025 03:10 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:00 AM |
[LABOUR WORK OF PADDY AT ANAJ MANDI NAGROTA BAGWAN ]
[FDSKGR-NAGROTAPADDY-LABOUR-][2025_FCSCA_114687_1]
|
Directorate of Food Civil Supplies and Consumer Affairs |
420 |
12-Sep-2025 03:05 PM |
19-Sep-2025 03:05 PM |
20-Sep-2025 12:00 PM |
[HPSEBL/GPHD/DB-9/2025-26-73]
[HPSEBL/GPHD/DB-9/2025-26-73][2025_HPSEB_114680_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Bhaba Nagar||RE Ganvi PH |
421 |
12-Sep-2025 03:00 PM |
24-Sep-2025 11:00 AM |
24-Sep-2025 03:00 PM |
[design manufacture supply ETC (in supervision of OEM) of indoor/outdoor 11kV 5 way RMU with 5 VCB and dismantling of existing old 11kV VCB panel and trans of same from barrage site to HPSEBL colony Thalout for Barrage site of Larji Power House.]
[HPSEB/PEC/11kV_VCB_RMU/2025][2025_HPSEB_114612_1]
|
HPSEBL||CE(Gen) Sundernagar||SE (Design) PHE Sundernagar |
422 |
12-Sep-2025 02:50 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:00 AM |
[TRANSPORTATION OF RICE FROM MS MAHAKAAL RICE MILL DHALIARA TO VARIOUS HPSCSC WHOLE SALE GODOWNS]
[FDSKGR-MAHAKAALRICEMILL-TPT-][2025_FCSCA_114678_1]
|
Directorate of Food Civil Supplies and Consumer Affairs |
423 |
12-Sep-2025 02:30 PM |
18-Sep-2025 03:30 PM |
19-Sep-2025 11:30 AM |
[Tender for the work Removal of silt ,slush from forebay tunnel, forebay and sump of 22.50 MW Ganvi Power House Stage-I accumulated due to entry of muddy/silty water through regulation gate opening at EL 1568.35 during flash flood in Ganvi Khad on dat]
[HPSEBL/SEGB/DB-7/2025-26-13][2025_HPSEB_114668_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Bhaba Nagar |
424 |
12-Sep-2025 02:30 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Re-tender for C/o Secondary WHS Community Water Storage Tank at Village Nohat i/c feeding pipes from Primary WHS at Kotlu Nallah GP Galma under APO Sundernagar DPO IDP Mandi during the year 2025-26]
[113/SNR/SWHS/Nohat/Galma][2025_CPD1_114664_1]
|
Chief Project Director IDP Solan||DPO Kullu |
425 |
12-Sep-2025 02:15 PM |
18-Sep-2025 03:30 PM |
19-Sep-2025 11:30 AM |
[Tender for the work Channelization of Ganvi khad filled with debris from baily bridge to upstream up to HPSEBL Resdential colony RD 100.00 to 450.00Mtr of 22.50 MW Ganvi Power House Division HPSEBL Jeori. during flash flood on dated 13.08.2025 and 1]
[HPSEBL/SEGB/DB-7/2025-26-12][2025_HPSEB_114661_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Bhaba Nagar |
426 |
12-Sep-2025 02:00 PM |
17-Sep-2025 05:00 PM |
18-Sep-2025 12:30 PM |
[DED-71/2025-26]
[DED-71/2025-26][2025_HPSEB_114658_1]
|
HPSEBL||CE (OP) North||SE (OP) Kangra||Sr. Xen Dharamshala |
427 |
12-Sep-2025 02:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Re-tender for C/o Secondary WHS Community Water Storage Tank at Khandera i/c feeding pipes from Primary WHS at Malon Nallah GP Bobar under APO Sundernagar DPO IDP Mandi during the year 2024-25]
[112/SNR/SWHS/Khandera/Bobar][2025_CPD1_114651_1]
|
Chief Project Director IDP Solan||DPO Kullu |
428 |
12-Sep-2025 02:00 PM |
23-Sep-2025 11:00 AM |
23-Sep-2025 11:30 AM |
[Re-tender for C/o Secondary WHS Community Water Storage Tank at Busheher i/c feeding pipes from Primary WHS at Marihnu Nallah GP Troh under APO Sundernagar DPO IDP Mandi during the year 2024-25]
[111/SNR/SWHS/Bushehar-III/Troh][2025_CPD1_114646_1]
|
Chief Project Director IDP Solan||DPO Kullu |
429 |
12-Sep-2025 02:00 PM |
17-Sep-2025 05:00 PM |
18-Sep-2025 12:30 PM |
[DED-69/2025-26]
[DED-69/2025-26][2025_HPSEB_114639_1]
|
HPSEBL||CE (OP) North||SE (OP) Kangra||Sr. Xen Dharamshala |
430 |
12-Sep-2025 02:00 PM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Repair of Path Achar Singh House to Shitla Matta Mandir Ward No 15 Muncipal Corporation in Tehsil Dharamshala Distt. Kangra HP Deposit work SH-Construction of 3.00 mtrs R.C.C Span slab culvert at RD 0/335]
[5134-58][2025_PWD_114613_1]
|
PWD |
431 |
12-Sep-2025 02:00 PM |
17-Sep-2025 05:00 PM |
18-Sep-2025 12:30 PM |
[DED-70/2025-26]
[DED-70/2025-26][2025_HPSEB_114655_1]
|
HPSEBL||CE (OP) North||SE (OP) Kangra||Sr. Xen Dharamshala |
432 |
12-Sep-2025 02:00 PM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Restoration of road damage due to laying optical fiber cable on Sidhpur to Khaniyara road km 0/00 to 4/00 in Tehsil Dharamshala Distt. Kangra HP Against Telecom Deposit SH-P/L C/Cat RD 1/130 to 1/225 1/840 to 1/890 Pavement, U-Shape drain with Grati]
[5134-58][2025_PWD_114613_5]
|
PWD |
433 |
12-Sep-2025 02:00 PM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Annual Repair Maintenance of Dharamshala Dadh Palampur Holta Chadiyar road Portion Dharamshala to Dadh km 0/000 to 15/250 in Tehsil Dharamshala Distt. Kangra HP]
[5134-58][2025_PWD_114613_2]
|
PWD |
434 |
12-Sep-2025 02:00 PM |
17-Sep-2025 05:00 PM |
18-Sep-2025 12:30 PM |
[DED-71/2025-26]
[DED-72/2025-26][2025_HPSEB_114662_1]
|
HPSEBL||CE (OP) North||SE (OP) Kangra||Sr. Xen Dharamshala |
435 |
12-Sep-2025 02:00 PM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Repair of Training room of Govt. College of Teacher Education at Dharamshala Distt. Kangra HP Deposit work SH- Distempering and Painting, wood work and other minor repair work etc]
[5134-58][2025_PWD_114613_4]
|
PWD |
436 |
12-Sep-2025 02:00 PM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Construction of Drainage System and parking in Deputy Commissioner office building at Dharamshala Distt. Kangra H.P Deposit work (Sub Head-Drainage and Parking ]
[5134-58][2025_PWD_114613_3]
|
PWD |
437 |
12-Sep-2025 01:50 PM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recovery and Restoration on Shanadhar Shraikoti road Km 0.00 to 9.500]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114654_1]
|
PWD |
438 |
12-Sep-2025 01:40 PM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recovery and Restoration on Dalog Chasni Mandhog road Km 0.00 to 3.300]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114649_1]
|
PWD |
439 |
12-Sep-2025 01:35 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Bathri Sundla Langera J and K boundary road K.M. 28/0 to 93/400 ]
[EE Salooni letter No. 5026-75 dated 10.09.2025][2025_PWD_114632_2]
|
PWD |
440 |
12-Sep-2025 01:30 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on various road under Salooni Sub Division (Salooni section-II) ]
[EE Salooni letter No. 5026-75 dated 10.09.2025][2025_PWD_114632_4]
|
PWD |
441 |
12-Sep-2025 01:30 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Salooni to Ghal road K.M. 0/0 to 7/500 ]
[EE Salooni letter No. 5026-75 dated 10.09.2025][2025_PWD_114632_3]
|
PWD |
442 |
12-Sep-2025 01:30 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Chakoli to Lader road K.M. 0/0 to 20/0 ]
[EE Salooni letter No. 5026-75 dated 10.09.2025][2025_PWD_114632_1]
|
PWD |
443 |
12-Sep-2025 01:30 PM |
22-Sep-2025 01:00 PM |
23-Sep-2025 03:00 PM |
[SSD-570/2025]
[SSD-570/2025][2025_HPSEB_114648_1]
|
HPSEBL||CE(ES) Hamirpur||SE(Design) Hamirpur||Senior Executive Engineer-III |
444 |
12-Sep-2025 01:25 PM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recovery and Restoration on Uru Besadi Makdoli Km 0.000 to 5.00]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114645_1]
|
PWD |
445 |
12-Sep-2025 01:00 PM |
17-Sep-2025 01:00 PM |
17-Sep-2025 01:00 PM |
[C/O Automatic Testing Station Transport Nagar at Mawalanghat ]
[C/O Automatic Testing Station Transport Nagar at Mawalanghat ][2025_PWD_114633_1]
|
PWD |
446 |
12-Sep-2025 01:00 PM |
20-Sep-2025 11:00 AM |
20-Sep-2025 03:00 PM |
[O and M of Giri Power House]
[REGPHD-45/2025-26][2025_HPSEB_114485_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Nahan||RE Girinagar |
447 |
12-Sep-2025 01:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:30 AM |
[Construction of Executive Engineer residential building of Jal Shakti Division Tissa in Tehsil Churah Distt Chamba HP ]
[EE-JSD-TSA-EA-I-2025- 2196-2245 dated- 12-09-2025][2025_HPIPH_114627_1]
|
HP Irrigation and Public Health||Chamba Circle,Irrigation and Public Health,HP |
448 |
12-Sep-2025 01:00 PM |
03-Oct-2025 05:00 PM |
04-Oct-2025 11:00 AM |
[Hiring of services of Mahindra Bolero (1 no.) in BPMU HPCDP JICA ODA Nahan on contract basis.]
[No. Agr.Sln.DPMU-JICA(G)Veh.(3) Ph-II/2023-24- 1268][2025_HPCDP_114608_1]
|
Himachal Pradesh Agriculture Development Society (JICA-ODA loan)||Project Director - HPCDP Project - JICA-ODA - Hamirpur||DPM-HPCDP - JICA-ODA - Solan |
449 |
12-Sep-2025 12:50 PM |
22-Sep-2025 10:00 AM |
23-Sep-2025 11:00 AM |
[Providing and fixing wooden cupboard in various office under (op) circle Kullu]
[NIT-96/2025-26][2025_HPSEB_113506_2]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Kullu |
450 |
12-Sep-2025 12:45 PM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recovery and Restoration on Nogli Power House to Devton, Kalna, Tenseri,Batuna road Km 0.00 to 8.300]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114634_1]
|
PWD |
451 |
12-Sep-2025 12:35 PM |
17-Sep-2025 02:00 PM |
17-Sep-2025 02:30 PM |
[48/2025-26/Palampur]
[Felling Conversion and carriage][2025_FDC_114623_2]
|
HP State Forest Development Corporation||Director North ,FDC,HP||DM,Dharamsala,Director North,FDC,HP |
452 |
12-Sep-2025 12:30 PM |
17-Sep-2025 02:00 PM |
17-Sep-2025 02:30 PM |
[07/2024-25/Misc/Dehra]
[Felling Conversion and carriage][2025_FDC_114623_1]
|
HP State Forest Development Corporation||Director North ,FDC,HP||DM,Dharamsala,Director North,FDC,HP |
453 |
12-Sep-2025 12:30 PM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recovery and Restoration on Kashdhar Darkali road Km 0.00 to 22.000]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114626_1]
|
PWD |
454 |
12-Sep-2025 12:20 PM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recovery and Restoration on Seripul Anurakshi upto Kareri road Km 0.000 to 5.690]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114620_1]
|
PWD |
455 |
12-Sep-2025 12:00 PM |
02-Oct-2025 05:00 PM |
03-Oct-2025 11:00 AM |
[EOI]
[HPGIC/ IMFL/ BIO-BRANDS/ EOI/ 2025-759][2025_HPGIC_114562_2]
|
HP General Industries Corporation Ltd |
456 |
12-Sep-2025 11:55 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recovery and Restoration on Anu Munish road Km. 0.000 to 11.000 ]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114615_1]
|
PWD |
457 |
12-Sep-2025 11:45 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Recovery and Restoration of link road to village Bahli Km. 0.000 to 1.600 ]
[PW/RMP/TA/2025-4787dated 09.09.2025][2025_PWD_114611_1]
|
PWD |
458 |
12-Sep-2025 11:30 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Hiring of tipper for the removal of slips]
[Restoration of rain damages on various roads under HPPWD sub Division Manali 2m][2025_PWD_114358_1]
|
PWD |
459 |
12-Sep-2025 11:30 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Hiring of JCB for the removal of slips]
[Restoration of rain damages on various roads under HPPWD sub Division Manali 9m][2025_PWD_114377_1]
|
PWD |
460 |
12-Sep-2025 11:30 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Hiring of tipper for the removal of slips]
[Restoration of rain damages on various roads under HPPWD sub Division Manali 1m][2025_PWD_114356_1]
|
PWD |
461 |
12-Sep-2025 11:30 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Hiring of JCB for the removal of slips]
[Restoration of rain damages on various roads under HPPWD sub Division Manali 11m][2025_PWD_114383_1]
|
PWD |
462 |
12-Sep-2025 11:30 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Hiring of JCB for the removal of slips]
[Restoration of rain damages on various roads under HPPWD sub Division Manali 10m][2025_PWD_114379_1]
|
PWD |
463 |
12-Sep-2025 11:15 AM |
18-Sep-2025 12:00 PM |
19-Sep-2025 01:00 PM |
[HPSEBL/GPHD/DB-9/2025-26-71]
[HPSEBL/GPHD/DB-9/2025-26-71][2025_HPSEB_114568_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Bhaba Nagar||RE Ganvi PH |
464 |
12-Sep-2025 11:15 AM |
17-Sep-2025 11:20 AM |
17-Sep-2025 11:30 AM |
[Restoration of Rain Damages of various Scheme under JSV Section Bagsiad and Kelodhar]
[4906-30 DT 11/09/2025][2025_HPIPH_114607_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP||Sarkaghat,Irrigation and Public Health,HP |
465 |
12-Sep-2025 11:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[RRD on Kaloha Pragpur Dhaliara Dada Siba Sansarpur Terrace road Km.0/0 to 9/0 (SH C/o R/wall at RD 0/700 to 0/720) PDNA]
[2983-3010 dated 03.09.2025][2025_PWD_114375_1]
|
PWD |
466 |
12-Sep-2025 11:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[Restoration of Rain Damages on Kaloa Pragpur Dhaliara Dada Siba Sansarpur terrace road km 0/00 to 9/00 (SH C/o B/wall at RD 1/175 to 1/210 and 1/160 to 1/200) PDNA]
[2983-3010 dated 03.09.2025][2025_PWD_114385_1]
|
PWD |
467 |
12-Sep-2025 11:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[RRD on Kaloha Pragpur Dhaliara Dada Siba Sansarpur Terrace road Km.0/0 to 9/0 (SH C/o B/wall at RD 3/075 to 3/150) PDNA]
[2983-3010 dated 03.09.2025][2025_PWD_114391_1]
|
PWD |
468 |
12-Sep-2025 11:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[RRD on Kaloha Pragpur Dhaliara Dada Siba Sansarpur Terrace road Km.0/0 to 9/0 (SH C/o CC Pavement at RD 3/600 to 3/640) PDNA]
[2983-3010 dated 03.09.2025][2025_PWD_114403_1]
|
PWD |
469 |
12-Sep-2025 11:00 AM |
18-Sep-2025 12:00 PM |
18-Sep-2025 03:00 PM |
[103/2025-26]
[103/2025-26][2025_HPSEB_114475_2]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr. Xen (E) Rajgarh |
470 |
12-Sep-2025 11:00 AM |
17-Sep-2025 03:00 PM |
18-Sep-2025 11:00 AM |
[Providing and fixing wooden Cupboards for up keeping of office record in various branches of Division office building at Manali under Electrical Division HPSEBL Manali.]
[HPSEBL/EDM/NIT-32/2025-26][2025_HPSEB_114602_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Manali |
471 |
12-Sep-2025 11:00 AM |
17-Sep-2025 03:00 PM |
18-Sep-2025 11:00 AM |
[Tender for Repair and Maintenance of sunked flooring and cracked brick wall of toilet cum bath at 33/11 KV Sub station Dhundhi under Electrical Division HPSEBL Manali]
[HPSEBL/EDM/NIT-33/2025-26][2025_HPSEB_114603_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Manali |
472 |
12-Sep-2025 11:00 AM |
17-Sep-2025 03:00 PM |
18-Sep-2025 11:00 AM |
[Tender for LT extension to LOH at Fazla and LT extension to LOH at Koot from existing 63KVA DTR Chachogi under ESD, HPSEBL, Naggar on Turnkey Basis]
[HPSEBL/EDM/NIT-34/2025-26][2025_HPSEB_114605_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Manali |
473 |
12-Sep-2025 11:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[RRD on Kaloha Shantla road Km. 0/0 to 16/720 (SH C/O B/wall at RD 8/575 to 8/585, C/o R/wall at RD 10/555 to 10/565, 10/900 to 10/910, 11/330 to 11/385, 11/880 to 11/900 and 11/850 to 11/860) PDNA]
[2983-3010 dated 03.09.2025][2025_PWD_114452_1]
|
PWD |
474 |
12-Sep-2025 11:00 AM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:30 AM |
[Construction of Panchayat comm. Centre P.Ghar GP Arhal Dev. Block Rohru Distt Shimla ( SH Civil work and WS and SI Complete]
[Arahal ][2025_DRDPR_114453_1]
|
Directorate Rural Development and Panchayati Ra |
475 |
12-Sep-2025 11:00 AM |
18-Sep-2025 12:00 PM |
18-Sep-2025 03:00 PM |
[104/2025-26]
[104/2025-26][2025_HPSEB_114533_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr. Xen (E) Rajgarh |
476 |
12-Sep-2025 11:00 AM |
27-Sep-2025 05:00 PM |
29-Sep-2025 11:00 AM |
[ Tender for Outsourcing Manpower ]
[HF/ES/outsource2025][2025_HIMFE_114438_1]
|
HP Cooperative Marketing and Consumers Federation Ltd.||Head Office - HIMFED |
477 |
12-Sep-2025 11:00 AM |
18-Sep-2025 12:00 PM |
18-Sep-2025 03:00 PM |
[105/2025-26]
[105/2025-26][2025_HPSEB_114535_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr. Xen (E) Rajgarh |
478 |
12-Sep-2025 11:00 AM |
18-Sep-2025 12:00 PM |
18-Sep-2025 03:00 PM |
[107/2025-26]
[107/2025-26][2025_HPSEB_114548_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr. Xen (E) Rajgarh |
479 |
12-Sep-2025 11:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[RRD on Kaloha Shantla road Km. 0/0 to 16/720 (SH C/o CC Pavement at RD 8/255 to 8/285 and 8/315 to 8/345) PDNA]
[2983-3010 dated 03.09.2025][2025_PWD_114444_1]
|
PWD |
480 |
12-Sep-2025 11:00 AM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[C/O Link Road Takka To Nari]
[4403-32 dated 22.08.2025][2025_PWD_114466_1]
|
PWD |
481 |
12-Sep-2025 11:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[RRD on Rakkar Shantla road Km. 0/0 to 15/600 (SH C/O R/wall at RD 3/680 to 3/685, 5/110 to 5/125, 5/310 to 5/350, 5/750 to 5/765, 6/350 to 6/365 and B/wall at RD 12/020 to 12/065) PDNA]
[2983-3010 dated 03.09.2025][2025_PWD_114460_1]
|
PWD |
482 |
12-Sep-2025 11:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[RRD on Kaloha Shantla road Km. 0/0 to 16/720 (SH C/o CC Pavement at RD 8/415 to 8/490 and 8/535 to 8/575) PDNA]
[2983-3010 dated 03.09.2025][2025_PWD_114449_1]
|
PWD |
483 |
12-Sep-2025 11:00 AM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[A/R and M/O UAM Road Km. 2/000 to 19/000 ]
[4403-32 dated 22.08.2025][2025_PWD_114539_1]
|
PWD |
484 |
12-Sep-2025 11:00 AM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[C/O Link Road Batuhi to Badoli up to Mohalla Dharwal ]
[4403-32 dated 22.08.2025][2025_PWD_114476_1]
|
PWD |
485 |
12-Sep-2025 11:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[RRD on various roads under HPPWD Sub Division Pragpur (1) Bharwain to Dehipukhar via Karoa road Km. 0/0 to 11/0 (SH Repair of Pot holes at various RDs) (2) Kanol to Dhaunta road Km. 0/0 to 3/300 (SH Repair of Pot holes between RD 0/0 to 2/0) PDNA.]
[2983-3010 dated 03.09.2025][2025_PWD_114471_1]
|
PWD |
486 |
12-Sep-2025 11:00 AM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
[Restoration of Rain Damages on Una Takka Dhamandri Road.]
[4403-32 dated 22.08.2025][2025_PWD_114516_1]
|
PWD |
487 |
12-Sep-2025 11:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[RRD on Saleti to Bhindla road Km. 0/0 to 2/820 (SH C/O R/wall between RD 2/0 to 2/150) PDNA]
[2983-3010 dated 03.09.2025][2025_PWD_114468_1]
|
PWD |
488 |
12-Sep-2025 11:00 AM |
18-Sep-2025 12:00 PM |
18-Sep-2025 03:00 PM |
[106/2025-26]
[106/2025-26][2025_HPSEB_114542_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr. Xen (E) Rajgarh |
489 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Link road from Kathera Chowk to Ropa Km 0/00 to 0/900 ]
[Link road from Kathera Chowk to Ropa Km 0/00 to 0/900 ][2025_PWD_114173_1]
|
PWD |
490 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Dandroo to Nuel road km 0/00 to 2/00 ]
[NIT No. 6695-6794][2025_PWD_114419_1]
|
PWD |
491 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Darkoti Shahtalai road km 0/00 to 4/555]
[NIT No. 6695-6794][2025_PWD_114424_1]
|
PWD |
492 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[C/O link road near Hand Pump village Jhanrmai ]
[C/O link road near Hand Pump village Jhanrmai ][2025_PWD_114433_1]
|
PWD |
493 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Nadaun Sujanpur road Km 0/00 to 14/600 ]
[Nadaun Sujanpur road Km 0/00 to 14/600 ][2025_PWD_114437_1]
|
PWD |
494 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Darkoti Shahtalai road km 0/00 to 4/555 ]
[NIT No. 6695-6794][2025_PWD_114528_1]
|
PWD |
495 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Khorpa Biar road km 0/00 to 5/500 ]
[NIT No. 6695-6794][2025_PWD_114537_1]
|
PWD |
496 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[SDP/2020/185 C/O Pully Sampark Marg to village Budhana Khas ]
[SDP/2020/185 C/O Pully Sampark Marg to village Budhana Khas ][2025_PWD_114461_1]
|
PWD |
497 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[C/O Sukh Ram Ke Ghar Se Dadoh Ki Taraf Tehsil Galore District Hamirpur ]
[C/O Sukh Ram Ke Ghar Se Dadoh Ki Taraf Tehsil Galore District Hamirpur ][2025_PWD_114254_1]
|
PWD |
498 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Sarla to Chakmoh road km 0/00 to 8/00 ]
[NIT No. 6695-6794][2025_PWD_114513_1]
|
PWD |
499 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Sarla to Chakmoh road km 0/00 to 8/00 ]
[NIT No. 6695-6794][2025_PWD_114505_1]
|
PWD |
500 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Re-construction of Rain damages on NH-70 Kohla Bilkleshwar road Km 0/00 to 10/600 ]
[Re-construction of Rain damages on NH-70 Kohla Bilkleshwar road Km 0/00 to 10/600 ][2025_PWD_114465_1]
|
PWD |
501 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Link road Harizan Basti Jhanjiani km 0/00 to 1/850 ]
[NIT No. 6695-6794][2025_PWD_114522_1]
|
PWD |
502 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Badaran Garli via Galliyan Jole road km 13/500 to 22/500 ]
[NIT No. 6695-6794][2025_PWD_114580_1]
|
PWD |
503 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Badaran Garli via Galliyan jole km 4/00 to 13/500 ]
[NIT No. 6695-6794][2025_PWD_114551_1]
|
PWD |
504 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[SDF/2025/66 (R/O) Restoration of rain Damages on Badaran Garli via Galliyan Jole road km 4/00 to 13/500 ]
[NIT No. 6695-6794][2025_PWD_114589_1]
|
PWD |
505 |
12-Sep-2025 10:30 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[A R and M O of various hand pumps under JS Sub Division Koti Section Masround in Tehsil and Distt Chamba HP ]
[EE-JSD-TSA-EA-I-2025- 2107-56 dated- 11-09-2025][2025_HPIPH_114600_1]
|
HP Irrigation and Public Health||Chamba Circle,Irrigation and Public Health,HP |
506 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[SDF/2025/67 (R/O) Restoration of rain Damages on Barsar Shahtalai road km 0/00 to 11/400]
[NIT No. 6695-6794][2025_PWD_114591_1]
|
PWD |
507 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[C/O Ramesh Ke Ghar Se Khad Ki Taraf Tehsil Galore District Hamirpur ]
[C/O Ramesh Ke Ghar Se Khad Ki Taraf Tehsil Galore District Hamirpur ][2025_PWD_114236_1]
|
PWD |
508 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Jeoli Devi Jaure Amb road via Karsai road Km 0/00 to 8/00]
[NIT No. 6695-6794][2025_PWD_114411_1]
|
PWD |
509 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Maslana Bhutlar road km 0/00 to 5/00 ]
[NIT No. 6695-6794][2025_PWD_114567_1]
|
PWD |
510 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Sampark Marg Lasmai road to Cheed Nallah Km 0/00 to 0/250 ]
[Sampark Marg Lasmai road to Cheed Nallah Km 0/00 to 0/250 ][2025_PWD_114245_1]
|
PWD |
511 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Dandroo to Mankhad via Charcheri km 0/00 to 2/00]
[NIT No. 6695-6794][2025_PWD_114417_1]
|
PWD |
512 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Amroh Baldook via Banal Basti 0/00 to 4/500 ]
[Amroh Baldook via Banal Basti 0/00 to 4/500 ][2025_PWD_114230_1]
|
PWD |
513 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[Rangas Baldook Jeehan Km 0/00 to 8/00 ]
[Rangas Baldook Jeehan Km 0/00 to 8/00 ][2025_PWD_114234_1]
|
PWD |
514 |
12-Sep-2025 10:30 AM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:00 AM |
[SDF/2025/65 (R/O) Restoration of rain Damages on Garli Harsour road km 0/00 to 6/00]
[NIT No. 6695-6794][2025_PWD_114586_1]
|
PWD |
515 |
12-Sep-2025 10:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Renovation of roof in Dairy Shed and Milking Parlour Deptt. Of Live Stock Farm complex COVAS at CSKHPKV, Palampur (SH Providing and fixing CGI sheet roofing with ridges and MS purlins in shed No. 21 RHS and old Milk Parlour)]
[EE CSKHPKV NIT No. 3273-96 dt 04/09/2025][2025_HPKV_114195_1]
|
HP Krishi Vishva Vidyalaya |
516 |
12-Sep-2025 10:00 AM |
20-Sep-2025 03:00 PM |
20-Sep-2025 03:30 PM |
[Sewerage Scheme for Shimla Town upgradation of 100 mm dia to 150 mm dia near Shivam Daily Needs shope and surrounding areas in Ruldu Bhatta Area STP ND Network ]
[SJPNL/Sewerage/NIT/1749-53 dt. 11.09.2025][2025_SJPNL_114572_1]
|
Shimla Jal Prabandhan Nigam Ltd |
517 |
12-Sep-2025 10:00 AM |
25-Sep-2025 11:00 AM |
25-Sep-2025 11:30 AM |
[Providing and laying main supply line from overhead tanks to all around of the Hotel Peterhof Building at Chauramadan Shimla (H.P)]
[Proj./2-148-Vol-V][2025_HPTDC_114574_1]
|
Himachal Pradesh Tourism Development Corporation||Head Office - Shimla - HPTDC||Project Branch - HPTDC |
518 |
12-Sep-2025 10:00 AM |
20-Sep-2025 03:00 PM |
20-Sep-2025 03:30 PM |
[Sewerage Scheme for Shimla Town Providing and laying of 150 mm dia DI sewer pipeline and manhole construction work at Krishnagar Kalicharan house at sabji mandi and surrounding locations to STP Lalpani network ]
[SJPNL/Sewerage/NIT/1749-53 dt. 11.09.2025][2025_SJPNL_114575_1]
|
Shimla Jal Prabandhan Nigam Ltd |
519 |
12-Sep-2025 10:00 AM |
25-Sep-2025 11:00 AM |
25-Sep-2025 11:30 AM |
[Repair of staff quarters, construction of toilet in side dormitory at Hotel Renuka, Renukaji Distt. Sirmour (H.P).]
[Proj./7-8/2024-V][2025_HPTDC_114588_1]
|
Himachal Pradesh Tourism Development Corporation||Head Office - Shimla - HPTDC||Project Branch - HPTDC |
520 |
12-Sep-2025 10:00 AM |
20-Sep-2025 03:00 PM |
20-Sep-2025 03:30 PM |
[Sewerage Scheme for Shimla Town Providing and laying 150 mm dia DI sewer pipeline from existing chamber to Durga Singh Chauhan niwas and surrounding area to STP Snowdon Network]
[SJPNL/Sewerage/NIT/1749-53 dt. 11.09.2025][2025_SJPNL_114570_1]
|
Shimla Jal Prabandhan Nigam Ltd |
521 |
12-Sep-2025 10:00 AM |
25-Sep-2025 11:00 AM |
25-Sep-2025 11:30 AM |
[Replacement of CGI Sheet roofing above New block, Old Block and Conference Hall Building with Prepainted CGI Sheet Roofing at Hotel Holiday Home, Shimla (H.P)]
[Proj./2-111/2022-IV][2025_HPTDC_114590_1]
|
Himachal Pradesh Tourism Development Corporation||Head Office - Shimla - HPTDC||Project Branch - HPTDC |
522 |
12-Sep-2025 10:00 AM |
20-Sep-2025 03:00 PM |
20-Sep-2025 03:30 PM |
[Sewerage Scheme for Shimla Town Providing and laying of 150 mm dia DI sewer pipe line existing chamber at nallah to Comely Bank in Kaithu Area STP ND Network]
[SJPNL/Sewerage/NIT/1749-53 dt. 11.09.2025][2025_SJPNL_114550_1]
|
Shimla Jal Prabandhan Nigam Ltd |
523 |
12-Sep-2025 10:00 AM |
25-Sep-2025 11:00 AM |
25-Sep-2025 11:30 AM |
[Construction of Dormitory at car parking at basement and security cabin at main entrance of Hotel Meghdoot Kiarighat Distt. Solan (H.P).]
[Proj./4-43/24-VI][2025_HPTDC_114584_1]
|
Himachal Pradesh Tourism Development Corporation||Head Office - Shimla - HPTDC||Project Branch - HPTDC |
524 |
12-Sep-2025 10:00 AM |
25-Sep-2025 11:00 AM |
25-Sep-2025 11:30 AM |
[Renovation of Hotel Hamir Hamirpur H.P ]
[Proj./3-20/2023-III][2025_HPTDC_114560_1]
|
Himachal Pradesh Tourism Development Corporation||Head Office - Shimla - HPTDC||Project Branch - HPTDC |
525 |
12-Sep-2025 10:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 10:30 AM |
[Restoration of rain damages ]
[6021-23][2025_PWD_114563_1]
|
PWD |
526 |
12-Sep-2025 10:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Chandesh Kolni Dhalwan road ]
[6021-23][2025_PWD_114555_1]
|
PWD |
527 |
12-Sep-2025 10:00 AM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on various roads in Padwahan Section under Padhar Sub-Division HPPWD Padhar. ]
[PW-MDI(P)Tender-NIT-7971-7995 dated 11.09.2025][2025_PWD_114599_1]
|
PWD |
528 |
12-Sep-2025 10:00 AM |
25-Sep-2025 11:00 AM |
25-Sep-2025 11:30 AM |
[ Construction of laundry shade, replacement of roof gutter facia outside of kitchen store, Conference Hall and renovation of toilet of Room No. 200 at Hotel Pinewood, Barog Distt. Solan (H.P)]
[Proj./(R-M)7-30/18-TDC][2025_HPTDC_114579_1]
|
Himachal Pradesh Tourism Development Corporation||Head Office - Shimla - HPTDC||Project Branch - HPTDC |
529 |
12-Sep-2025 10:00 AM |
20-Sep-2025 03:00 PM |
20-Sep-2025 03:30 PM |
[Sewerage Scheme for Shimla Town Providing and laying of 150 mm dia DI sewer pipe line existing chamber to Blessing building and surrounding area in Shanan Area STP ND Network]
[SJPNL/Sewerage/NIT/1749-53 dt. 11.09.2025][2025_SJPNL_114578_1]
|
Shimla Jal Prabandhan Nigam Ltd |
530 |
12-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[SEES/SHIMLA-382/2025-26 ]
[SEES/SHIMLA-382/2025-26][2025_HPSEB_110565_2]
|
HPSEBL||CE(ES) Hamirpur||SE(ES) Shimla |
531 |
12-Sep-2025 10:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:30 AM |
[Ar and MO Plassi Smaila Trifalghat road ]
[6359-61][2025_PWD_114279_1]
|
PWD |
532 |
12-Sep-2025 10:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:30 AM |
[Restoration of rain damages on Patrighat Jawali Gehra road]
[6021-23][2025_PWD_114543_1]
|
PWD |
533 |
12-Sep-2025 10:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Construction of Staff quartersType-IV at CHC at Jawalamukhi in Distt. Kangra (H.P.)]
[NIT No 3968-69 Dated 06.09.2025][2025_PWD_114529_1]
|
PWD |
534 |
12-Sep-2025 10:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:30 AM |
[Restoration of rain damages on Trifalghat Badoun Batheda Thana Chowki road]
[6359-61][2025_PWD_114272_1]
|
PWD |
535 |
12-Sep-2025 10:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Repair and Renovation of Monal Hostel, COVAS, CSKHPKV, Palampur. (SH Providing and laying interlock paver tiles in New scooter shed)]
[EE CSKHPKV NIT No. 3273-96 dt 04/09/2025][2025_HPKV_114168_1]
|
HP Krishi Vishva Vidyalaya |
536 |
12-Sep-2025 10:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[C/O Boundary wall of CHC Building at Majheen,Tehsil-Khundian Distt.Kangra (HP)]
[No 3968-69 Dated 06.09.2025][2025_PWD_114501_1]
|
PWD |
537 |
12-Sep-2025 10:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:30 AM |
[Restoration of rain damages on Punta Dhalwan road ]
[6021-23][2025_PWD_114527_1]
|
PWD |
538 |
12-Sep-2025 10:00 AM |
18-Sep-2025 09:00 AM |
19-Sep-2025 11:30 AM |
[Balance work of Govt. Sr. Sec. School Kutiara in Tehsil Jawalamukhi Distt. Kangra. H.P.]
[NIT No 3968-69 Dated 06.09.2025][2025_PWD_114515_1]
|
PWD |
539 |
12-Sep-2025 10:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Renovation of Poultry Farm Deptt. of Animal Genetics and Breeding, COVAS, CSKHPKV, Palampur]
[EE CSKHPKV NIT No. 3273-96 dt 04/09/2025][2025_HPKV_114177_1]
|
HP Krishi Vishva Vidyalaya |
540 |
12-Sep-2025 10:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[-Construction of Ramlila stage ( Mangli Guga ) at Silh in tehsil Jawalamukhi District Kangra Himachal Pradesh ]
[NIT No 3968-69 Dated 06.09.2025][2025_PWD_114510_1]
|
PWD |
541 |
12-Sep-2025 09:55 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Restoration of rain damages to LIS / FIS Chowkhang Sindhwari in G.P Thirot Distt.Lahaul Spiti HP Under PDNA at Sr.No.3862 ]
[8264-8314 dated 11.09.2025][2025_HPIPH_114467_1]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Keylong,Irrigation and Public Health,HP |
542 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of Harizan Basti Fatewal to village Bangarh road km.0.0 to 1.200 (SH Construction of R.wall and Patch work at various RDs) (under PDNA 2023)]
[Job 06 R/R work of Harizan Basti Fatewal][2025_PWD_114333_1]
|
PWD |
543 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of Una Santoshgarh Mehatpur road km.8.0 to 21.0(SH P L Patch works between km 11.030 to 12.0 or 15.670 to 16.900 or 16.445 to 16.835 and 18.500 to 18.950) (under PDNA 2023)]
[Job 02 R/R work of Una Santoshgarh Mehatpur road][2025_PWD_114266_1]
|
PWD |
544 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of Bangarh Fathewal road km.0.0 to 4.900 (SH Construction of R.wall at RD.1.825 to 1.846) (under PDNA 2023)]
[Job 03 R/R work of Bangarh Fathewal road][2025_PWD_114293_1]
|
PWD |
545 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of Bangarh Fathewal road km.0.0 to 4.900 (SH Construction of R. wall at RD.1.960 to 2.024) (under PDNA 2023)]
[Job 04 R/R work of Bangarh Fathewal road][2025_PWD_114295_1]
|
PWD |
546 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of Bangarh Fathewal road km.0.0 to 4.900 (SH Construction of R.wall at RD.2.690 to 2.733) (under PDNA 2023)]
[Job 05 R/R work of Bangarh Fathewal road][2025_PWD_114298_1]
|
PWD |
547 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of Behdala Chattara Peernigaha road km.0.0 to 2.200 (SH Construction of U- shape drain and paver blocks at RD.1.150 to 1.250(LHS) (under PDNA 2023)]
[Job 10 R/R work of Behdala Chattara Peernigaha road][2025_PWD_114420_1]
|
PWD |
548 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of Behdala Jankour via Abada Barana road km.0.0 to 4.600 (SH construction of R.wall at RD.3.200 to 3.322 ) (under PDNA 2023)]
[Job 11 R/R work of Behdala Jankour via Abada Barana road][2025_PWD_114425_1]
|
PWD |
549 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of link road Ajouli Sanoli upto Punjab Boundary km.0.0 to 4.200 (SH Providing and fixing paver blocks at RD.2.800 to 3.140 and Circular road Sanoli km.0.0 to 1.800(SH Providing and fixing paver blocks at RD.0.450 to 0.465]
[Job 12 R/R work of L/R Ajouli Sanoli][2025_PWD_114464_1]
|
PWD |
550 |
12-Sep-2025 09:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Restoration of Rain Damages under Jal Shakti Sub Division Banjar Distt Kullu H.P. ]
[NIT No. 6888-6987 dt. 10.09.2025][2025_HPIPH_114545_5]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
551 |
12-Sep-2025 09:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Providing WSS Phatti Pekhari (Phase Daran) in GP Pekhari tehsil Banjar Distt Kullu H.P. ]
[NIT No. 6888-6987 dt. 10.09.2025][2025_HPIPH_114545_4]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
552 |
12-Sep-2025 09:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Restoration of rain damages to various LWSS/WSS under section Bajaura tehsil Bhunter Distt Kullu H.P. ]
[NIT No. 6888-6987 dt. 10.09.2025][2025_HPIPH_114545_8]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
553 |
12-Sep-2025 09:00 AM |
19-Sep-2025 09:00 AM |
20-Sep-2025 11:30 AM |
[Restoraion of rain damages to WSS Upper Railla (Phase Sharn) in GP Railla in tehsil Sainj Distt Kullu H.P. ]
[NIT No. 6888-6987 dt. 10.09.2025][2025_HPIPH_114545_3]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
554 |
12-Sep-2025 09:00 AM |
17-Sep-2025 10:00 AM |
17-Sep-2025 10:30 AM |
[Restoration of rain damages on Bhawarna Jhunga Devi road KM 15/500 to 26/250 ]
[5048-56 dated 08.09.2025][2025_PWD_114229_1]
|
PWD |
555 |
12-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Restoration of rain damage to WSS Dharot Ghari in GP Rupani in Tehsil and Distt Chamba HP]
[EE-JSD-TSA-EA-I-2025- 2107-56 dated- 11-09-2025][2025_HPIPH_114596_1]
|
HP Irrigation and Public Health||Chamba Circle,Irrigation and Public Health,HP |
556 |
12-Sep-2025 09:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Restoration of rain damages to LWSS Neol Chawara shogi and Sujehani in tehsil Bhunter Distt Kullu H.P. ]
[NIT No. 6888-6987 dt. 10.09.2025][2025_HPIPH_114545_7]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
557 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of Charatgarh Khanpur road km.0.0 to 2.200(SH C O U shape drain and NP-3 pipes in RD.0.270 to 0.810(under PDNA 2023 )]
[Job 01 R/R work of Charatgarh Khanpur road ][2025_PWD_114224_1]
|
PWD |
558 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of link road Jankour to Bhadouri upto Swan Nadi km.0.0 to 0.800 (SH Construction of Toe wall of causeway at RD.0.426 to 0.444.90 (under PDNA 2023)]
[Job 07 R/R work of L/R Jankour to Bhadouri][2025_PWD_114344_1]
|
PWD |
559 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of Khuhi Jhorowal Bharolian road km.3.600 (SH Construction of R.wall and shoulder at RD 2.200 to 2.221 (under PDNA 2023)]
[Job 13 R/R work of Khuhi Jhorowal Bharolian road][2025_PWD_114573_1]
|
PWD |
560 |
12-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Restoration of rain damages to WSS Hadot Mani Sandhi in GP Dullar in Tehsil and Distt Chamba HP ]
[EE-JSD-TSA-EA-I-2025- 2107-56 dated- 11-09-2025][2025_HPIPH_114595_1]
|
HP Irrigation and Public Health||Chamba Circle,Irrigation and Public Health,HP |
561 |
12-Sep-2025 09:00 AM |
24-Sep-2025 03:00 PM |
25-Sep-2025 10:00 AM |
[No. HPSEBL/EMD/SP-12/2025-26-21]
[No.HPSEBL/EMD/SP-12/2025-26-21][2025_HPSEB_114532_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Bhaba Nagar||Sr. Xen EMD Bhaba |
562 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of Khuhi Jhorowal Bharolian road km.3.600 (SH Construction of R.wall and shoulder at RD 2.425 to 2.446 (under PDNA 2023)]
[Job 14 R/R work of Khuhi Jhorowal Bharolian road][2025_PWD_114582_1]
|
PWD |
563 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of Bangarh Nangran road to Ghalore Chowk to Jakhera via Morbar Bhabour Sahib upto Punjab Boundary Bhatoli Shiv Mandir to Raizada Mohalla to Ranout Mohalla (SH Construction of R.wall and shoulders at RD.2.470 to 2.498)]
[Job 09 R/R work of Bangarh Nangran road][2025_PWD_114416_1]
|
PWD |
564 |
12-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[LWSS Palehi to Baroh in GP Chandi in Tehsil Distt Chamba HP ]
[EE-JSD-TSA-EA-I-2025- 2107-56 dated- 11-09-2025][2025_HPIPH_114594_1]
|
HP Irrigation and Public Health||Chamba Circle,Irrigation and Public Health,HP |
565 |
12-Sep-2025 09:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Restoration of Rain Damages under Jal Shakti Sub Division Banjar Distt Kullu H.P. ]
[NIT No. 6888-6987 dt. 10.09.2025][2025_HPIPH_114545_6]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
566 |
12-Sep-2025 09:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Restoration of Rain Damages to LIS Hat-II phase G.P Hat in tehsil Bhunter Distt Kullu H.P. ]
[NIT No. 6888-6987 dt. 10.09.2025][2025_HPIPH_114545_9]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
567 |
12-Sep-2025 09:00 AM |
17-Sep-2025 11:00 AM |
17-Sep-2025 11:00 AM |
[Restoration of rain damages of various WSS under Section Thunag JSV Sub-Division Thunag. ]
[4906-30 DT 11/09/2025][2025_HPIPH_114587_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP||Sarkaghat,Irrigation and Public Health,HP |
568 |
12-Sep-2025 09:00 AM |
17-Sep-2025 09:00 AM |
17-Sep-2025 12:00 PM |
[Construction of toilet near SVM School in ward no. 03 at Nirmand.]
[No.NP/NMD/2025-2663-2666][2025_UDDHP_114593_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Nagar Panchayat Nirmand |
569 |
12-Sep-2025 09:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 12:30 PM |
[R/m work in SDM office sunni in ward No. 1 Municipal Council Sunni . ]
[MC SUNNI 992-997 Dated 11-09-2025][2025_UDDHP_114592_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Nagar Panchayat Suni - UDDHP |
570 |
12-Sep-2025 09:00 AM |
18-Sep-2025 09:00 AM |
18-Sep-2025 11:00 AM |
[Restoration and repair work of Bangarh Nangran road to Ghalore chowk to Jakhera via Morbar Bhabour Sahib upto Punjab Boundary Bhatoli Shiv Mandir to Raizada Mohalla to Ranout Mohalla (SH Construction of R.wall and shoulders at RD.2.440 to 2.461)]
[Job 08 R/M work of Bangarh Nangran road][2025_PWD_114413_1]
|
PWD |
571 |
11-Sep-2025 06:55 PM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:00 AM |
[Construction of SE HPPWD Residence at Dehra in District Kangra (H.P.) ]
[EE Dehra letter No.6070-74 dtd. 06.09.2025 and 6156-75 dtd. 11.09.2025][2025_PWD_114585_1]
|
PWD |
572 |
11-Sep-2025 06:45 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 11:30 AM |
[Restoration of rain damages of various WSS under Section Janjehli JSV Sub-Division Thunag]
[4855-80 DT 11/09/2025][2025_HPIPH_114583_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP||Sarkaghat,Irrigation and Public Health,HP |
573 |
11-Sep-2025 06:30 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[LWSS Chakloo in GP Chakloo in Tehsil and Distt Chamba HP ]
[EE-JSD-TSA-EA-I-2025- 2107-56 dated- 11-09-2025][2025_HPIPH_114581_1]
|
HP Irrigation and Public Health||Chamba Circle,Irrigation and Public Health,HP |
574 |
11-Sep-2025 06:00 PM |
17-Sep-2025 09:00 AM |
17-Sep-2025 10:00 AM |
[SR to various non-residential buildings under Division No.I Shimla. (SH- Repair of roof, repair of polyhouse and other miscellaneous repair work in Council Chamber at Vidhan Sabha)]
[SD-III-10300-16dt.10-09-2025][2025_PWD_114571_3]
|
PWD |
575 |
11-Sep-2025 06:00 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[RR Damage of Raw Dhartewali in GP Khagna Tehsil Chopal Distt Shimla]
[JSV-ND-CB-Ten/2025/4297-4347][2025_HPIPH_114566_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
576 |
11-Sep-2025 06:00 PM |
17-Sep-2025 09:00 AM |
17-Sep-2025 10:00 AM |
[S/R to set No. 1 and 3 Type-IV at Kamla Nehru Hospital Shimla (Sh - P/F cup board work, flooring, painting and distempering work etc.]
[SD-III-10300-16dt.10-09-2025][2025_PWD_114571_1]
|
PWD |
577 |
11-Sep-2025 06:00 PM |
17-Sep-2025 10:00 AM |
17-Sep-2025 02:30 PM |
[ Hiring of 1 No. Hydraulic excavator JCB for Divsersion of Khad towards the non-damaged portion of trech weir at intake , removal of Silt,debris from Power channel of Lingti Power house under CMD,Bhabanagar.]
[HPSEBL/CMD/WK -24/2025-28][2025_HPSEB_114577_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Bhaba Nagar||Sr. Xen CMD Bhaba |
578 |
11-Sep-2025 06:00 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[Operation Running and Maintance of Sub Divisional Water Sample Testing Labortory at Division Nerwa Tehsil Nerwa Distt. Shimla ]
[JSV-ND-CB-Ten/2025/4297-4347][2025_HPIPH_114559_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
579 |
11-Sep-2025 06:00 PM |
17-Sep-2025 09:00 AM |
17-Sep-2025 10:00 AM |
[Repair/renovation to various residential buildings under division No.II, Shmla. (SH Covering of verandah, repair of cupboard, WS bath, painting, distempering g and polishing WS and SI installation in Forest Colony Khalini Set No. 2 ]
[SD-III-10300-16dt.10-09-2025][2025_PWD_114571_2]
|
PWD |
580 |
11-Sep-2025 06:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Providing WSS to newly constructed PHC Bhagheigarh in GP Bhagheigarh in Tehsil Churah Distt Chamba HP ]
[EE-JSD-TSA-EA-I-2025- 2107-56 dated- 11-09-2025][2025_HPIPH_114556_1]
|
HP Irrigation and Public Health||Chamba Circle,Irrigation and Public Health,HP |
581 |
11-Sep-2025 06:00 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[R R of GWSS Nerwa CKiar in GP Nerwa Tehsil Nerwa Distt. Shimla H.P ]
[JSV-ND-CB-Ten/2025/4297-4347][2025_HPIPH_114540_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
582 |
11-Sep-2025 06:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[RM of LWSS Banasar SandhogLWSS Miyun Sanog LWSS Gai Ghat LWSS Seoth KamlogTehsil kasauli District Solan HP Sub Head Providing Skilled/Unskilled labour for six months ]
[JSV-EE-DMP-CB-TA-NIT/2025- 9217-9316 dated 11.09.2025][2025_HPIPH_114462_1]
|
HP Irrigation and Public Health||Solan Circle Jal Shakti||Dharampur Jal Shakti Division |
583 |
11-Sep-2025 06:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[RM of LWSS Madhiyana in GP Nahri Tehsil Kasauli District Solan Sub Head Providing Skilled unskilled labour for 6 months job ]
[JSV-EE-DMP-CB-TA-NIT/2025- 9217-9316 dated 11.09.2025][2025_HPIPH_114459_1]
|
HP Irrigation and Public Health||Solan Circle Jal Shakti||Dharampur Jal Shakti Division |
584 |
11-Sep-2025 05:05 PM |
17-Sep-2025 04:00 PM |
18-Sep-2025 11:00 AM |
[E28-25-26]
[E28-25-26][2025_HPSEB_114564_1]
|
HPSEBL||CE(OP) South||SE(OP) Solan |
585 |
11-Sep-2025 05:00 PM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:00 AM |
[Construction of link road Neri Ukhroo km. 0/000 to 3/800]
[NIT No.3858-64 Dated 01.09.2025][2025_PWD_114547_1]
|
PWD |
586 |
11-Sep-2025 05:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[Outsourcing the services of Sub Divisional Water testing Laboratory at Manoh under Jal Shakti Division Bhoranj under Water quality surveillance ]
[ 7358-7418 dated 11-09-2025][2025_HPIPH_114553_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP |
587 |
11-Sep-2025 05:00 PM |
17-Sep-2025 04:00 PM |
18-Sep-2025 11:00 AM |
[E27-25-26]
[E27-25-26][2025_HPSEB_114558_1]
|
HPSEBL||CE(OP) South||SE(OP) Solan |
588 |
11-Sep-2025 05:00 PM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:30 AM |
[Construction of Govt. Senior Secondary School Building Loharghat]
[NIT No.3858-64 Dated 01.09.2025][2025_PWD_114557_1]
|
PWD |
589 |
11-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Installation of colored globules]
[HPPTCL/Bhaba/E-09/2025-26/003][2025_HPPTC_114544_1]
|
HP Power Transmission Corporation limited||Projects||DGM (Shimla)||PIU Bhabhanagar |
590 |
11-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Mahila Mandal Bhawan Trehal in Tehsil Baijnath District Kangra HP Deposit Work ]
[7232-82 dated 11-09-2025][2025_HPIPH_114512_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Nagrota Bagwan |
591 |
11-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Restoration of rain Damages to FIS Rainki Kuhl in Tehsil Baijnath District Kangra HP ]
[7232-82 dated 11-09-2025][2025_HPIPH_114517_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Nagrota Bagwan |
592 |
11-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[Repair of Division and Sub Division office Building Division Fatehpur Tehsil Fatehpur Distt. Kangra H.P. (SH-Painting work, wooden work, bush cutting and other repair in Division and Sub Division office building.]
[NIT NO. 4819-58 dated 11-09-2025][2025_HPIPH_114534_1]
|
HP Irrigation and Public Health||Nurpur Circle,Irrigation and Public Health,HP||Fatehpur-Irrigation and Public Health-HP |
593 |
11-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
20-Sep-2025 03:00 PM |
[O and M of Giri Power House]
[REGPHD/SP-23/2025-26-02][2025_HPSEB_114494_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Nahan||RE Girinagar |
594 |
11-Sep-2025 05:00 PM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[Upgradation of water Testing Laboratory Kaza as NABL standards (Micro-biological standard) under JSV Division Kaza in Spiti valley Distt Lahaul Spiti]
[KZA-KZA00-712][2025_HPIPH_114490_1]
|
HP Irrigation and Public Health||Rekongpeo Circle,Irrigation and Public Health,HP||Kaza,Irrigation and Public Health,HP |
595 |
11-Sep-2025 05:00 PM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Shimla Kunihar Ramsher Nalagarh road km. 38/600 to 60/500]
[NIT No.3858-64 Dated 01.09.2025][2025_PWD_114538_1]
|
PWD |
596 |
11-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Restoration of Rain Damages of LWSS Upper Lambagaon in Tehsil Jaisinghpur Distt. Kangra HP ]
[8261-8346 dated 10.09.2025][2025_HPIPH_114503_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||JSV Jaisinghpur |
597 |
11-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:30 AM |
[CO completion the Balance work of Indoor Badminton Hall at Bahri Tehsil Dharampur Distt Mandi HP VKV 2025 816 ]
[5610-60 dt. 11.09.2025][2025_HPIPH_114504_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP||Sarkaghat,Irrigation and Public Health,HP |
598 |
11-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[Providing and installation of 2 No. 125 mm dia bore along with energisation JSV Sub Division Fatehpur under Barot Section in Tehsil Fatehpur Distt. Kangra H.P. (SH-Providing and Installation of 2 No. 125 mm dia bore with allied accessories.]
[NIT NO. 4819-58 dated 11-09-2025][2025_HPIPH_114520_1]
|
HP Irrigation and Public Health||Nurpur Circle,Irrigation and Public Health,HP||Fatehpur-Irrigation and Public Health-HP |
599 |
11-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[Restoration of Rain Damage LWSS Gurial in Tehsil Fatehpur Distt. Kangra H.P. (SH-Dismantling and Relaying of G.I. Pipe 150 mm dia and NRV Making connection.]
[NIT NO. 4819-58 dated 11-09-2025][2025_HPIPH_114502_1]
|
HP Irrigation and Public Health||Nurpur Circle,Irrigation and Public Health,HP||Fatehpur-Irrigation and Public Health-HP |
600 |
11-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Restoration of rain Damages to FIS Rainki Kuhl in Tehsil Baijnath District Kangra HP ]
[7232-82 dated 11-09-2025][2025_HPIPH_114525_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Nagrota Bagwan |
601 |
11-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Mahila Mandal Bhawan Marh Ward No 4 in Tehsil Baijnath District Kangra HP Deposit Work ]
[7232-82 dated 11-09-2025][2025_HPIPH_114507_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Nagrota Bagwan |
602 |
11-Sep-2025 05:00 PM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[Water Quality Monitoring and Surveillance (SH Providing and fixing Aluminium Chanel for door and partition for Up gradation of Microbiology Lab for NABL Accreditation under Jal Shakti Vibhag Division Chamba)]
[JSV-CBA-GA-2025-4371-4426 dated 11.09.2025][2025_HPIPH_114456_1]
|
HP Irrigation and Public Health||Chamba Circle,Irrigation and Public Health,HP||Chamba,Irrigation and Public Health,HP |
603 |
11-Sep-2025 04:35 PM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[C/O Tapping additiona source to Deori Manyashi (Phase Jilli Nahi) in tehsil Sainj Distt Kullu H.P. ]
[NIT No. 6888-6987 dt. 10.09.2025][2025_HPIPH_114545_2]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
604 |
11-Sep-2025 04:30 PM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Restoration of Rain Damages to WSS to WSS Makrar in GP Hurla tehsil Bhunter Distt Kullu H.P. ]
[NIT No. 6888-6987 dt. 10.09.2025][2025_HPIPH_114545_1]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Kullu -2,Irrigation and Public Health,HP |
605 |
11-Sep-2025 04:00 PM |
19-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
[R.R.D. on Talhyar Pingla Thona Sarkaghat road Km 11/0 to 22/645 ]
[PW-NCD-EA-I-E-Tender /Publication/ 2025-4414-24 dt. 08.09.2025][2025_PWD_114479_4]
|
PWD |
606 |
11-Sep-2025 04:00 PM |
19-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
[R.R.D. on Talhyar Pingla Thona Sarkaghat road Km 11/0 to 22/645 ]
[PW-NCD-EA-I-E-Tender /Publication/ 2025-4414-24 dt. 08.09.2025][2025_PWD_114479_7]
|
PWD |
607 |
11-Sep-2025 04:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Ratti Meramasit Leda road KM 0/0 to 14/580 (SH C/o PCC B/wall in wire crate in between at RD 7/975 to 8/0) under PDNA-2023]
[PW-NCD-EA-I-E-Tender /Publication/ 2025-4414-24 dt. 08.09.2025][2025_PWD_114479_8]
|
PWD |
608 |
11-Sep-2025 04:00 PM |
19-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Mahotla Karehari road Km 0/0 to 2/0 (SH C/o PCC R/wall at RD 0/650 to 0/670) under PDNA-2023 ]
[PW-NCD-EA-I-E-Tender /Publication/ 2025-4414-24 dt. 08.09.2025][2025_PWD_114479_5]
|
PWD |
609 |
11-Sep-2025 04:00 PM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on link road from Kararagully to Barshnoo road km. 0/0 to 6/600]
[NIT No.3858-64 Dated 01.09.2025][2025_PWD_114519_1]
|
PWD |
610 |
11-Sep-2025 04:00 PM |
19-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
[Restoration of rain Damages on Ratti Meramasit Leda road KM 0/0 to 14/580.]
[PW-NCD-EA-I-E-Tender /Publication/ 2025-4414-24 dt. 08.09.2025][2025_PWD_114479_2]
|
PWD |
611 |
11-Sep-2025 04:00 PM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Darla Piplughat road km. 0/000 to 6/150]
[NIT No.3858-64 Dated 01.09.2025][2025_PWD_114531_1]
|
PWD |
612 |
11-Sep-2025 04:00 PM |
19-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
[RRD on Talhyar Pingla Thona Sarkaghat road Km 11/0 to 22/645.]
[PW-NCD-EA-I-E-Tender /Publication/ 2025-4414-24 dt. 08.09.2025][2025_PWD_114479_1]
|
PWD |
613 |
11-Sep-2025 04:00 PM |
19-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Galma Majhyali road Km 0/0 to 9/0]
[PW-NCD-EA-I-E-Tender /Publication/ 2025-4414-24 dt. 08.09.2025][2025_PWD_114479_3]
|
PWD |
614 |
11-Sep-2025 04:00 PM |
19-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Sidhyani Khetri road KM 0/0 to 5/200 (SH- Providing and laying G-III and repair of pot holes between KM 0/0 to 5/200) under PDNA-2023]
[PW-NCD-EA-I-E-Tender /Publication/ 2025-4414-24 dt. 08.09.2025][2025_PWD_114479_6]
|
PWD |
615 |
11-Sep-2025 04:00 PM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Mangoo Bambira Katal Malawan road km. 0/0 to 12/0]
[NIT No.3858-64 Dated 01.09.2025][2025_PWD_114509_1]
|
PWD |
616 |
11-Sep-2025 04:00 PM |
18-Sep-2025 03:30 PM |
18-Sep-2025 04:00 PM |
[Providing and fixing paneling and other repair works in Manager (Civil) and PA to CGM, RTDC US Club Shimla]
[RTDC/Office Repair/2223 dt 10/09/2025][2025_RTDCH_114521_1]
|
Ropeway and Rapid Transport System Development Corporation |
617 |
11-Sep-2025 04:00 PM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on link road from Kararagully to Barshnoo road km. 0/0 to 6/600]
[NIT No.3858-64 Dated 01.09.2025][2025_PWD_114526_1]
|
PWD |
618 |
11-Sep-2025 04:00 PM |
19-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Sidhyani Khetri road KM 0/0 to 5/200 (SH C/o PCC R/wall at RD 0/980 to 0/990) under PDNA-2023.]
[PW-NCD-EA-I-E-Tender /Publication/ 2025-4414-24 dt. 08.09.2025][2025_PWD_114479_9]
|
PWD |
619 |
11-Sep-2025 04:00 PM |
19-Sep-2025 10:00 AM |
19-Sep-2025 11:00 AM |
[R.R.D. on Talhyar Pingla Thona Sarkaghat road Km 11/0 to 22/645 ]
[PW-NCD-EA-I-E-Tender /Publication/ 2025-4414-24 dt. 08.09.2025][2025_PWD_114479_10]
|
PWD |
620 |
11-Sep-2025 03:00 PM |
17-Sep-2025 04:00 PM |
18-Sep-2025 11:00 AM |
[BID NO-UED/96/2025-26]
[BID NO- UED/96/2025-26][2025_HPSEB_113777_2]
|
HPSEBL||CE (OP) North||SE (OP) Una||Sr. Xen Una |
621 |
11-Sep-2025 03:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[Restoration of rain damage to LWSS Patna Nallah in GP Tikker Bhula in Tehsil Bhoranj ]
[ 7222-7282 dated 11-09-2025][2025_HPIPH_114470_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP |
622 |
11-Sep-2025 03:00 PM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:30 AM |
[Additional alteration of Health Sub-Centre building Panjpiplu Tehsil Arki, Distt. Solan]
[NIT No.3858-64 Dated 01.09.2025][2025_PWD_114487_1]
|
PWD |
623 |
11-Sep-2025 03:00 PM |
23-Sep-2025 05:00 PM |
24-Sep-2025 11:00 AM |
[Restoration of rain damage to LWSS Aman II in GP Dimmi in Tehsil Bhoranj Distt Hamipur HP ]
[ 7289-7349 dated 11-09-2025][2025_HPIPH_114491_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP |
624 |
11-Sep-2025 03:00 PM |
18-Sep-2025 11:30 AM |
18-Sep-2025 02:30 PM |
[CEKZ-SI-23-2025-26 ]
[CEKZ-SI-23-2025-26][2025_HPSEB_114049_2]
|
HPSEBL||CE (OP) North |
625 |
11-Sep-2025 02:10 PM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:30 AM |
[R/R of rain damages on Patta Goela Chhachi road km 0/00 to 20/00 ]
[8365-75 dated 05.09.2025][2025_PWD_114498_1]
|
PWD |
626 |
11-Sep-2025 02:05 PM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Kath Ka Pul Dawn Ka ghat via Chandrayni road in kms 0/00 to 4/00, Patta Beja Masulkhana road in km 0/00 to 9/500, Brotiwala Mandhala Gunai road in km 16/900 to 26/130]
[8365-75 dated 05.09.2025][2025_PWD_114495_1]
|
PWD |
627 |
11-Sep-2025 02:00 PM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of Rain damages on link road from Jabloo Sera Samana Thera road km. 0/000 to 7/500]
[NIT No.3858-64 Dated 01.09.2025][2025_PWD_114474_1]
|
PWD |
628 |
11-Sep-2025 02:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Construction of Foot Bridge 6m Steel Truss Bridge and RCC Culvert at Samalang Nalah in GP Dunkhrigarh under APO SHAMSHI for the year 2025-26]
[Job No 30/Foot Bridge/SMS][2025_CPD1_114483_1]
|
Chief Project Director IDP Solan||DPO Kullu |
629 |
11-Sep-2025 02:00 PM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:30 AM |
[R/R damages to Chhaila Neripul Yashwant Nagar Kumarhatti road in km 75/375 to 86/450 ]
[8365-75 dated 05.09.2025][2025_PWD_114486_1]
|
PWD |
630 |
11-Sep-2025 02:00 PM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Sukki Johari Kanda Katal ka Bag road in kms 0/00 to 15/585 ]
[8365-75 dated 05.09.2025][2025_PWD_114489_1]
|
PWD |
631 |
11-Sep-2025 02:00 PM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Shaktight to Bandh road in km 0/00 to 12/00 ]
[8365-75 dated 05.09.2025][2025_PWD_114493_1]
|
PWD |
632 |
11-Sep-2025 02:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Construction of Foot Bridge 8m Steel Truss Bridge at Samalang nalah in GP Mangarh under APO Shamshi for the year 2025-26]
[Job No 31/Foot Bridge/SMS/Mangrah][2025_CPD1_114492_1]
|
Chief Project Director IDP Solan||DPO Kullu |
633 |
11-Sep-2025 02:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Ar and MO Pre-Treatment System to Dr.RPGMC Tanda ]
[EE_NBD_2025_9351-9400 dt.10.9.25][2025_HPIPH_114457_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Nagrota Bagwan |
634 |
11-Sep-2025 01:30 PM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:30 AM |
[R/R damages to Chhaila Neripul Yashwant Nagar Kumarhatti road in km 75/375 to 86/450 ]
[8365-75 dated 05.09.2025][2025_PWD_114482_1]
|
PWD |
635 |
11-Sep-2025 01:15 PM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Sukki Johari Kanda Katal ka Bag road in kms 0/00 to 15/585 ]
[8365-75 dated 05.09.2025][2025_PWD_114480_1]
|
PWD |
636 |
11-Sep-2025 01:10 PM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Bhoj Nagar Neri Kalan road in Km 0/00 to 9/500 ]
[8365-75 dated 05.09.2025][2025_PWD_114477_1]
|
PWD |
637 |
11-Sep-2025 01:05 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Construction of Fire Hydrant at Shakash Nallah in GP Keylong, District LahaulSpiti HP ]
[8315-8365 dated 11.09.2025][2025_HPIPH_114473_1]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Keylong,Irrigation and Public Health,HP |
638 |
11-Sep-2025 01:00 PM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Parwanoo Kasauli Dharampur Subathu Solan road in Km 0/00 to 58/320 ]
[8365-75 dated 05.09.2025][2025_PWD_114469_1]
|
PWD |
639 |
11-Sep-2025 01:00 PM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Paoghatti Seri Sangli road km. 0/0 to 6/0 ]
[NIT No.3858-64 Dated 01.09.2025][2025_PWD_114450_1]
|
PWD |
640 |
11-Sep-2025 01:00 PM |
18-Sep-2025 10:30 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Garkhal to Gahi road in kms 0/00 to 6/300 ]
[8365-75 dated 05.09.2025][2025_PWD_114472_1]
|
PWD |
641 |
11-Sep-2025 12:55 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[C/O Kanyon Shirla Anji road Km 0/0 to 6/480 (SH- C/O 900 mm dia Hume Pipe culvert alongwith wall at Rd 4/970, 5/180) ]
[PW/SRN/CB/Tender/-3409-3459dt 09-09-2025][2025_PWD_114455_10]
|
PWD |
642 |
11-Sep-2025 12:50 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Dhungaghat Kila Klanch road Km 0/0 to 22/0 (SH- C/O 900 mm dia Hume Pipe culvert alongwith wing Wall at RD 8/120 , 12/795) ]
[PW/SRN/CB/Tender/-3409-3459dt 09-09-2025][2025_PWD_114455_3]
|
PWD |
643 |
11-Sep-2025 12:50 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Dinger Kinner Bhagyanghat road Km 0/0 to 9/330 (SH- C/O 900 mm dia Hume pipe culvert alongwith wing wall at RD 4/030 , C/o PCC R/wall at RD 1/990 to 2/005)]
[PW/SRN/CB/Tender/-3409-3459dt 09-09-2025][2025_PWD_114455_7]
|
PWD |
644 |
11-Sep-2025 12:50 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Dhungaghat Kila Klanch road Km 0/0 to 22/0 (SH- C/O 900 mm dia Hume Pipe culvert alongwith wing Wall at RD 15/140 15/725) ]
[PW/SRN/CB/Tender/-3409-3459dt 09-09-2025][2025_PWD_114455_2]
|
PWD |
645 |
11-Sep-2025 12:50 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Dhungaghat Kila Klanch road Km 0/0 to 22/0 (SH- C/O 900 mm dia Hume Pipe culvert alongwith wing Wall at RD 14/120 14/570) ]
[PW/SRN/CB/Tender/-3409-3459dt 09-09-2025][2025_PWD_114455_1]
|
PWD |
646 |
11-Sep-2025 12:50 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Dhungaghat Kila Klanch road Km 0/0 to 22/0 (SH- C/O 900 mm dia Hume Pipe culvert alongwith wing Wall at RD 17/495 , 17/810) ]
[PW/SRN/CB/Tender/-3409-3459dt 09-09-2025][2025_PWD_114455_5]
|
PWD |
647 |
11-Sep-2025 12:50 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Prem Nagar Chandog road Km 0/0 to 15/0 (SH- C/O PCC E/wall at Rd 0/700 to 0/719) ]
[PW/SRN/CB/Tender/-3409-3459dt 09-09-2025][2025_PWD_114455_4]
|
PWD |
648 |
11-Sep-2025 12:50 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Mari Ka Ghat Kerry Shutiya road km 0/0 to 23/00 (SH- C/O Slab culvert at Rd 19/660) ]
[PW/SRN/CB/Tender/-3409-3459dt 09-09-2025][2025_PWD_114455_6]
|
PWD |
649 |
11-Sep-2025 12:50 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Sikken Dinger Kinner Bhagyanghat road Km 0/0 to 9/0 (SH- C/O PCC R/wall at RD 4/750 to 4/765 and 6/240 to 6/265) ]
[PW/SRN/CB/Tender/-3409-3459dt 09-09-2025][2025_PWD_114455_8]
|
PWD |
650 |
11-Sep-2025 12:50 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[R/R damages on Mari Ka Ghat Kerry Shutiya road km 0/0 to 23/00 (SH- C/O Slab culvert at RD 18/370) ]
[PW/SRN/CB/Tender/-3409-3459dt 09-09-2025][2025_PWD_114455_9]
|
PWD |
651 |
11-Sep-2025 12:00 PM |
20-Sep-2025 03:00 PM |
22-Sep-2025 11:00 AM |
[Lifting, Transportation, Processing and Disposal of Unprocessed Municipal Solid Waste of MC Kullu from Dumping Site at MRF Sarwari, near Bus Stand, Kullu. (500MT Approx)]
[MCK/SI/SWM(RDF)2025/1196-1200][2025_UDDHP_114448_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Kullu - UDDHP |
652 |
11-Sep-2025 11:30 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Hiring of JCB for the removal of slips]
[Restoration of rain damages on various roads under HPPWD sub Division Babeli 8][2025_PWD_114343_1]
|
PWD |
653 |
11-Sep-2025 11:30 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Hiring of JCB for the removal of slips]
[Restoration of rain damages on various roads under HPPWD sub Division Babeli 9][2025_PWD_114347_1]
|
PWD |
654 |
11-Sep-2025 11:30 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Hiring of JCB for the removal of slips]
[Restoration of rain damages on various roads under HPPWD sub Division Babeli 10][2025_PWD_114348_1]
|
PWD |
655 |
11-Sep-2025 11:30 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Hiring of JCB for the removal of slips]
[Restoration of rain damages on various roads under HPPWD sub Division Katrain 5][2025_PWD_114334_1]
|
PWD |
656 |
11-Sep-2025 11:30 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Hiring of JCB for the removal of slips]
[Restoration of rain damages on various roads under HPPWD sub Division Katrain 4][2025_PWD_114331_1]
|
PWD |
657 |
11-Sep-2025 11:30 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Hiring of JCB for the removal of slips]
[Restoration of rain damages on various roads under HPPWD sub Division Katrain 6][2025_PWD_114339_1]
|
PWD |
658 |
11-Sep-2025 11:30 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Hiring of JCB for the removal of slips]
[Restoration of rain damages on various roads under HPPWD sub Division Katrain 7][2025_PWD_114341_1]
|
PWD |
659 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:30 PM |
[NED-113/2025-26]
[NED-113/2025-26][2025_HPSEB_114426_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr.Xen (E) Nahan |
660 |
11-Sep-2025 11:00 AM |
01-Oct-2025 05:00 PM |
08-Oct-2025 11:00 AM |
[purchasing of sports materials spors kits and other articles for the year 2025-26]
[Purchasing of sports materials sports kits and other articles for the year 2025-26][2025_HPU_114440_1]
|
Himachal Pradesh University |
661 |
11-Sep-2025 11:00 AM |
19-Sep-2025 03:00 PM |
20-Sep-2025 11:00 AM |
[Hiring 08 Tractor with trolley (with Driver) for the collection of Garbage during international Kullu Dussehra Festival 2025.]
[MCK/SI/Dussehra 2025/1206-10][2025_UDDHP_114442_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Kullu - UDDHP |
662 |
11-Sep-2025 11:00 AM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Thaltukhod Marh road Km 0/00 to 5/00. (PDNA-2023) ]
[PW-MDI(P)Tender-NIT-7825-55 dated 09.09.2025][2025_PWD_114441_1]
|
PWD |
663 |
11-Sep-2025 11:00 AM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Thaltukhod Graman road Km 0/00 to 5/00. (PDNA-2023) ]
[PW-MDI(P)Tender-NIT-7825-55 dated 09.09.2025][2025_PWD_114439_1]
|
PWD |
664 |
11-Sep-2025 11:00 AM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Silhbudhani Sudhar road Km 0/00 to 5/00. (PDNA-2023) ]
[PW-MDI(P)Tender-NIT-7825-55 dated 09.09.2025][2025_PWD_114435_1]
|
PWD |
665 |
11-Sep-2025 11:00 AM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Ghatasani Jhatingri Tikkan Barot road Km 0/00 to 25/00. (PDNA-2023) ]
[PW-MDI(P)Tender-NIT-7825-55 dated 09.09.2025][2025_PWD_114434_1]
|
PWD |
666 |
11-Sep-2025 11:00 AM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Ghatasani Jhatingri Tikkan Barot road Km 0/00 to 25/00. (PDNA-2023)]
[PW-MDI(P)Tender-NIT-7825-55 dated 09.09.2025][2025_PWD_114432_1]
|
PWD |
667 |
11-Sep-2025 11:00 AM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Ghatasani Jhatingri Tikkan Barot road Km 0/00 to 25/00. (PDNA-2023) ]
[PW-MDI(P)Tender-NIT-7825-55 dated 09.09.2025][2025_PWD_114431_1]
|
PWD |
668 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:30 PM |
[NED-116/2025-26]
[NED-116/2025-26][2025_HPSEB_114429_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr.Xen (E) Nahan |
669 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:30 PM |
[NED-115/2025-26]
[NED-115/2025-26][2025_HPSEB_114428_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr.Xen (E) Nahan |
670 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:30 PM |
[NED-114/2025-26]
[NED-114/2025-26][2025_HPSEB_114427_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr.Xen (E) Nahan |
671 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:30 PM |
[NED-112/2025-26]
[NED-112/2025-26][2025_HPSEB_114422_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr.Xen (E) Nahan |
672 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:30 PM |
[NED-111/2025-26]
[NED-111/2025-26][2025_HPSEB_114421_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr.Xen (E) Nahan |
673 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:30 PM |
[NED-110/2025-26]
[NED-110/2025-26][2025_HPSEB_114418_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr.Xen (E) Nahan |
674 |
11-Sep-2025 11:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[Construction of cement road from Dehri College to SC Talaab 300.00mtr plus pucca drains Drain length approx. 1000.00mtr in Kutkana village G.P. Kher Under MMSY]
[4745-60 Dated 5/09/2025][2025_PWD_114317_6]
|
PWD |
675 |
11-Sep-2025 11:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[Construction of path and causeway on road from Bhati Dangwalian to Bheli Nootran on G.P. Nangal km. 0.0 to 1.250 Under MMSY SH Construction of solid causeway on Badukhar khad near Bhati Nootran]
[4745-60 Dated 5/09/2025][2025_PWD_114317_5]
|
PWD |
676 |
11-Sep-2025 11:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[Construction of cemented path from Bashir Mohammad house to High School in Ward No.2 G.P. Manoh Sihal Under MMSY SH Providing and laying cement concrete pavement at R.D. 0.00 to 0.350]
[4745-60 Dated 5/09/2025][2025_PWD_114317_4]
|
PWD |
677 |
11-Sep-2025 11:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[Construction of cement road Chhatral road to village Badaal Ward No.2 G.P. Luthial km. 0.0 to 1.150 Under MMSY ]
[4745-60 Dated 5/09/2025][2025_PWD_114317_3]
|
PWD |
678 |
11-Sep-2025 11:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[Construction of cement road from village Bohal to Naala Ward No.2 G.P.Thehar Under MMSY SH Construction of cement concrete pavement at R.D. 0.0 to 0.110]
[4745-60 Dated 5/09/2025][2025_PWD_114317_2]
|
PWD |
679 |
11-Sep-2025 11:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[Construction of cement road Dial link road to Village Bagroli Ward No.5 G.P. Nagaal Under MMSY SH Construction of edge wall and cement concrete pavement in length 168.00mtr.]
[4745-60 Dated 5/09/2025][2025_PWD_114317_1]
|
PWD |
680 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:00 PM |
[101/2025-26]
[101/2025-26][2025_HPSEB_114380_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr. Xen (E) Rajgarh |
681 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:30 PM |
[NED-109/2025-26]
[NED-109/2025-26][2025_HPSEB_114415_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr.Xen (E) Nahan |
682 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:30 PM |
[NED-108/2025-26]
[NED-108/2025-26][2025_HPSEB_114410_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr.Xen (E) Nahan |
683 |
11-Sep-2025 11:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[Construction of cemented road including culverts and retaining walls Jassur Pong Dam road to Ashwani Choudhary s House in Village Kutlahar G.P. Talara Under MMSY ]
[4745-60 Dated 5/09/2025][2025_PWD_114317_9]
|
PWD |
684 |
11-Sep-2025 11:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[Construction of cement road Thangar temple to Dahab road including construction of Retaining walls and Drains in G.P. Dak Under MMSY ]
[4745-60 Dated 5/09/2025][2025_PWD_114317_8]
|
PWD |
685 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:00 PM |
[100/2025-26]
[100/2025-26][2025_HPSEB_114376_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr. Xen (E) Rajgarh |
686 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:00 PM |
[99/2025-26]
[99/2025-26][2025_HPSEB_114373_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr. Xen (E) Rajgarh |
687 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:00 PM |
[98/2025-26]
[98/2025-26][2025_HPSEB_114368_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr. Xen (E) Rajgarh |
688 |
11-Sep-2025 11:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[Construction of cement path Handpump se Lekar Vinod Kumar, Tula Ram etc. ke ghar tak Ward No.1 Village Darati G.P. Tatwali Under MMSY]
[4745-60 Dated 5/09/2025][2025_PWD_114317_10]
|
PWD |
689 |
11-Sep-2025 11:00 AM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[Construction of cement path from Ramandand ke khet se lekar Rikhi Ram, Harbans ke khet tak Ward No.8 Village Baroh G.P. Larth Bari Under MMSY SH Providing and laying cement concrete pavement at R.D. 0.420 to 0.718.50 ]
[4745-60 Dated 5/09/2025][2025_PWD_114317_7]
|
PWD |
690 |
11-Sep-2025 11:00 AM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:00 PM |
[102/2025-26]
[102/2025-26][2025_HPSEB_114384_1]
|
HPSEBL||CE(OP) South||SE(OP) Nahan||Sr. Xen (E) Rajgarh |
691 |
11-Sep-2025 10:50 AM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:30 AM |
[Construction of 1st floor of Community Bhawan at Batal ]
[NIT No.3858-64 Dated 01.09.2025][2025_PWD_114436_1]
|
PWD |
692 |
11-Sep-2025 10:30 AM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:30 AM |
[Construction of Shinthighat to Nanihas road km. 0/0 to 2/075 ]
[NIT No.3858-64 Dated 01.09.2025][2025_PWD_114367_1]
|
PWD |
693 |
11-Sep-2025 10:30 AM |
17-Sep-2025 06:00 PM |
18-Sep-2025 11:30 AM |
[Construction of link road from Piplughat to village Pathed,Vill Kyari,Village Sokhar, Delag to Shivghatti,Bhindi to Jabalu, Bhawana to Devdhar,Skore ,Ashlu Mainthi, Navi Karyah, Loharghat Malawan ]
[NIT No.3858-64 Dated 01.09.2025][2025_PWD_114396_1]
|
PWD |
694 |
11-Sep-2025 10:00 AM |
17-Sep-2025 10:00 AM |
17-Sep-2025 11:30 AM |
[Restoration of rain damages on Shegali Prasher road Km in 0/00 to 22/510.]
[PW-MDI(P)Tender-NIT-7769-7804 dt. 09.09.2025][2025_PWD_114407_1]
|
PWD |
695 |
11-Sep-2025 10:00 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of Rain Damages on Sapralu Tihri Road Km 0/00 to 10/00]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025 and corrigendum NO 4008-11 dated 08 09.2025][2025_PWD_114352_1]
|
PWD |
696 |
11-Sep-2025 10:00 AM |
18-Sep-2025 10:00 AM |
18-Sep-2025 11:30 AM |
[Restoration of rain damages on Ghatasani Jhatingri Tikkan Barot road Km 0/00 to 25/00. (PDNA 2023) ]
[PW-MDI(P)Tender-NIT-7825-55 dated 09.09.2025][2025_PWD_114414_1]
|
PWD |
697 |
11-Sep-2025 10:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[Providing drinking water facility to H/Basti Balh Balwana from Lift Water Supply scheme Balh Balwana in Tehsil Sadar District Bilaspur (SH Construction of pump house, construction of main storage tank 94200 litr capacity and construction of sump well]
[BLP-BLP-0736-NIT No. 7590-7689 Dated 08/09/2025][2025_HPIPH_114244_1]
|
HP Irrigation and Public Health||Bilaspur Circle,Irrigation and Public Health,HP||Ghumarwin,Irrigation and Public Health,HP |
698 |
11-Sep-2025 10:00 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of Rain Damages on Baroh Chowk Dehrian Jandrah Tikka Lagru Dola Kharyana Khundian Nahllian Road Km 9/135 to 35/300 ]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025 and corrigendum NO 4008-11 dated 08 09.2025][2025_PWD_114248_1]
|
PWD |
699 |
11-Sep-2025 10:00 AM |
22-Sep-2025 02:00 PM |
23-Sep-2025 03:00 PM |
[DB-Tender-08]
[DB-Tender-08(SOP HIPA)/2025-26][2025_HPSEB_114372_1]
|
HPSEBL||CE(OP) South||SE(OP) Shimla |
700 |
11-Sep-2025 10:00 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of rain Damages on Link Road Lower Pihri to Dharetu Toru Km 0/000 to 2/000]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025 and corrigendum NO 4008-11 dated 08 09.2025][2025_PWD_114325_1]
|
PWD |
701 |
11-Sep-2025 10:00 AM |
23-Sep-2025 05:00 PM |
24-Sep-2025 12:30 PM |
[Job of sweeping and cleaning HPPTCL Dehan, Patti Sub Station]
[HPPTCL/PIU Chambi/2025-26/06][2025_HPPTC_114423_1]
|
HP Power Transmission Corporation limited||Projects||DGM (Kullu)||PIU Chambi |
702 |
11-Sep-2025 10:00 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of Rain Damages on Sihoti Pihri Road Km 0/000 to 8/000]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025 and corrigendum NO 4008-11 dated 08 09.2025][2025_PWD_114299_1]
|
PWD |
703 |
11-Sep-2025 10:00 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of Rain Damages on Link road Jukhari to Mahadev Km 0/00 to 3/00]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025 and corrigendum NO 4008-11 dated 08 09.2025][2025_PWD_114297_1]
|
PWD |
704 |
11-Sep-2025 10:00 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of Rain Damages on Link road Jukhari to Mahadev Km 0/00 to 3/00]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025 and corrigendum NO 4008-11 dated 08 09.2025][2025_PWD_114288_1]
|
PWD |
705 |
11-Sep-2025 10:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[Restoration of rain damages of LWSS Dalli in Tehsil Sadar District Bilaspur (SH Repair of gravity mains, rising main and distribution lines of various dia at various points).]
[BLP-BLP-0736-NIT No. 7590-7689 Dated 08/09/2025][2025_HPIPH_114275_1]
|
HP Irrigation and Public Health||Bilaspur Circle,Irrigation and Public Health,HP||Ghumarwin,Irrigation and Public Health,HP |
706 |
11-Sep-2025 10:00 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[- Restoration of Rain Damages on Sapralu Tihri Road Km 0/00 to 10/00.]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025 and corrigendum NO 4008-11 dated 08 09.2025][2025_PWD_114329_1]
|
PWD |
707 |
11-Sep-2025 10:00 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of Rain Damages on Baroh Chowk Dehrian Jandrah Talli Tikka Lagru Dola Kharyana Khundian Nahllian Road Km 9/135 to 35/300.]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025 and corrigendum NO 4008-11 dated 08 09.2025][2025_PWD_114278_1]
|
PWD |
708 |
11-Sep-2025 10:00 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[ Restoration of rain Damages on Dhatehar Mahrana Duhak Road Km 0/000 to 6/310.]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025 and corrigendum NO 4008-11 dated 08 09.2025][2025_PWD_114285_1]
|
PWD |
709 |
11-Sep-2025 10:00 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of rain Damages on Badoun Pipli road Km. 0/0 to 12/600 ]
[PW-JND-B and R-EA-I-NIT- 10537-86 dated 25/08/2025][2025_PWD_114165_1]
|
PWD |
710 |
11-Sep-2025 10:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[Improvement of Lift Irrigation Scheme Ladher and Matial in GP Pater in Tehsil Ghumarwin District Bilaspur (SH Laying jointing and testing of HDPE pipe of various dia for distribution system, construction of outlets and Hydrants).]
[BLP-BLP-0736-NIT No. 7590-7689 Dated 08/09/2025][2025_HPIPH_114260_1]
|
HP Irrigation and Public Health||Bilaspur Circle,Irrigation and Public Health,HP||Ghumarwin,Irrigation and Public Health,HP |
711 |
11-Sep-2025 10:00 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of Rain Damages on Sapralu to Tihri Road Km 0/000 to 10/000]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025 and corrigendum NO 4008-11 dated 08 09.2025][2025_PWD_114335_1]
|
PWD |
712 |
11-Sep-2025 10:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[A/R and M/O LIS Dhar Jerkh in Tehsil Sadar District Bilaspur (SH Rewinding and repair of 75 HP motor set NO.1 Kirloskar make and repairing of 75 HP starter set No.2)]
[BLP-BLP-0736-NIT No. 7590-7689 Dated 08/09/2025][2025_HPIPH_114264_1]
|
HP Irrigation and Public Health||Bilaspur Circle,Irrigation and Public Health,HP||Ghumarwin,Irrigation and Public Health,HP |
713 |
11-Sep-2025 10:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 11:30 AM |
[A/R and M/O LWSS / WSS under Sadar Ghumarwin and Jhandutta block in Tehsil Sadar from Kol dam Reservoi.t (SH Repair of centrifugal pump 240 HP, 4 stages M and P make at Sr. No.5 Sr. NO. 81219792/110/5).at Berri 1st stage)]
[BLP-BLP-0736-NIT No. 7590-7689 Dated 08/09/2025][2025_HPIPH_114269_1]
|
HP Irrigation and Public Health||Bilaspur Circle,Irrigation and Public Health,HP||Ghumarwin,Irrigation and Public Health,HP |
714 |
11-Sep-2025 10:00 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Restoration of rain Damages on Baroh Chowk Dehrian Jandrah Talli Tikka Lagru Dola Kharyana Khundian Nahllian Road Km 9/135 to 35/300.]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025 and corrigendum NO 4008-11 dated 08 09.2025][2025_PWD_114261_1]
|
PWD |
715 |
11-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 01:00 PM |
[Dismantling and removing of Unsafe, Dilapitated and Dangerous Buildings within MC Una Jurisdiction for a period of one year. ]
[MCU/e-tender/2025/1882 Dated 09/09/2025][2025_UDDHP_114430_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Corporation Una - UDDHP |
716 |
11-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Restoration of rain damages to WSS Chhaling in GP Tingret Distt.Lahaul Spiti HP]
[7985-8035 dated 09.09.225][2025_HPIPH_114369_1]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Keylong,Irrigation and Public Health,HP |
717 |
11-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Restoration of rain damages to WSS Udaipur Distt Lahaul Spiti HP]
[7934-7984 dated 09.09.2025][2025_HPIPH_114378_1]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Keylong,Irrigation and Public Health,HP |
718 |
11-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Providing winter water supply scheme for the habitation of GP Gondhla, Distt.Lahaul Spiti HP ]
[8138-8188 dated 10.09.2025][2025_HPIPH_114400_1]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Keylong,Irrigation and Public Health,HP |
719 |
11-Sep-2025 09:00 AM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Restoration of rain damages to WSS Bara Agar in GP Tindi Distt Lahaul Spiti HP]
[8036-8086 dated 09.09.2025][2025_HPIPH_114363_1]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Keylong,Irrigation and Public Health,HP |
720 |
11-Sep-2025 09:00 AM |
24-Sep-2025 03:00 PM |
26-Sep-2025 10:00 AM |
[EMD/SP12(Tender)/2025-26 -20]
[No.HPSEBL/EMD/SP-12/2025-26-20][2025_HPSEB_114227_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Bhaba Nagar||Sr. Xen EMD Bhaba |
721 |
10-Sep-2025 06:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 11:30 AM |
[Deposite Work C/O main storage tank 75000 ltrs, capacity in village Mehlog Tehsil Pacchad Distt. Sirmour ]
[3830-3930][2025_HPIPH_114399_1]
|
HP Irrigation and Public Health||Nahan Circle,Irrigation and Public Health,HP||Nahan,Irrigation and Public Health,HP |
722 |
10-Sep-2025 06:00 PM |
18-Sep-2025 06:55 PM |
19-Sep-2025 11:30 AM |
[Balance work for up-gradation of Shimla Mandi Road Via Tattapani (Portion Chail chowk to Baggi Km. 172/000 to 181/400) RIDF-XXVII, Distt. Mandi (H.P) (SH C/o R/walls, B/walls, Drain, Extension of slab Culvert, Parapets, Paver tiles, Rain Shelter and ]
[3916-23 dated 02-09-2025][2025_PWD_114405_1]
|
PWD |
723 |
10-Sep-2025 05:00 PM |
02-Oct-2025 05:00 PM |
03-Oct-2025 11:00 AM |
[Hiring of services of Mahindra Bolero Vehicle (1 no.) in BPMU HPCDP JICA ODA Solan on contract basis ]
[No. Agr.Sln.DPMU-JICA(G)Veh.(3) Ph-II/2023-24- 1250 ][2025_HPCDP_114394_1]
|
Himachal Pradesh Agriculture Development Society (JICA-ODA loan)||Project Director - HPCDP Project - JICA-ODA - Hamirpur||DPM-HPCDP - JICA-ODA - Solan |
724 |
10-Sep-2025 05:00 PM |
02-Oct-2025 05:00 PM |
03-Oct-2025 11:00 AM |
[Hiring of services of Mahindra Scorpio (1 no.) in DPMU HPCDP JICA ODA Solan on contract basis]
[No. Agr.Sln.DPMU-JICA(G)Veh.(3) Ph-II/2023-24- 1247 ][2025_HPCDP_114386_1]
|
Himachal Pradesh Agriculture Development Society (JICA-ODA loan)||Project Director - HPCDP Project - JICA-ODA - Hamirpur||DPM-HPCDP - JICA-ODA - Solan |
725 |
10-Sep-2025 05:00 PM |
26-Sep-2025 10:00 AM |
26-Sep-2025 11:30 AM |
[Renovation and upgradation of wash rooms of women recreation center and upgradation of external sewerage system upto M.C. sewer line including electrical work in HPU Shimla-5]
[Renovation and upgradation of wash rooms of women Recreation centre and upgradation of external sewe][2025_HPU_114387_1]
|
Himachal Pradesh University |
726 |
10-Sep-2025 05:00 PM |
17-Sep-2025 10:00 AM |
17-Sep-2025 11:10 AM |
[Renovation of Badminton Court and Roof Treatment of Common Room in Vishnu Boys Hostel at Dr YSP University of Horticulture and forestry nauni solan]
[ No.UHF/Const.-1/Partfile /2025/-1618dated 06.09.2025 ][2025_YSPU_114330_1]
|
Dr. Yashwant Singh Parmar University of Horticulture and Forestry||Estate Organisation - YSPU||Construction Division - YSPU||Executive Engineer (Const.) - YSPU |
727 |
10-Sep-2025 05:00 PM |
17-Sep-2025 10:00 AM |
17-Sep-2025 11:10 AM |
[Renovation Repair of wash room, paint, badminton court and path in Vasundhra and Nandini Girls Hostel at Dr YSP University of Horticulture and forestry Nauni Solan]
[No.UHF/Const.-1/Partfile /2025/-1618dated 06.09.2025 ][2025_YSPU_114340_1]
|
Dr. Yashwant Singh Parmar University of Horticulture and Forestry||Estate Organisation - YSPU||Construction Division - YSPU||Executive Engineer (Const.) - YSPU |
728 |
10-Sep-2025 05:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 11:30 AM |
[Providing lift irrigation scheme to Village Telker Bharial Sanahi Kalan and Sanahi Khurd from Kunah khad in Tehsil Nadaun Distt Hamirpur HP]
[JS-NDN-CB-Misc.Agr/2024-25/- ][2025_HPIPH_114389_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP||Hamirpur,Irrigation and Public Health,HP |
729 |
10-Sep-2025 05:00 PM |
26-Sep-2025 10:00 AM |
26-Sep-2025 11:30 AM |
[Renovation of upgradation of Existing class rooms of BBA and BCA by replacement of existing or damaged ceiling by providing cement fiber board pre-painted sheet lining replacement of door and window shutters i/c painting and white washing along with]
[Renovation of upgradation of Existing class rooms of BBA and BCA by replacement of existing or damag][2025_HPU_114395_1]
|
Himachal Pradesh University |
730 |
10-Sep-2025 05:00 PM |
19-Sep-2025 05:00 PM |
20-Sep-2025 10:00 AM |
[Construction of one no laboratory room toilet block and development of ground at BTC Govt Model Girls Sesnior Sec School Nurpur Block Nurpur Distt Kangra]
[HIMUDA/DD/CB/W-7/2022 4503-12][2025_HIMUD_114381_2]
|
Himachal Urban Development Authority||Supdt. Engineer (N),HIMUDA||Executive Engineer Division,Dharamsala,HIMUDA |
731 |
10-Sep-2025 05:00 PM |
18-Sep-2025 09:00 AM |
18-Sep-2025 01:00 PM |
[FED-41/2025-26]
[FED-41/2025-26][2025_HPSEB_113526_2]
|
HPSEBL||CE (OP) North||SE (OP) Dalhousie||Sr. Xen Fatehpur |
732 |
10-Sep-2025 05:00 PM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Construction of Kuhl to Village Phindpar GP Phindroo (SH Cutting in hard rock excavation Laying and jointing of HDPE pipe 160 mm dia at RD 0/0 to 0/120]
[EE-Killar-Tender-2025/ 2754-74 dated 9-9-2025][2025_HPIPH_114316_1]
|
HP Irrigation and Public Health||Chamba Circle,Irrigation and Public Health,HP |
733 |
10-Sep-2025 05:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 11:30 AM |
[Providing GWSS Pabodhar in GP Madhana Tehsil Nerwa Distt Shimla HP]
[JSV-ND-CB-Ten/2025/4218-67][2025_HPIPH_114336_1]
|
HP Irrigation and Public Health||Rohru Circle,Irrigation and Public Health,HP||Nerwa,Irrigation and Public Health,HP |
734 |
10-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[DB-Tender-No-30(Restoration of HT LT Line Section Theog)/2025-26.]
[DB-Tender-No-30(Restoration of HT LT Line Section Theog)/2025-26.][2025_HPSEB_114342_1]
|
HPSEBL||CE(OP) South||SE(OP) Shimla||Sr. Xen (E) Theog |
735 |
10-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[DB-Tender-No-32(Restoration of LT Lines Section Chailla Kuthar)/2025-26.]
[DB-Tender-No-32(Restoration of LT Lines Section Chailla Kuthar)/2025-26.][2025_HPSEB_114346_1]
|
HPSEBL||CE(OP) South||SE(OP) Shimla||Sr. Xen (E) Theog |
736 |
10-Sep-2025 05:00 PM |
17-Sep-2025 10:00 AM |
17-Sep-2025 11:10 AM |
[Renovation of wash room and paint work in Kedar NRI Boys Hostel at Dr YSP University of Horticulture and Forestry Nauni Solan]
[ No.UHF/Const.-1/Partfile /2025/-1618 dated 06.09.2025 ][2025_YSPU_114312_1]
|
Dr. Yashwant Singh Parmar University of Horticulture and Forestry||Estate Organisation - YSPU||Construction Division - YSPU||Executive Engineer (Const.) - YSPU |
737 |
10-Sep-2025 05:00 PM |
17-Sep-2025 10:00 AM |
17-Sep-2025 11:10 AM |
[Renovation Repair of Bathroom in Madhav Hostel at Dr YSP University of Horticulture and forestry nauni solan]
[ No.UHF/Const.-1/Partfile /2025/-1618dated 06.09.2025 ][2025_YSPU_114324_1]
|
Dr. Yashwant Singh Parmar University of Horticulture and Forestry||Estate Organisation - YSPU||Construction Division - YSPU||Executive Engineer (Const.) - YSPU |
738 |
10-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[DB-Tender-No-31(Restoration of HT LT Line Section Sarog , Fagu)/2025-26.]
[DB-Tender-No-31(Restoration of HT LT Line Section Sarog , Fagu)/2025-26.][2025_HPSEB_114345_1]
|
HPSEBL||CE(OP) South||SE(OP) Shimla||Sr. Xen (E) Theog |
739 |
10-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
23-Sep-2025 11:00 AM |
[DB-Tender-No-29(Restoration of HT/LT Lines Section Sainj , Deha)/2025-26.]
[DB-Tender-No-29(Restoration of HT/LT Lines Section Sainj , Deha)/2025-26.][2025_HPSEB_114338_1]
|
HPSEBL||CE(OP) South||SE(OP) Shimla||Sr. Xen (E) Theog |
740 |
10-Sep-2025 05:00 PM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Construction of sewerage disposal system at killar (SH Carriage of DI pipe 200 mm dia from JSV Division Chawri to JSV Division Killar]
[EE-Killar-Tender/2025-2733-53 dated 9-9-2025][2025_HPIPH_114309_1]
|
HP Irrigation and Public Health||Chamba Circle,Irrigation and Public Health,HP |
741 |
10-Sep-2025 04:45 PM |
19-Sep-2025 05:00 PM |
20-Sep-2025 10:00 AM |
[Repair and renovation of reginoal water sports centre building at pngdam distt kangra ]
[HIMUDA/DD/CB/W-7/2022-4503-12][2025_HIMUD_114388_1]
|
Himachal Urban Development Authority||Supdt. Engineer (N),HIMUDA||Executive Engineer Division,Dharamsala,HIMUDA |
742 |
10-Sep-2025 02:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on link road from Bharwain to Aranwal Km 000 to 5000 SH Const of Retaining wall at RD 1700 to 1715 LHS RD 1697 to 1720(RHS and HP Culvert at RD 2055 Under PDNA2023 ]
[RRD Bharwain to Aranwal PDNA Job No.3][2025_PWD_114222_1]
|
PWD |
743 |
10-Sep-2025 02:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Repair Restoration of rain damages on link road Mirgu to Amokhla Sidhu Km. 000 to 3000 SH Const of Retaining wall at RD 2000 to 2019 and 2080 to 2096 Under PDN2023]
[RRD Mirgu to amokla Sidhu PDNA Job No.2][2025_PWD_114219_1]
|
PWD |
744 |
10-Sep-2025 02:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on Bharwain Chintpurni Talwara road km 000 to 15310 MDR42 SH Const of Retaining wall in km. 8105 to 8140 9300 to 9340 and V shape drain and 12500 to 12530 and 12910 to 12935 at various RDs Under PDNA2023]
[RRD Bharwain Chintpurni MDR Job No. 5][2025_PWD_114239_1]
|
PWD |
745 |
10-Sep-2025 02:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[RepairRestoration of rain damages on link road Rehi Bharwain) to Duhal Bangwalan SH Const of Retaining wall at RD 1900 to 1920 and 2100 to 2115 Under PDNA2023]
[RRD Rehi Bharwain to Duhal Bangwalan Job No4][2025_PWD_114233_1]
|
PWD |
746 |
10-Sep-2025 02:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on link road from Karluhi Kagoh to Amb Tilla km 000 to 19500 SH Const of Retaining wall at RD 1580 to 1605 Under PDNA2023]
[RRD Karluhi to Kagoh to Amb Tilla PDNA Job -1][2025_PWD_114209_1]
|
PWD |
747 |
10-Sep-2025 02:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on NH70 Jawar to Nari road km 000 to 3150 SH Const of UShape drain cum Berms from RD 0830 to 1380, Retaining wall at RD 0980 to 1050 and Breast wall at RD 0985 to 1030 Under PDNA2023]
[RRD NH-70 Jawar to nari PDNA Job No9][2025_PWD_114283_1]
|
PWD |
748 |
10-Sep-2025 02:00 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:00 AM |
[Letting out Space for Tambola]
[DCKUL/25/5][2025_DCKUL_114350_1]
|
DC Office Kullu |
749 |
10-Sep-2025 02:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on NMT to Ramnagar road km 000 to 2500 SH Const of both side Berms at RD 1200 to 1700 Repair of Pot holes in km 1200 to 1700 and Providing and Erecting of W metal beam crash barrier at RD 1200 to 1600 Under PDNA2023]
[RRD NMT to Ram Nagar PDNA Jpb No. 7 Job No.1][2025_PWD_114265_1]
|
PWD |
750 |
10-Sep-2025 02:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on Sikkar da Paroh to Polian Prohitan road km 000 to 7300]
[RRD Sikkra da Paroh PDNA Job No10][2025_PWD_114287_1]
|
PWD |
751 |
10-Sep-2025 02:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on NMT to Malkada km 000 to 1120 and link road to village Dhussara SH Providing and laying 80mm thick CC interlocking paver block km 0250 to 0500 and 2850 to 2852 Under PDNA2023]
[RRD NMT to Malkada PDNA Job No.6][2025_PWD_114255_1]
|
PWD |
752 |
10-Sep-2025 02:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 11:00 AM |
[Restoration of rain damages on Jawar Gwalsar Naloh road km 000 to 6500 SH Const of UShape drain with Breast wall at RD 2200 to 2400 LHS and Const of Drain with Edge wall at RD 2900 to 2944 LHS Under PDNA2023]
[RRDJawar Gwalsar naloh PDNA Job No.8][2025_PWD_114274_1]
|
PWD |
753 |
10-Sep-2025 01:35 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 03:30 PM |
[HPSEBL/EDHMR/E/2025-26/95 Hiring of Mahindra Bolero camper diesel driven along with Driver to be used as maintenance vehicle for one year under Electrical Division HPSEB Ltd., Hamirpur.]
[HPSEBL/EDHMR/E/2025-26/96][2025_HPSEB_114349_1]
|
HPSEBL||CE(OP) CZ Hamirpur||SE(OP) Hamirpur||Sr. Xen (E) Hamirpur |
754 |
10-Sep-2025 01:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[AR and MO of various LWSS LIS under Section Nadaun-II in Tehsil Nadaun Distt. Hamirpur HP]
[No. JSV-EE-NDN-CB-Tender/2025-26/- ][2025_HPIPH_114337_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP||Hamirpur,Irrigation and Public Health,HP |
755 |
10-Sep-2025 12:30 PM |
19-Sep-2025 02:00 PM |
20-Sep-2025 11:30 AM |
[Tender for Major repair, refurbishment and testing of 40MW Pelton runner of make BHEL Sr.No.7of 3X40MW SVP Bhaba Power House under Maintenance Division HPSEBL Bhabanagar. ]
[HPSEBL/SEGB/DB-7/2025-26-11][2025_HPSEB_114332_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Bhaba Nagar |
756 |
10-Sep-2025 12:30 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[AR and MO various LWSS LIS under JSV Nadaun Section -II in Tehsil Nadaun Distt Hamirpur ]
[ No. JSV-EE-NDN-CB-Tender/2025-26/- ][2025_HPIPH_114322_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP||Hamirpur,Irrigation and Public Health,HP |
757 |
10-Sep-2025 12:30 PM |
19-Sep-2025 10:00 AM |
19-Sep-2025 10:30 AM |
[Construction of Multipurpose Hall for DIET Hamirpur at Gauna Karour (HP)]
[Construction of Multipurpose Hall for DIET Hamirpur at Gauna Karour (HP)][2025_PWD_114323_1]
|
PWD |
758 |
10-Sep-2025 12:30 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Restoration of Rain danages of LWSS Nounghi Bhumpal under JSV Sub-Division Nadaun in Tehsil Nadaun Distt Hamirpur]
[No. JSV-EE-NDN-CB-Tender/2025-26/- ][2025_HPIPH_114326_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP||Hamirpur,Irrigation and Public Health,HP |
759 |
10-Sep-2025 12:00 PM |
20-Sep-2025 04:00 PM |
22-Sep-2025 10:00 AM |
[C/o R/wall near H/o Smt. Kalawati for protection of path. (ward no. 03, Nayara.)]
[NP/Karsog/2025-638-44][2025_UDDHP_114206_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Nagar Panchayat Karsog -UDDHP |
760 |
10-Sep-2025 11:30 AM |
17-Sep-2025 11:00 AM |
17-Sep-2025 02:00 PM |
[CEKZ-SI-25-2025-26]
[CEKZ-SI-25-2025-26][2025_HPSEB_114250_2]
|
HPSEBL||CE (OP) North |
761 |
10-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Mangarh Polian road km 0.0 to 7.500]
[1150-60 dated 04-09-2025][2025_PWD_114252_8]
|
PWD |
762 |
10-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Dini Samlet road Km.0.00 to 3.00]
[1150-60 dated 04-09-2025][2025_PWD_114252_9]
|
PWD |
763 |
10-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages Pong Dam Fatehpur Jassur road Km. 5.300 to 25.00 MDR82 ]
[1150-60 dated 04-09-2025][2025_PWD_114252_7]
|
PWD |
764 |
10-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Fatehpur Deothi road Km.0.0 to 15.400]
[1150-60 dated 04-09-2025][2025_PWD_114252_1]
|
PWD |
765 |
10-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages Badwara Kut Fatehpur road Km. 0.0 to 1.700 ]
[1150-60 dated 04-09-2025][2025_PWD_114252_12]
|
PWD |
766 |
10-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Bhatoli Pakwan Malhanta Chhatral road Km. 0.0 to 8.765 ]
[1150-60 dated 04-09-2025][2025_PWD_114252_3]
|
PWD |
767 |
10-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages Jagnoli Bhatta Bhawara road Km. 0.0 to 5.00 ]
[1150-60 dated 04-09-2025][2025_PWD_114252_13]
|
PWD |
768 |
10-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Kodu Bela Thath Haler road Km. 0.00 to 8.705 SH Providing and laying cement concrete pavement at RD 1.920 to 1.970 and 2.180 to 2.240 on approaches of Chhabra Bridge towards Kodu Bela ]
[1150-60 dated 04-09-2025][2025_PWD_114252_14]
|
PWD |
769 |
10-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Badukhar Diana road Km. 0.0 to 5.0 ]
[1150-60 dated 04-09-2025][2025_PWD_114252_10]
|
PWD |
770 |
10-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Anaz Mandi Fatehpur road Km. 0.0 to 1.085 ]
[1150-60 dated 04-09-2025][2025_PWD_114252_6]
|
PWD |
771 |
10-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Badukhar Hatli Moukhar road Km. 2.0 to 18.200 ]
[1150-60 dated 04-09-2025][2025_PWD_114252_4]
|
PWD |
772 |
10-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages Moukhar Hoshiyana road Km. 0.0 to 4.350]
[1150-60 dated 04-09-2025][2025_PWD_114252_2]
|
PWD |
773 |
10-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
[Restoration of rain damages on Lohara to Manoh Sihal Km. 0.0 to 2.0 ]
[1150-60 dated 04-09-2025][2025_PWD_114252_11]
|
PWD |
774 |
10-Sep-2025 11:00 AM |
17-Sep-2025 04:00 PM |
18-Sep-2025 11:30 AM |
[NED-13/2025-26]
[NED-13/2025-26][2025_HPSEB_114226_1]
|
HPSEBL||CE (OP) North||SE (OP) Dalhousie||Sr. Xen Nurpur |
775 |
10-Sep-2025 11:00 AM |
17-Sep-2025 04:00 PM |
18-Sep-2025 11:30 AM |
[NED-14/2025-26]
[NED-14/2025-26][2025_HPSEB_114232_1]
|
HPSEBL||CE (OP) North||SE (OP) Dalhousie||Sr. Xen Nurpur |
776 |
10-Sep-2025 11:00 AM |
17-Sep-2025 04:00 PM |
18-Sep-2025 11:30 AM |
[NED-12/2025-26]
[NED-12/2025-26][2025_HPSEB_114211_1]
|
HPSEBL||CE (OP) North||SE (OP) Dalhousie||Sr. Xen Nurpur |
777 |
10-Sep-2025 10:00 AM |
25-Sep-2025 10:30 AM |
25-Sep-2025 11:00 AM |
[ES-SOL-08-2025-26]
[ES-SOL-08-2025-26][2025_HPSEB_114238_1]
|
HPSEBL||CE(ES) Hamirpur||SE(ES) Shimla||Sr. Xen (ES) Solan |
778 |
10-Sep-2025 10:00 AM |
17-Sep-2025 11:00 AM |
17-Sep-2025 11:30 AM |
[Construction of SDRF-HQ Campus at Bagora in Tehsil Palampur Distt. Kangra (HP). (SH - Hiring of Consultancy Services for Comprehensive Structural design and detailed estimates from the Empanelled Consultant by HPPWD).]
[EE PLP NIT No. 7917-966 dated 02.09.2025][2025_PWD_114174_1]
|
PWD |
779 |
10-Sep-2025 10:00 AM |
26-Sep-2025 05:00 PM |
27-Sep-2025 11:00 AM |
[HIMURJA (F-7) 2/ GCRTS/RESCO/2025-26]
[HIMURJA (F-7) 2/ GCRTS/RESCO/2025-26][2025_NCES_114276_1]
|
Non Conventional Energy Sources |
780 |
10-Sep-2025 10:00 AM |
25-Sep-2025 10:30 AM |
25-Sep-2025 01:00 PM |
[ES-SOL-10-2025-26]
[ES-SOL-10-2025-26][2025_HPSEB_114262_1]
|
HPSEBL||CE(ES) Hamirpur||SE(ES) Shimla||Sr. Xen (ES) Solan |
781 |
10-Sep-2025 10:00 AM |
25-Sep-2025 10:30 AM |
25-Sep-2025 12:00 PM |
[ES-SOL-09-2025-26]
[ES-SOL-09-2025-26][2025_HPSEB_114251_1]
|
HPSEBL||CE(ES) Hamirpur||SE(ES) Shimla||Sr. Xen (ES) Solan |
782 |
10-Sep-2025 09:00 AM |
19-Sep-2025 10:30 AM |
19-Sep-2025 11:00 AM |
[Reconstruction/Restoration on Barot Nalhota road km 0/00 to 15/500 ]
[PWD/BD/NIT/2024-25/-8456-8506 dated 08.09.2025][2025_PWD_114268_1]
|
PWD |
783 |
10-Sep-2025 09:00 AM |
19-Sep-2025 10:30 AM |
19-Sep-2025 11:00 AM |
[Restoration / Reconstruction on Bir Chaugan Lahar Kotli Road Km 0/00 to 3/350 ]
[PWD/BD/NIT/2024-25/-8456-8506 dated 08.09.2025][2025_PWD_114281_2]
|
PWD |
784 |
10-Sep-2025 09:00 AM |
19-Sep-2025 10:30 AM |
19-Sep-2025 11:00 AM |
[Restoration/ Reconstruction on Bir Palampur road km 0/00 to 13/00]
[PWD/BD/NIT/2024-25/-8456-8506 dated 08.09.2025][2025_PWD_114281_1]
|
PWD |
785 |
10-Sep-2025 09:00 AM |
19-Sep-2025 10:30 AM |
19-Sep-2025 11:00 AM |
[Restoration/Reconstruction on Deol Tatwani road km 0/00 to 10/765]
[PWD/BD/NIT/2024-25/-8456-8506 dated 08.09.2025][2025_PWD_114281_3]
|
PWD |
786 |
10-Sep-2025 09:00 AM |
19-Sep-2025 10:30 AM |
19-Sep-2025 11:00 AM |
[Reconstruction / Restoration on Harer Taras via Shillanallah Road km 0/00 to 6/225]
[PWD/BD/NIT/2024-25/-8456-8506 dated 08.09.2025][2025_PWD_114281_4]
|
PWD |
787 |
10-Sep-2025 09:00 AM |
17-Sep-2025 06:00 PM |
18-Sep-2025 01:00 PM |
[Procurement, Supply, Installation, Testing Commissioning of 90 Nos Semi Integrated Solar LED Street Lights (15W each) including poles, panels, batteries, wiring, civil foundation, and accessories at various locations under the jurisdiction of MC Una]
[MCU/e-tender/2025/1861-1864 Dated 08/09/2025][2025_UDDHP_114308_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Corporation Una - UDDHP |
788 |
09-Sep-2025 06:00 PM |
19-Sep-2025 03:00 PM |
20-Sep-2025 11:00 AM |
[Providing 180 Sanitation worker 02 Nos Supervisor During Dussehra festival 2025 for 36 days.]
[MCK/SI/Dussehra 2025/1206-10][2025_UDDHP_114197_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Kullu - UDDHP |
789 |
09-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Repair and Restoration of various LWSS and LIS under Section Talara JSV Sub Division Raja Ka Talab in Tehsil Fatehpur Distt. Kangra H.P. (SH-Outsourcing of para staff for running and operation of Pumping machinery of various schemes.]
[NIT NO. 4680-4720 dated 09.09.2025][2025_HPIPH_114191_1]
|
HP Irrigation and Public Health||Nurpur Circle,Irrigation and Public Health,HP||Fatehpur-Irrigation and Public Health-HP |
790 |
09-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Annual operation of various LWSS and Tube Well under Section Dhameta in JSV Sub Division Fatehpur. (SH-Deployment of 8 Nos. Multi Task Worker and 6 Nos. Para Pump Operator for Annual operation for running of existing water supply Eight Hour.]
[NIT NO.4680-4720 dated 09.09.2025][2025_HPIPH_114235_1]
|
HP Irrigation and Public Health||Nurpur Circle,Irrigation and Public Health,HP||Fatehpur-Irrigation and Public Health-HP |
791 |
09-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Running and operation of pumping machinery of various LWSS at Section Fatehpur under JSV Division Fatehpur. (SH-Outsourcing of para staff for running and operation of Pumping machinery of various LWSS.]
[NIT NO. 4680-4720 dated 09.09.2025][2025_HPIPH_114213_1]
|
HP Irrigation and Public Health||Nurpur Circle,Irrigation and Public Health,HP||Fatehpur-Irrigation and Public Health-HP |
792 |
09-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[C/O Heliport Terminal building, Fire Building and Utility Block at Sultanpur in Tehsil and Distt Chamba (HP) (SH- Providing Fire Alarm and PA System therein)]
[Elect. Division HPPWD Palampur][2025_PWD_114159_1]
|
PWD |
793 |
09-Sep-2025 05:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Restoration of Dehra Jawali Road Km. 39/180 to 79/600. ]
[No.PWJ/CB/TA/Tender/2025-3061 dated 03.09.2025][2025_PWD_114111_1]
|
PWD |
794 |
09-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Running and operation of pumping machinery of various LWSS at Section Rey under JSV Division Fatehpur (SH- Outsourcing para staff for running and operation of pumping machinery.]
[NIT NO. 4680-4720 dated 09.09.2025][2025_HPIPH_114253_1]
|
HP Irrigation and Public Health||Nurpur Circle,Irrigation and Public Health,HP||Fatehpur-Irrigation and Public Health-HP |
795 |
09-Sep-2025 05:00 PM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Operation running and maintenance of Sub Divisional water testing laboratory at Killar Tehsil Pangi Distt Chamba (SH Deployment of staff for operation and maintenance for one Year)]
[EE-Killar-Tender-2025-2700-06 dated 8-9-2025][2025_HPIPH_114243_1]
|
HP Irrigation and Public Health||Chamba Circle,Irrigation and Public Health,HP |
796 |
09-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
20-Sep-2025 03:30 PM |
[Estimate for Aug. 63 KVA DTR Narla into 100 KVA, 25 KVA DTR Singar into 63 KVA and 25 KVA DTR Bingaldhar into 63 KVA in various (E) Sections under ESD HPSEBL, Padhar.]
[JED-60/2025-26][2025_HPSEB_114172_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Mandi||Sr. Xen (E) J/ Nager |
797 |
09-Sep-2025 05:00 PM |
19-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Restoration Rain Damages underLWSS Andrana-Bandhan in Tehsil Palampur.Distt.Kangra HP]
[7385-7469 dated 08.09.2025][2025_HPIPH_114181_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||JSV Jaisinghpur |
798 |
09-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[Construction of 4 Nos type-II Quarters for PWD staff Colony Tissa at Bhanjraru in Distt. Chamba (H.P.) (Sub-Head- Providing EI therein)]
[Elect. Division HPPWD Palampur][2025_PWD_114157_1]
|
PWD |
799 |
09-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[Providing AC wiring and replacement of safety devices in Shivalik Hostel at Regional Health and Family welfare Centre at Chheb]
[Elect. Division HPPWD Palampur][2025_PWD_114157_2]
|
PWD |
800 |
09-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Repair and Restoration of various LWSS and LIS under Section Rehan JSV Sub Division Raja Ka Talab in Tehsil Fatehpur Distt. Kangra H.P. (SH--Outsourcing of para staff for running and operation of Pumping machinery of various schemes]
[NIT NO. 4680-4720 dated 09.09.2025][2025_HPIPH_114175_1]
|
HP Irrigation and Public Health||Nurpur Circle,Irrigation and Public Health,HP||Fatehpur-Irrigation and Public Health-HP |
801 |
09-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[Replacement of old switches,sockets,wires,post top and gyser and providing new points in the residence of various judges Senior Civil Judge-cum-CJM , family Court judge, Posco Court Judge, Jfmc Court Judge Residences in Chilgarhi, kharadanda road ]
[Elect. Division HPPWD Palampur][2025_PWD_114158_1]
|
PWD |
802 |
09-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[C/O 2 Nos. additional class rooms in Govt. Sr. Sec. School at SOLDHA, Tehsil Jawali Distt. Kangra (HP) (SH- Providing EI to 2 No. Class rooms, Verandah at Ground Floor there in)]
[Elect. Division HPPWD Palampur][2025_PWD_114158_2]
|
PWD |
803 |
09-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[Providing and Fixing Campus lighting in Additional Accommodation for newly upgraded 50 bedded Civil Hospital at Indora Distt Kangra (HP)]
[Elect. Division HPPWD Palampur][2025_PWD_114158_3]
|
PWD |
804 |
09-Sep-2025 04:00 PM |
17-Sep-2025 10:00 AM |
17-Sep-2025 11:00 AM |
[Construction of Auckland tunnel at Shimla (SH - P/L Trimix flooring etc.]
[SD-III-Tender-][2025_PWD_114247_1]
|
PWD |
805 |
09-Sep-2025 04:00 PM |
17-Sep-2025 11:30 AM |
17-Sep-2025 02:30 PM |
[CEKZ-SI-26/2025-26 ]
[CEKZ-SI-26/2025-26][2025_HPSEB_114257_1]
|
HPSEBL||CE (OP) North |
806 |
09-Sep-2025 03:00 PM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
[AR MO LWSS Jakhyol 2nd and LWSS Karohta in Tehsil Bhoranj Distt Hamirpur HP]
[ 6912-6972 dated 09-09-2025][2025_HPIPH_114189_1]
|
HP Irrigation and Public Health||Hamirpur Circle,Irrigation and Public Health,HP |
807 |
09-Sep-2025 02:40 PM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[AR and MO LWSS Jassal Sawindhar in Tehsil Karsog Distt Mandi HP Co Storage tank 10 KL at Sheog]
[ JSV_KSG_AUGUST_2025_7][2025_HPIPH_114231_1]
|
HP Irrigation and Public Health||S Nagar Circle,Irrigation and Public Health,HP||Karsog,Irrigation and Public Health,HP |
808 |
09-Sep-2025 02:30 PM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Providing LIS Shakra in Tehsil Karsog Distt Mandi HP Co of main delivery tank at Sareli]
[ JSV_KSG_AUGUST_2025_6][2025_HPIPH_114225_1]
|
HP Irrigation and Public Health||S Nagar Circle,Irrigation and Public Health,HP||Karsog,Irrigation and Public Health,HP |
809 |
09-Sep-2025 02:00 PM |
17-Sep-2025 09:00 AM |
17-Sep-2025 10:00 AM |
[A/R M.O to various residential blocks under Division No-3 at Nabha Estate Shimla (SH - Providing And fixing , Wall tiles, Cup board, PVC Flooring , replacement of damaged door Shutters , Painting and distempering in set No. K-2-79 )]
[SD-III-9736-49dt.4-09-2025][2025_PWD_114152_10]
|
PWD |
810 |
09-Sep-2025 02:00 PM |
17-Sep-2025 11:00 AM |
18-Sep-2025 11:00 AM |
[Tender for Dehydration of Transformer Oil of 66 22KV 6 point 3MVA Power Transformer No 1 installed at 66 22 kV Sub Station Hatkoti under ES Sub Division HPSEBL Nogli for the year 2025 26]
[ESDK-22/2025-26][2025_HPSEB_113143_2]
|
HPSEBL||CE(ES) Hamirpur||SE(ES) Shimla||Sr. Xen (ES) Kotla |
811 |
09-Sep-2025 01:45 PM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[AR and MO of Jal Shakti Vibhag Water Testing Laboratory at Karsog Carrying out the site calibration of laboratory instruments equipments]
[JSV_KSG_AUGUST_2025_5][2025_HPIPH_114215_1]
|
HP Irrigation and Public Health||S Nagar Circle,Irrigation and Public Health,HP||Karsog,Irrigation and Public Health,HP |
812 |
09-Sep-2025 01:20 PM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[AR and MO various LWSS WSS Schemes under JS Sub Division Kotlu in Tehsil Karsog Distt Mandi HP Providing Manpower like Multipurpose worker (MPW) for Operation and Maintenance ]
[ JSV_KSG_AUGUST_2025_4][2025_HPIPH_114210_1]
|
HP Irrigation and Public Health||S Nagar Circle,Irrigation and Public Health,HP||Karsog,Irrigation and Public Health,HP |
813 |
09-Sep-2025 01:00 PM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[AR MO WSS Karsog Sub Division Karsog in Tehsil Karsog Distt Mandi HP Hiring of Taxii Bolero Top model for one year Karsog and Kotlu]
[JSV_KSG_AUGUST_2025_3][2025_HPIPH_114204_1]
|
HP Irrigation and Public Health||S Nagar Circle,Irrigation and Public Health,HP||Karsog,Irrigation and Public Health,HP |
814 |
09-Sep-2025 12:45 PM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Annual repair and maintenance of water testing laboratory sub division karsog in tehsil karsog distt mandi hp running operation and maintenance of water testing laboratory at karsog for 12 months for the year 2025 26]
[JSV_KSG_AUGUST_2025_2][2025_HPIPH_114186_1]
|
HP Irrigation and Public Health||S Nagar Circle,Irrigation and Public Health,HP||Karsog,Irrigation and Public Health,HP |
815 |
09-Sep-2025 12:00 PM |
17-Sep-2025 09:00 AM |
17-Sep-2025 10:00 AM |
[A/R M/O to various non-residential building under Division No. III Shimla (SH - Renovation of Gents, ladies office toilet of first floor in Nirman Bhawan building Shimla).]
[SD-III-9736-49dt.4-09-2025][2025_PWD_114152_8]
|
PWD |
816 |
09-Sep-2025 12:00 PM |
17-Sep-2025 09:00 AM |
17-Sep-2025 09:00 AM |
[Special repair to MBBS Girls common Rom at Medical College. (Sh Dismantling work. Tiles work. Wood work, and WSSI work etc.]
[SD-III-9736-49dt.4-09-2025][2025_PWD_114152_7]
|
PWD |
817 |
09-Sep-2025 12:00 PM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:30 AM |
[Annual repair and maintenance of Water Testing Laboratory Sub Karsog Distt Mand HP Running operation and maintenaance of water testing laboratory at Karsog]
[JSV_KSG_AUGUST_2025_1][2025_HPIPH_114178_1]
|
HP Irrigation and Public Health||S Nagar Circle,Irrigation and Public Health,HP||Karsog,Irrigation and Public Health,HP |
818 |
09-Sep-2025 12:00 PM |
17-Sep-2025 09:00 AM |
17-Sep-2025 10:00 AM |
[Special repair to Multi-Storey paring and office accommodation (Armadale Phase-III) Building at HP Sectt. (SH - Providing and laying back filling behind the retaining wall).]
[SD-III-9736-49dt.4-09-2025][2025_PWD_114152_9]
|
PWD |
819 |
09-Sep-2025 11:30 AM |
18-Sep-2025 03:00 PM |
19-Sep-2025 03:00 PM |
[Meter reading , Prepartaion and delivery of Bills and pereparartion and serving of notices under ESD, HPSEBL, S. Nagar]
[08/2025-26][2025_HPSEB_114163_1]
|
HPSEBL||CE(OP) South||SE(OP) Rohru||Sr. Xen (E) Jubbal |
820 |
09-Sep-2025 11:30 AM |
17-Sep-2025 09:00 AM |
17-Sep-2025 10:00 AM |
[A/R and M/O to various non-residential under Division No. III Shimla (SH - Polishing and replacing toilet fitting and other repair work in Police Head Qt. at Nigam Vihar Shimla).]
[SD-III-9736-49dt.4-09-2025][2025_PWD_114152_6]
|
PWD |
821 |
09-Sep-2025 11:30 AM |
17-Sep-2025 11:00 AM |
17-Sep-2025 11:30 AM |
[Landslide Disaster Mitigation on Charri to Ghera road Km 0/00 to 8/55 (Balance work) (Construction of Breast Wall with wire crate and C.C. Pusta at Rd 3/354 to 3/390 RHS)]
[NIT NO.3110-49 DT 04-09-2025][2025_PWD_114169_1]
|
PWD |
822 |
09-Sep-2025 11:00 AM |
18-Sep-2025 03:30 PM |
19-Sep-2025 11:30 AM |
[Tender for the work Providing and fixing Galvanized iron pipe for water supply from Kandar Nallah to underground power House Cavern including construction of RCC Tank and MS stand for Storage Tanks, under civil maintenance division HPSEBL Bhabanaga]
[HPSEBL/SEGB/DB-7/2025-26-10][2025_HPSEB_114171_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Bhaba Nagar |
823 |
09-Sep-2025 11:00 AM |
19-Sep-2025 11:00 AM |
19-Sep-2025 11:30 AM |
[Construction of Rest House Civil work Electrical Wiring Fitting Fixtures Sanitary Water Supply etc]
[NO. EE-JSD-EA-2025- 8550-8649][2025_HPIPH_114164_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Dharamshala,Irrigation and Public Health,HP |
824 |
09-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[R/M of 01 No. 500 KVA DG set No. ii and allied equipments, AMF panel etc. installed in Basement Floor, main panel room of 500-bedded Hospital Dr.RPGMC Kangra at Tanda for the year 2025-26]
[Elect. Division HPPWD Palampur][2025_PWD_114156_4]
|
PWD |
825 |
09-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[R/M of 01 No. 500 KVA DG set No.1 and allied equipments, AMF panel etc. installed in Basement Floor, main panel room of 500 bedded Hospital Dr.RPGMC Tanda for the year 2025-26]
[Elect. Division HPPWD Palampur][2025_PWD_114156_3]
|
PWD |
826 |
09-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[Repair and maintenance of 01 No. 125 KVA DG set and allied equipments for data centre installed in basement floor of central library building at Dr. RPGMC Kangra at Tanda for three year 2025-2028]
[Elect. Division HPPWD Palampur][2025_PWD_114156_2]
|
PWD |
827 |
09-Sep-2025 10:00 AM |
18-Sep-2025 11:00 AM |
18-Sep-2025 11:30 AM |
[Repair and Maintenance of 01No. 750 KVA D.G. set No. II installed in super specialty block at Dr. RPGMC Kangra at Tanda for the year 2025-2026]
[Elect. Division HPPWD Palampur][2025_PWD_114156_1]
|
PWD |
828 |
08-Sep-2025 11:00 AM |
17-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
[FINAL PROJECT EVALUATION]
[D-3/24][2025_FD_114064_1]
|
Himachal Pradesh Forest Department||Chief Project Director (KfW) Dharamshala |
829 |
08-Sep-2025 10:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 10:00 AM |
[Providing one No. driver bolero jeep HP 07C 1404 at electrical division No.II Shimla for the year 2025to 26]
[ED.II.TA.TENDER.25-26-1283 dt. 04-09-25][2025_PWD_113956_4]
|
PWD |
830 |
08-Sep-2025 10:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 10:00 AM |
[AMC of one No. 13 passenger stretcher elevator Thyssen Krupp installed in Auditorium building in Auditorium building at IGMC Shimla for the year 2025 to 26]
[ED.II.TA.TENDER.25-26-1283 dt. 04-09-25][2025_PWD_113956_3]
|
PWD |
831 |
08-Sep-2025 10:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 10:00 AM |
[AMC of 2 No. Johnson company lift in civil hospital Rohru District Shimla. w.e.f 16.06.2025 to 15.06.2026]
[ED.II.TA.TENDER.25-26-1283 dt. 04-09-25][2025_PWD_113956_2]
|
PWD |
832 |
08-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[Restoration of rain Damages on Baroh Chowk Dehrian Jandrah Talli Tikka Lagru Dola Kharyana Khundian Nahllian Road Km 9/135 to 35/300]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025][2025_PWD_114153_1]
|
PWD |
833 |
08-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[estoration of Rain Damages on Baroh Chowk Dehrian Jandrah Tikka Lagru Dola Kharyana Khundian Nahllian Road Km 9/135 to 35/300 ]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025][2025_PWD_114009_1]
|
PWD |
834 |
08-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[Restoration of rain Damages on Baroh Chowk Dehrian Jandrah Talli Tikka Lagru Dola Kharyana Khundian Nahllian Road Km 9/135 to 35/300.]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025][2025_PWD_113999_1]
|
PWD |
835 |
08-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[R/R Damages on Baroh Chowk Dehrian Jandrah Talli Tikka Lagru Dola Kharyana Khundian Nahllian Road Km 9/135 to 35/300 ]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025][2025_PWD_114006_1]
|
PWD |
836 |
08-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[ Restoration of rain Damages on Baroh Chowk Dehrian Jandrah Talli Tikka Lagru Dola Kharyana Khundian Nahllian Road Km 9/135 to 35/300.]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025][2025_PWD_114154_1]
|
PWD |
837 |
08-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[Restoration of rain Damages on Link road Bulli to Sehorbala Road Km 0/000 to 3/500.]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025][2025_PWD_113997_1]
|
PWD |
838 |
08-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[Restoration of Rain Damages on Baroh Chowk Dehrian Jandrah Talli Tikka Lagru Dola Kharyana Khundian Nahllian Road Km 9/135 to 35/300.]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025][2025_PWD_114155_1]
|
PWD |
839 |
08-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[Restoration of rain Damages on Baroh Chowk Dehrian Jandrah Talli Tikka Lagru Dola Kharyana Khundian Nahllian Road Km 9/135 to 35/300.]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025][2025_PWD_114139_1]
|
PWD |
840 |
08-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[ Restoration of rain Damages on Baroh Chowk Dehrian Jandrah Talli Tikka Lagru Dola Kharyana Khundian Nahllian Road Km 9/135 to 35/300]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025][2025_PWD_114114_1]
|
PWD |
841 |
08-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[Restoration of rain Damages on Baroh Chowk Dehrian Jandrah Talli Tikka Lagru Dola Kharyana Khundian Nahllian Road Km 9/135 to 35/30]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025][2025_PWD_114011_1]
|
PWD |
842 |
08-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[Restoration of rain Damages on Link road Bulli to Sehorbala Road Km 0/000 to 3/500]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025][2025_PWD_113990_1]
|
PWD |
843 |
08-Sep-2025 10:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 10:00 AM |
[Modernization of existing passenger lift installed in New OPD at IGMC Shimla. SH Addition of 2 No. elevator floors level i.e. 1st and 2nd floor.]
[ED.II.TA.TENDER.25-26-1283 dt. 04-09-25][2025_PWD_113981_1]
|
PWD |
844 |
08-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[Restoration of Rain Damages on Baroh Chowk Dehrian Jandrah Tikka Lagru Dola Kharyana Khundian Nahllian Road Km 9/135 to 35/300]
[EE Jawalamukhi letter No3837-38 Dated 02.09.2025][2025_PWD_114039_1]
|
PWD |
845 |
08-Sep-2025 09:00 AM |
22-Sep-2025 03:00 PM |
23-Sep-2025 12:00 PM |
[Tender for providing SOP to Augmentation of source of various LWSS Scheme at Koserian/ Jaishree Devi from River Satluj in JSV Division Barasar Distt Hamirpur (H.P.) under Electrical Sub-Division Talai Electrical Division Ghumarwin and Barsar ]
[NIT-14/2025-26][2025_HPSEB_114029_1]
|
HPSEBL||CE(OP) CZ Hamirpur |
846 |
08-Sep-2025 09:00 AM |
17-Sep-2025 10:30 AM |
17-Sep-2025 11:00 AM |
[Reconstruction / Restoration on Raina Bari to Balh km 1/00 to 1/500]
[PWD/BD/NIT/2024-25/-8187-8235 dated ][2025_PWD_114112_1]
|
PWD |
847 |
06-Sep-2025 06:30 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 11:30 AM |
[Job No. 157/SMS - Renovation/Lining of Irrigation channel Garsa nallah ward-03 in G.P Garsa]
[Job No. 157/SMS - Renovation/Lining of Irrigation channel Garsa nallah ward-03 in G.P Garsa][2025_CPD1_114151_1]
|
Chief Project Director IDP Solan||DPO Kullu |
848 |
06-Sep-2025 06:00 PM |
17-Sep-2025 05:00 PM |
18-Sep-2025 12:30 PM |
[GED-82/2025-26]
[GED-82/2025-26][2025_HPSEB_114055_1]
|
HPSEBL||CE(OP) CZ Hamirpur||SE (OP) Una||Sr. Xen Gagret |
849 |
06-Sep-2025 05:30 PM |
19-Sep-2025 10:30 AM |
19-Sep-2025 11:30 AM |
[Providing LWSS Kangain to Thambu and its adjoining villages under JJM in Tehsil Palampur/Jaisinghpur Distt. Kangra (HP) ]
[EE/JSVD/THL/2025-26-5668-5716 Dt. 06.09.2025][2025_HPIPH_114109_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Thural,Irrigation and Public Health,HP |
850 |
06-Sep-2025 04:00 PM |
27-Sep-2025 11:00 AM |
27-Sep-2025 11:30 AM |
[E-tenders for Whet Bhussa]
[4201][2025_DAH1_114105_1]
|
Directorate Animal Husbandry||Director Animal Husbandry |
851 |
06-Sep-2025 04:00 PM |
27-Sep-2025 11:30 AM |
27-Sep-2025 11:45 AM |
[E-tenders for green fodder]
[4207][2025_DAH1_114121_1]
|
Directorate Animal Husbandry||Director Animal Husbandry |
852 |
06-Sep-2025 04:00 PM |
27-Sep-2025 05:00 PM |
29-Sep-2025 02:00 PM |
[PROVIDING SANITATION/CLEANLINES SERVIES]
[HPBoSE/Store/2025-1626][2025_HPBOS_114127_1]
|
Himachal Pradesh Board of School Education Dharamshala |
853 |
06-Sep-2025 04:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), at Dharewda, in GP- Dhanat for the year 2025-26 under APO unit Nerwa. (1 No.)]
[SWS/24/25-26][2025_CPD1_114124_1]
|
Chief Project Director IDP Solan||DPO Shimla |
854 |
06-Sep-2025 04:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), at Ruinja Basti in GP- Kiran for the year 2025-26 under APO unit Nerwa. (1 No.)]
[SWS/23/25-26][2025_CPD1_114120_1]
|
Chief Project Director IDP Solan||DPO Shimla |
855 |
06-Sep-2025 04:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), at Shawda, in GP- Kiran for the year 2025-26 under APO unit Nerwa. (1 No.)]
[SWS/22/25-26][2025_CPD1_114116_1]
|
Chief Project Director IDP Solan||DPO Shimla |
856 |
06-Sep-2025 03:00 PM |
29-Sep-2025 03:00 PM |
29-Sep-2025 03:30 PM |
[Automatic Paper Folding Machine]
[P and S24/2025(Store)5737][2025_HPPNS_114031_1]
|
Printing and Stationery Department |
857 |
06-Sep-2025 03:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), at Banalti, and at Diwan Basti, in GP- Tikkri for the year 2025-26 under APO unit Nerwa. (2 No.)]
[SWS/21/25-26][2025_CPD1_114089_1]
|
Chief Project Director IDP Solan||DPO Shimla |
858 |
06-Sep-2025 02:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), at Shathali, in GP- Kanda Banah for the year 2025-26 under APO unit Nerwa. (1 No.)]
[SWS/20/25-26][2025_CPD1_114086_1]
|
Chief Project Director IDP Solan||DPO Shimla |
859 |
06-Sep-2025 02:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), at Korai, in GP- Tailor for the year 2025-26 under APO unit Nerwa. (1 No.)]
[SWS/19/25-26][2025_CPD1_114082_1]
|
Chief Project Director IDP Solan||DPO Shimla |
860 |
06-Sep-2025 02:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), at Chauhan Dhar, at Fawla in GP- Khund Newal for the year 2025-26 under APO unit Nerwa.(2 No.)]
[SWS/18/25-26][2025_CPD1_114081_1]
|
Chief Project Director IDP Solan||DPO Shimla |
861 |
06-Sep-2025 02:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), at Harizan Basti, in GP- Dhar Chandna for the year 2025-26 under APO unit Nerwa.(1 No.)]
[SWS/17/25-26][2025_CPD1_114078_1]
|
Chief Project Director IDP Solan||DPO Shimla |
862 |
06-Sep-2025 02:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), near village-Jayal, near village-Jubti Lift, in GP- Dewat for the year 2025-26 under APO unit Nerwa.(2 No.)]
[SWS/14/25-26][2025_CPD1_114067_1]
|
Chief Project Director IDP Solan||DPO Shimla |
863 |
06-Sep-2025 02:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), at Lower Bast, in GP- Halau for the year 2025-26 under APO unit Nerwa. (1 No.)]
[SWS/16/25-26][2025_CPD1_114075_1]
|
Chief Project Director IDP Solan||DPO Shimla |
864 |
06-Sep-2025 02:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), near village-Tarapur, in GP- Pouria for the year 2025-26 under APO unit Nerwa. (1 No.)]
[SWS/15/25-26][2025_CPD1_114068_1]
|
Chief Project Director IDP Solan||DPO Shimla |
865 |
06-Sep-2025 01:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), near village-Halan Thach, in GP- Mundli for the year 2025-26 under APO unit Nerwa. (1 No.)]
[SWS/12/25-26][2025_CPD1_114058_1]
|
Chief Project Director IDP Solan||DPO Shimla |
866 |
06-Sep-2025 01:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), near village-Dubak (Dhar), in GP- Madhana for the year 2025-26 under APO unit Nerwa. (1 No.)]
[SWS/11/25-26][2025_CPD1_114052_1]
|
Chief Project Director IDP Solan||DPO Shimla |
867 |
06-Sep-2025 01:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), near village-Dwari, near village-Jadoli (Mandal Basti) in GP- Tharoch for the year 2025-26 under APO unit Nerwa. (2 No.)]
[SWS/10/25-26][2025_CPD1_114048_1]
|
Chief Project Director IDP Solan||DPO Shimla |
868 |
06-Sep-2025 01:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), near village-Saltuya Dhar, near village-Rakad Basti, in GP- Manu Bhabia for the year 2025-26 under APO unit Nerwa.(2 No.)]
[SWS/13/25-26][2025_CPD1_114062_1]
|
Chief Project Director IDP Solan||DPO Shimla |
869 |
06-Sep-2025 10:00 AM |
26-Sep-2025 02:00 PM |
26-Sep-2025 02:30 PM |
[Procurement of Blood/Urine/Saliva Kit for RANDOX Biochip Array Technology-Evidence Multistat analyzer]
[DFS (Plan Budget/MS)/2025 - 4189][2025_FSLHP_113989_8]
|
Directorate of Forensics Services Himachal Pradesh |
870 |
06-Sep-2025 10:00 AM |
26-Sep-2025 02:00 PM |
26-Sep-2025 02:30 PM |
[Procurement of DNA Investigator Kit Compatible with Qiagen EZ1 Advance XL, Automated Nucleic Acid Purification System]
[DFS (Plan Budget/MS)/2025 - 4189][2025_FSLHP_113989_6]
|
Directorate of Forensics Services Himachal Pradesh |
871 |
06-Sep-2025 10:00 AM |
26-Sep-2025 02:00 PM |
26-Sep-2025 02:30 PM |
[Procurement of Human Identification Y-STR DNA Kit Compatible with ABI 3500 XL Genetic Analyzers]
[DFS (Plan Budget/MS)/2025 - 4189][2025_FSLHP_113989_5]
|
Directorate of Forensics Services Himachal Pradesh |
872 |
06-Sep-2025 10:00 AM |
26-Sep-2025 02:00 PM |
26-Sep-2025 02:30 PM |
[Procurement of Human Identification Autosomal STR DNA Kit Compatible with ABI 3500 XL Genetic Analyzers]
[DFS (Plan Budget/MS)/2025 - 4189][2025_FSLHP_113989_4]
|
Directorate of Forensics Services Himachal Pradesh |
873 |
06-Sep-2025 10:00 AM |
26-Sep-2025 02:00 PM |
26-Sep-2025 02:30 PM |
[Procurement of High End Forensic Workstation]
[DFS (Plan Budget/MS)/2025 - 4189][2025_FSLHP_113989_2]
|
Directorate of Forensics Services Himachal Pradesh |
874 |
06-Sep-2025 10:00 AM |
26-Sep-2025 02:00 PM |
26-Sep-2025 02:30 PM |
[Procurement of RT-PCR Kit Compatible with Qiagen Rotor-Gene Q]
[DFS (Plan Budget/MS)/2025 - 4189][2025_FSLHP_113989_7]
|
Directorate of Forensics Services Himachal Pradesh |
875 |
06-Sep-2025 10:00 AM |
26-Sep-2025 02:00 PM |
26-Sep-2025 02:30 PM |
[Procurement of Passware Kit Ultimate]
[DFS (Plan Budget/MS)/2025 - 4189][2025_FSLHP_113989_1]
|
Directorate of Forensics Services Himachal Pradesh |
876 |
06-Sep-2025 10:00 AM |
26-Sep-2025 02:00 PM |
26-Sep-2025 02:30 PM |
[Procurement of Gas Chromatography Headspace (GC-HS) system ]
[DFS (Plan Budget/MS)/2025 - 4189][2025_FSLHP_113989_3]
|
Directorate of Forensics Services Himachal Pradesh |
877 |
05-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 12:30 PM |
[C/o RCC Circular tank (36000 Lts), near village-Khokha (Dhanaik Basti), near village-Bagasan Basti, in GP- Rushlah for the year 2025-26 under APO unit Nerwa. (2 No.)]
[SWS/09/25-26][2025_CPD1_114002_1]
|
Chief Project Director IDP Solan||DPO Shimla |
878 |
05-Sep-2025 05:00 PM |
20-Sep-2025 03:00 PM |
20-Sep-2025 05:00 PM |
[R and M of Civil Works]
[REGPHD-44/2025-26][2025_HPSEB_113957_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Nahan||RE Girinagar |
879 |
05-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
23-Sep-2025 11:30 AM |
[Conducting a Street Light Feasibility Study in Municipal Corporation Shimla ]
[1053to1064Dated02092025][2025_MC_113994_1]
|
Municipal Corporation Shimla |
880 |
05-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 02:00 PM |
[Construction of retaining wall across nallah adjoining Rajesh Sharma house in ward no.16]
[7694-95 dt. 28.08.2025][2025_UDDHP_113963_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Solan - UDDHP |
881 |
05-Sep-2025 05:00 PM |
17-Sep-2025 10:00 AM |
17-Sep-2025 03:00 PM |
[BED-55/2025-26]
[BED-55/2025-26][2025_HPSEB_113987_1]
|
HPSEBL||CE (OP) North||SE (OP) Kangra||Sr. Xen Bajinath |
882 |
05-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 02:00 PM |
[Construction of road from Shamti bye pass road Devi ram house in ward no.16 SH. C.o R.wall, U Shape drain CC 1.2.4 etc.]
[7694-95 dt. 28.08.2025][2025_UDDHP_113977_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Solan - UDDHP |
883 |
05-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 02:00 PM |
[Providing RCC slab from below Thakur parking near Vikram house kaushik house patrar in ward no.15 SH. R wall, slab and 1.2.4 etc.]
[7694-95 dt. 28.08.2025][2025_UDDHP_113933_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Solan - UDDHP |
884 |
05-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 02:00 PM |
[Channelization of nallah near Geeta Adarsh School in ward no.7 phase I]
[7694-95 dt. 28.08.2025][2025_UDDHP_113917_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Solan - UDDHP |
885 |
05-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 02:00 PM |
[Providing CC on road from Rajgarh road to Shani Mandir Scientist colony in ward no.15]
[7694-95 dt. 28.08.2025][2025_UDDHP_113928_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Solan - UDDHP |
886 |
05-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 02:00 PM |
[Construction of side wall of nallah from Indra house to Bhupender Kalsi house in ward no.13 Solan]
[7694-95 dt. 28.08.2025][2025_UDDHP_113923_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Solan - UDDHP |
887 |
05-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 02:00 PM |
[Channelization to nallah below flyover near Rakesh Shankhyan house at brewery in ward no.4 Solan]
[7694-95 dt. 28.08.2025][2025_UDDHP_113905_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Solan - UDDHP |
888 |
05-Sep-2025 05:00 PM |
22-Sep-2025 10:30 AM |
22-Sep-2025 12:30 PM |
[Tender for Complete overhauling and replacement of defective equipments of 66 22KV Power Transformers 1 2 ie Breathers for Main Tank and Breathers for OLTC along with replacement of Auxiliary Contactors for 22KV Bus Coupler Spare Feeder Anni]
[ESDK-21/2025-26][2025_HPSEB_112700_2]
|
HPSEBL||CE(ES) Hamirpur||SE(ES) Shimla||Sr. Xen (ES) Kotla |
889 |
05-Sep-2025 05:00 PM |
29-Sep-2025 05:00 PM |
30-Sep-2025 03:00 PM |
[Digital Crop Survey ]
[Agr.H (AIS) A (7) -34/2011- XIV-DCS][2025_DoA_113889_1]
|
Director of Agriculture |
890 |
05-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 02:00 PM |
[Channelaization of nallah near Lokender house to below Ramesh Kotavi house pawan vihar ward no.15 Solan]
[7694-95 dt. 28.08.2025][2025_UDDHP_113938_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Solan - UDDHP |
891 |
05-Sep-2025 05:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 02:00 PM |
[Channelization of nallah near Geeta Adarsh School in ward no.7 Phase II]
[7694-95 dt. 28.08.2025][2025_UDDHP_113920_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Solan - UDDHP |
892 |
05-Sep-2025 04:00 PM |
18-Sep-2025 11:30 AM |
19-Sep-2025 11:00 AM |
[Dismentaling of Buidling in Temple Deotsidh]
[TBBNT_984_994][2025_TBBND_113880_1]
|
Trust Baba Balak Nath Temple Deotsidh |
893 |
05-Sep-2025 12:30 PM |
17-Sep-2025 04:00 PM |
18-Sep-2025 11:00 AM |
[MTD-01-2025-26]
[MTD-01-2025-26][2025_HPSEB_113878_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(M and T) Bilaspur||Sr. Xen (M and T) Solan |
894 |
05-Sep-2025 12:10 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT ECO GREEN HIMALAYAN PUNDRIK RISHI LAKE ECO TOURISM SITE SARAHAN IN SERAJ FOREST DIVISION OF KULLU FOREST CIRCLE IN THE STATE OF HIMACHAL P]
[ET/Eco-Tourism sites-P4/2025/220/27][2025_ECOSO_113858_1]
|
Eco-Tourism Society of Himachal Pradesh |
895 |
05-Sep-2025 12:10 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT BAGA SARAHAN ECO TOURISM SITE IN ANI FOREST DIVISION OF RAMPUR FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/25][2025_ECOSO_113845_1]
|
Eco-Tourism Society of Himachal Pradesh |
896 |
05-Sep-2025 12:10 PM |
26-Sep-2025 05:00 PM |
27-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT GARSA BIHAL ECO TOURISM SITE IN PARVATI FOREST DIVISION OF KULLU FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/26][2025_ECOSO_113855_1]
|
Eco-Tourism Society of Himachal Pradesh |
897 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT SIDHPUR ECO TOURISM SITE IN KOTGARH FOREST DIVISION OF RAMPUR FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/19][2025_ECOSO_113808_1]
|
Eco-Tourism Society of Himachal Pradesh |
898 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT JALORI PASS ECO TOURISM SITE IN ANI FOREST DIVISION OF RAMPUR FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/15][2025_ECOSO_113786_1]
|
Eco-Tourism Society of Himachal Pradesh |
899 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT ECO-GREEN HIMALAYAN VILLAGE SOJHA ECO TOURISM SITE IN SERAJ FOREST DIVISION OF KULLU FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/20][2025_ECOSO_113813_1]
|
Eco-Tourism Society of Himachal Pradesh |
900 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT SARA THACH ECO TOURISM SITE IN KOTGARH FOREST DIVISION OF RAMPUR FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/17][2025_ECOSO_113800_1]
|
Eco-Tourism Society of Himachal Pradesh |
901 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT ALHA CAMPING ECO TOURISM SITE IN DALHOUSIE FOREST DIVISION OF CHAMBA FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/07][2025_ECOSO_113710_1]
|
Eco-Tourism Society of Himachal Pradesh |
902 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT SOURAV VAN VIHAR ECO TOURISM SITE IN PALAMPUR FOREST DIVISION OF DHARAMSHALA FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/06][2025_ECOSO_113685_1]
|
Eco-Tourism Society of Himachal Pradesh |
903 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT GANGANAL NEAR PRASHAR LAKE ECO TOURISM SITE IN MANDI FOREST DIVISION OF MANDI FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/10][2025_ECOSO_113756_1]
|
Eco-Tourism Society of Himachal Pradesh |
904 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT MULTHAN NEAR BAROT VALLEY ECO TOURISM SITE IN PALAMPUR FOREST DIVISION OF DHARAMSHALA FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/11][2025_ECOSO_113763_1]
|
Eco-Tourism Society of Himachal Pradesh |
905 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT NEUGAL PARK ECO TOURISM SITE IN PALAMPUR FOREST DIVISION OF DHARAMSHALA FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/16][2025_ECOSO_113792_1]
|
Eco-Tourism Society of Himachal Pradesh |
906 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT CAMPING SITE AT KHIRDI DHAR ECO TOURISM SITE IN DALHOUSIE FOREST DIVISION OF CHAMBA FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/13][2025_ECOSO_113776_1]
|
Eco-Tourism Society of Himachal Pradesh |
907 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT KOTHI ECO TOURISM SITE IN KULLU FOREST DIVISION OF KULLU FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/12][2025_ECOSO_113771_1]
|
Eco-Tourism Society of Himachal Pradesh |
908 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT TRIUND-2 ECO TOURISM SITE IN DHARAMSHALA FOREST DIVISION OF DHARAMSHALA FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/01][2025_ECOSO_113188_1]
|
Eco-Tourism Society of Himachal Pradesh |
909 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT SHAHEED ASHOK KUMAR JOT NATURE PARK ECO TOURISM SITE IN DALHOUSIE FOREST DIVISION OF CHAMBA FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/09][2025_ECOSO_113754_1]
|
Eco-Tourism Society of Himachal Pradesh |
910 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT NATURE PARK AT BANIKHET ECO TOURISM SITE IN DALHOUSIE FOREST DIVISION OF CHAMBA FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/08][2025_ECOSO_113739_1]
|
Eco-Tourism Society of Himachal Pradesh |
911 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT JHAMUDA ECO TOURISM SITE IN KOTGARH FOREST DIVISION OF RAMPUR FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/18][2025_ECOSO_113804_1]
|
Eco-Tourism Society of Himachal Pradesh |
912 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT KARERI NEAR TO ZOSTAL ECO TOURISM SITE IN DHARAMSHALA FOREST DIVISION OF DHARAMSHALA FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/05][2025_ECOSO_113675_1]
|
Eco-Tourism Society of Himachal Pradesh |
913 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT DAYNA PARK ECO TOURISM SITE IN MANDI FOREST DIVISION OF MANDI FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/24][2025_ECOSO_113836_1]
|
Eco-Tourism Society of Himachal Pradesh |
914 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT DHUMA DEVI ECO TOURISM SITE IN MANDI FOREST DIVISION OF MANDI FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/23][2025_ECOSO_113832_1]
|
Eco-Tourism Society of Himachal Pradesh |
915 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT CAMPING SITE AT FRH KAINTHLY ECO TOURISM SITE IN DALHOUSIE FOREST DIVISION OF CHAMBA FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/14][2025_ECOSO_113782_1]
|
Eco-Tourism Society of Himachal Pradesh |
916 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT ANSAR ECO TOURISM SITE IN MANDI FOREST DIVISION OF MANDI FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/22][2025_ECOSO_113825_1]
|
Eco-Tourism Society of Himachal Pradesh |
917 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT DHOMRI ECO TOURISM SITE IN KOTGARH FOREST DIVISION OF RAMPUR FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/21][2025_ECOSO_113819_1]
|
Eco-Tourism Society of Himachal Pradesh |
918 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT BOH KHABRU WATER FALL ECO TOURISM SITE IN DHARAMSHALA FOREST DIVISION OF DHARAMSHALA FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/04][2025_ECOSO_113665_1]
|
Eco-Tourism Society of Himachal Pradesh |
919 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT TRIUND-3 ECO TOURISM SITE IN DHARAMSHALA FOREST DIVISION OF DHARAMSHALA FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/02][2025_ECOSO_113257_1]
|
Eco-Tourism Society of Himachal Pradesh |
920 |
05-Sep-2025 12:00 PM |
26-Sep-2025 05:00 PM |
29-Sep-2025 10:30 AM |
[SELECTION OF OPERATOR FOR DESIGN, DEVELOPMENT, MANAGEMENT/ PROVIDING SERVICES TO RUN ECO-TOURISM ACTIVITIES AT BIR-BILLING ECO TOURISM SITE IN PALAMPUR FOREST DIVISION OF DHARAMSHALA FOREST CIRCLE IN THE STATE OF HIMACHAL PRADESH]
[ET/Eco-Tourism sites-P4/2025/220/03][2025_ECOSO_113657_1]
|
Eco-Tourism Society of Himachal Pradesh |
921 |
05-Sep-2025 11:00 AM |
17-Sep-2025 11:00 AM |
17-Sep-2025 04:00 PM |
[Tender for Augmentation of existing 25KVA,11/0.4KV into 63KVA ,11/0.4KV S/Stn Kawal -Kot in (E) section Kothi UESD, HPSEBL,Rewalsar.(T.S NO-56/2025-26) MED R-79/25-26]
[MED/R-79/2025-26][2025_HPSEB_113670_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Mandi||Sr. Xen (E) Mandi |
922 |
05-Sep-2025 11:00 AM |
17-Sep-2025 11:00 AM |
17-Sep-2025 04:00 PM |
[Tender for Aug of 25KVA, 11/.4KV S/stn. in to 63 kva At village Taryandi in (E) section Khaliyar UESD,HPSEBL No-III Mandi.(T.S NO-90/2025-26)M-III-78]
[MED/M-III-78/2025-26][2025_HPSEB_113663_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Mandi||Sr. Xen (E) Mandi |
923 |
05-Sep-2025 11:00 AM |
17-Sep-2025 11:00 AM |
17-Sep-2025 04:00 PM |
[Tender for Providing and fixing Cement Board Ceiling for Chief Engineer Residence at Jail Road UESD-III, HPSEBL Mandi. (TS 98/2025-26) (MED/M-III-82/25-26)]
[MED/M-III-82/2025-26][2025_HPSEB_113691_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Mandi||Sr. Xen (E) Mandi |
924 |
05-Sep-2025 11:00 AM |
17-Sep-2025 11:00 AM |
17-Sep-2025 04:00 PM |
[Tender for Providing and Fixing Cement Board Ceiling for Electrical Sub Division-II Office Building Under ESD-II, HPSEBL Mandi. Ch. To-Ts No 42/21-22 MED M-II-85/25-26]
[MED/M-II-85/2025-26][2025_HPSEB_113706_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Mandi||Sr. Xen (E) Mandi |
925 |
04-Sep-2025 05:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 11:30 AM |
[Providing Sewerage Scheme GP Tharu Kawari Hatwas Keerchamba and its adjoining area in Tehsil Nagrota Bagwan]
[EE_NBD_8651-99 dt.04.09.25][2025_HPIPH_113809_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Nagrota Bagwan |
926 |
04-Sep-2025 05:00 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 02:30 PM |
[purchase of different kinds of instruments/ machinery / other items and accessories for the establishment of Residual Testing Laboratory]
[Residual Testing Laboratory][2025_DoA_113827_1]
|
Director of Agriculture |
927 |
04-Sep-2025 02:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 12:30 PM |
[C/o Ponds (Mannual Excavation) at Vill- Bhanal Maanu, in GP-Manu Bhabia for the year 2025-26 under APO unit Nerwa. ]
[Pond/07/25-26][2025_CPD1_113794_1]
|
Chief Project Director IDP Solan||DPO Shimla |
928 |
04-Sep-2025 02:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 12:30 PM |
[C/o Ponds (Mannual Excavation) at Vill- Gaat, in GP-Dhar Chandna for the year 2025-26 under APO unit Nerwa]
[Pond/09/25-26][2025_CPD1_113801_1]
|
Chief Project Director IDP Solan||DPO Shimla |
929 |
04-Sep-2025 02:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 12:30 PM |
[C/o Ponds (Mannual Excavation) at Vill- Bayal Pani, in GP-Mundli for the year 2025-26 under APO unit Nerwa]
[Pond/06/25-26][2025_CPD1_113790_1]
|
Chief Project Director IDP Solan||DPO Shimla |
930 |
04-Sep-2025 02:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 12:30 PM |
[C/o Ponds (Mannual Excavation) at Vill- Sana Dhar, in GP-Khund Newal for the year 2025-26 under APO unit Nerwa]
[Pond/08/25-26][2025_CPD1_113798_1]
|
Chief Project Director IDP Solan||DPO Shimla |
931 |
04-Sep-2025 02:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 12:30 PM |
[C/o Ponds (Mannual Excavation) at Vill- Jaamad Dhar, in GP-Tailor for the year 2025-26 under APO unit Nerwa. ]
[Pond/10/25-26][2025_CPD1_113802_1]
|
Chief Project Director IDP Solan||DPO Shimla |
932 |
04-Sep-2025 01:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 12:30 PM |
[C/o Ponds (Mannual Excavation) near Vill- Kuffar, in GP- Deothi for the year 2025-26 under APO unit Sainj]
[Pond/03/25-26][2025_CPD1_113781_1]
|
Chief Project Director IDP Solan||DPO Shimla |
933 |
04-Sep-2025 01:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 12:30 PM |
[C/o Ponds (Mannual Excavation) at Vill- Jaaman, in GP- Rushla for the year 2025-26 under APO unit Nerwa]
[Pond/05/25-26][2025_CPD1_113788_1]
|
Chief Project Director IDP Solan||DPO Shimla |
934 |
04-Sep-2025 01:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 12:30 PM |
[C/o Ponds (Mannual Excavation) near Vill- Kuina, in GP- Dhamandri for the year 2025-26 under APO unit Sainj]
[Pond/04/25-26][2025_CPD1_113784_1]
|
Chief Project Director IDP Solan||DPO Shimla |
935 |
04-Sep-2025 11:00 AM |
24-Sep-2025 05:00 PM |
24-Sep-2025 05:10 PM |
[Finalization of Rate Contract of DENTAL EQUIPMENT AND DENTAL MATERIAL]
[Finalization of Rate Contract of DENTAL EQUIPMENT AND DENTAL MATERIAL][2025_DFHW_113596_1]
|
Department of Health and Family Welfare||National Health Mission |
936 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages on RCD Road Km 0 00 to 92 695 SH Hiring of JCB for Removal of slips drain and dressing of road surface on RCD road under Kawar Sub Division ]
[2905-2910 dated 1-09-2025][2025_PWD_113593_18]
|
PWD |
937 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages to Kimwali Bailey Bridge 55 mtrs span SH Protection of bridge abutment scouring left bank side of river Rupin at Km 81 460]
[2905-2910 dated 1-09-2025][2025_PWD_113593_16]
|
PWD |
938 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages to RCD road km 0 00 to 92 695 SH Hiring of JCB Excavator cum loader for removal of slips C o katcha drain and repair of shoulders and removal of slips etc in RCD road Km 51 000 to 71 000 and various roads under Larot Sub Division ]
[2905-2910 dated 1-09-2025][2025_PWD_113593_15]
|
PWD |
939 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages to RCD road Km 0 00 to 92 695 SH C o B wall in PCC 1 3 6 and wire crate at RD 87 530 to 87 590]
[2905-2910 dated 1-09-2025][2025_PWD_113593_20]
|
PWD |
940 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages to RCD Road Km 0 00 to 92 695 SH C o B Wall in Stone Masonary at RD 28 830 to 28 837 B wall in wire crates over existing PCC B wall at RD 25 423 to 25 446.60]
[2905-2910 dated 1-09-2025][2025_PWD_113593_19]
|
PWD |
941 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages to Jiskoon road Km 0 00 to 8 00 SH C o B wall in PCC 1 3 6 and wire crates at RD 6 315 to 6 345 and R wall in PCC 1 3 6 at RD 7 795 to 7 810 ]
[2905-2910 dated 1-09-2025][2025_PWD_113593_17]
|
PWD |
942 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages to Jiskoon road Km 0 00 to 8 00 SH C o B wall in PCC 1 3 6 at RD 4 960 to 5 005]
[2905-2910 dated 1-09-2025][2025_PWD_113593_14]
|
PWD |
943 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages to RCD Road Larot Sub Division SH Hiring of Tipper for carriage of muck on RCD road km 21 195 to 51 00 and various link road]
[2905-2910 dated 1-09-2025][2025_PWD_113593_23]
|
PWD |
944 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages on RCD Road Km 0 00 to 92 695 SH Hiring of JCB for Removal of slips drain and dressing of road surface on RCD road under Kawar Sub Division ]
[2905-2910 dated 1-09-2025][2025_PWD_113593_22]
|
PWD |
945 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages on RCD Road Km 0 00 to 92 695 SH Hiring of Tipper for carriage of muck stone from Km 71 750 to 92 695 under Kawar Sub Division]
[2905-2910 dated 1-09-2025][2025_PWD_113593_21]
|
PWD |
946 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages to RCD Road km 0 00 to 92 695 SH C o R Wall in PCC 1 3 6 at RD 80 755 to 80 815 At River Level]
[2905-2910 dated 1-09-2025][2025_PWD_113593_2]
|
PWD |
947 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages to RCD Road Km 0 00 to 92 695 SH C o B wall in PCC 1 3 6 and wire Crate at RD 64 660 to 64 720 L 60 and B wall in PCC 1 3 6 and wire Crate at RD 66 405 to 66 465 L 60]
[2905-2910 dated 1-09-2025][2025_PWD_113593_13]
|
PWD |
948 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[C o 30.48 mtrs 100 feet span Bailey Bridge over Harli Khad to connect Uttarakhand Border at RD 2 500 SH C o Sub Structure Abutment toward Uttarakhand Side ]
[2905-2910 dated 1-09-2025][2025_PWD_113593_12]
|
PWD |
949 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[C o 60.97 mtr 100 feet span Bailey bridge over shelwan1 Khad to connect Jakha village at Rd 0 890.98 SH C o Sub Structure abutment toward Jakha side at Rd 0 890.98]
[2905-2910 dated 1-09-2025][2025_PWD_113593_11]
|
PWD |
950 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages on RCD Road Km 0 00 to 92 695 SH Hiring of JCB for Removal of slips drain and dressing of road surface on RCD road under Kawar Sub Division ]
[2905-2910 dated 1-09-2025][2025_PWD_113593_10]
|
PWD |
951 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages to RCD road km 0 00 to 92 695 SH Hiring of JCB Excavator cum loader for removal of slips C o Katcha drain and repair of shoulders and removal of slips etc in RCD road Km 21 195 to 51 000 and various roads under Larot Sub Division]
[2905-2910 dated 1-09-2025][2025_PWD_113593_9]
|
PWD |
952 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[A R and M O HP PWD Rest House at Kawar SH C o Water tank stand at HP PWD Rest House Kawar ]
[2905-2910 dated 1-09-2025][2025_PWD_113593_8]
|
PWD |
953 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[A R and M O HP PWD Office at Dodra Kawar SH C o Wood work Polishing PVC Flooring Ceiling and Paneling work etc]
[2905-2910 dated 1-09-2025][2025_PWD_113593_7]
|
PWD |
954 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages to Link road village Kiterwari km 0 00 to 2 300 SH C o 6m slab culvert at RD 0 910 ]
[2905-2910 dated 1-09-2025][2025_PWD_113593_3]
|
PWD |
955 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[A R and M O HP PWD Office at Dodra Kawar SH C o Wood work Polishing PVC Flooring Ceiling and Paneling work etc Doctors and Nurses Residence at Kawar Under HPPWD Dodra Kawar Division in Distt. Shimla up to depth 40 mtr 3 C o 51 82 mtr span Bailey ]
[2905-2910 dated 1-09-2025][2025_PWD_113593_6]
|
PWD |
956 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R damages on RCD Road km 0 00 to 92 695 SH Hiring of JCB Excavator Cum Loader for removal of slips C o Katcha drain and repair of shoulders and removal of slips etc in various roads under Larot Sub Division]
[2905-2910 dated 1-09-2025][2025_PWD_113593_1]
|
PWD |
957 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages to Jiskoon Road km 0 00 to 8 00 SH C o B Wall in PCC 1 3 6 and Wire create at Rd 1 960 to 2 005]
[2905-2910 dated 1-09-2025][2025_PWD_113593_5]
|
PWD |
958 |
04-Sep-2025 09:00 AM |
18-Sep-2025 06:00 PM |
19-Sep-2025 11:00 AM |
[R R Damages on Harli to Gosangu Road Km 0 00 to 2 500 SH Hiring of Excavator Cum Loader Pock Lane for Removal of slips and dressing of road surface on Harli to Gosangu Road and other link roads under Kawar Sub Division ]
[2905-2910 dated 1-09-2025][2025_PWD_113593_4]
|
PWD |
959 |
03-Sep-2025 06:00 PM |
18-Sep-2025 10:00 AM |
18-Sep-2025 12:00 PM |
[DB-Tender(E)-03/2025-26]
[REB/DB-Tender(E)-03/2025-26][2025_HPSEB_113747_1]
|
HPSEBL||CE(Gen) Sundernagar||SE(Gen) Palampur||RE, Bassi, J/Nagar |
960 |
03-Sep-2025 06:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 12:30 PM |
[C/o Ponds (Mannual Excavation) near Vill- Dahar Nali, in GP- Bagri for the year 2025-26 under APO unit Sainj]
[Pond/01/25-26][2025_CPD1_113742_1]
|
Chief Project Director IDP Solan||DPO Shimla |
961 |
03-Sep-2025 06:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 12:30 PM |
[C/o Ponds (Mannual Excavation) near Vill- Dabar Nali, in GP- Dharech for the year 2025-26 under APO unit Sainj]
[Pond/02/25-26][2025_CPD1_113746_1]
|
Chief Project Director IDP Solan||DPO Shimla |
962 |
03-Sep-2025 05:30 PM |
17-Sep-2025 10:30 AM |
17-Sep-2025 11:30 AM |
[Providing LWSS Swarnoo Kharul under (CRF) in Tehsil Palampur Distt. Kangra (HP) Supply and Errection of Submersible Pumping Machinery of 5.00 HP with allied accessories (from clear water tank to collection tank.)]
[EE/JSVD/THL/2025-26-5496-5535 Dt. 03.09.2025][2025_HPIPH_113676_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Thural,Irrigation and Public Health,HP |
963 |
03-Sep-2025 05:30 PM |
17-Sep-2025 10:30 AM |
17-Sep-2025 11:30 AM |
[Annual Repair and Maintenance of LWSS Duhak Dhaniyara under Jal Shakti Sub Division Thural in Tehsil Palampur Distt. Kangra (HP)]
[EE/JSVD/THL/2025-26-5496-5535 Dt. 03.09.2025][2025_HPIPH_113673_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Thural,Irrigation and Public Health,HP |
964 |
03-Sep-2025 05:30 PM |
17-Sep-2025 10:30 AM |
17-Sep-2025 11:30 AM |
[Augmentation of 7 Nos. LWSS in Sullah Constituency LWSS Lahru Bhanwar, Thana Bhanwar, Barsola Lahru, Kiarwan, Sunpur Lahru, Duhak Dhaniyara and Dugni Malahoo in Tehsil Palampur Distt. Kangra (HPReplacement of Centrifugal pumping machinery wit]
[EE/JSVD/THL/2025-26-5496-5535 Dt. 03.09.2025][2025_HPIPH_113666_1]
|
HP Irrigation and Public Health||Dharamshala Circle,Irrigation and Public Health,HP||Thural,Irrigation and Public Health,HP |
965 |
03-Sep-2025 05:00 PM |
18-Sep-2025 05:00 PM |
20-Sep-2025 03:00 PM |
[Installation of Traffic Light System]
[DSCL/ELECTRICAL/01/2025][2025_DSCL1_113611_1]
|
DHARAMSHALA SMART CITY LIMITED||DHARAMSHALA||Chief Financial Officer |
966 |
03-Sep-2025 03:00 PM |
20-Sep-2025 05:00 PM |
22-Sep-2025 12:30 PM |
[Job of 1 MTS worker]
[2025-26-002][2025_HPPTC_112136_2]
|
HP Power Transmission Corporation limited||Projects||DGM (Shimla)||PIU Bhabhanagar |
967 |
02-Sep-2025 06:00 PM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Repair of damaged Hatchery and Boundary Wall at Fish Seed Farm Kangra, Distt Kangra H.P.]
[2025_HPAFMS_1930_1][2025_HAFMS_113607_1]
|
HP Aquaculture Fisheries and Marketing Society||Chief Executive Officer-HAFMS||Deputy Director Fisheries-HQ-HAFMS |
968 |
02-Sep-2025 06:00 PM |
24-Sep-2025 10:30 AM |
24-Sep-2025 11:00 AM |
[Special repair of 4 No Trout raceways including storage tank at Trout Fish Farm Bhandal, Distt. Chamba H.P. ]
[2025_HPAFMS_1931_1][2025_HAFMS_113615_1]
|
HP Aquaculture Fisheries and Marketing Society||Chief Executive Officer-HAFMS||Deputy Director Fisheries-HQ-HAFMS |
969 |
02-Sep-2025 02:00 PM |
17-Sep-2025 04:00 PM |
18-Sep-2025 01:00 PM |
[CEKZ-DAL-C-06/2025-26]
[CEKZ-DAL-C-06/2025-26][2025_HPSEB_113575_1]
|
HPSEBL||CE (OP) North |
970 |
02-Sep-2025 11:45 AM |
19-Sep-2025 10:00 AM |
19-Sep-2025 03:30 PM |
[HPSEBL/EDHMR/E/2025-26/86]
[HPSEBL/EDHMR/E/2025-26/86][2025_HPSEB_112997_2]
|
HPSEBL||CE(OP) CZ Hamirpur||SE(OP) Hamirpur||Sr. Xen (E) Hamirpur |
971 |
02-Sep-2025 09:00 AM |
18-Sep-2025 11:30 AM |
18-Sep-2025 12:30 PM |
[AR and MO Various WSS/ FIS under JSV Sub Division Keylong Tehsil Keylong Distt Lahaul Spiti HP]
[7268-7318 dated 01.09.2025][2025_HPIPH_113517_1]
|
HP Irrigation and Public Health||Kullu Circle,Irrigation and Public Health,HP||Keylong,Irrigation and Public Health,HP |
972 |
01-Sep-2025 06:10 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[E-tender for providing Sanitation, Cleaning and Housekeeping services for AIMSS Shimla]
[HFW-(AIMSS)(G)7-1/2021-5379][2025_AIMS_113557_1]
|
Directorate of Medical Education and Research||Atal Institute of Medical Super Specialities Shimla |
973 |
01-Sep-2025 06:00 PM |
08-Oct-2025 10:30 AM |
08-Oct-2025 11:00 AM |
[Establishment and Operation of Potato Processing Unit under PPP Mode in HPCDP (P-II)-JICA-ODA]
[No.Agr.H.SPMU F(8)/Turmeric Potato/85/25-1729][2025_HPCDP_113420_1]
|
Himachal Pradesh Agriculture Development Society (JICA-ODA loan) |
974 |
01-Sep-2025 06:00 PM |
08-Oct-2025 10:30 AM |
08-Oct-2025 11:00 AM |
[Establishment and Operation of Spices Park with Turmeric, Ginger and Garlic Processing Cluster (SPTGG) at Nadaun, Distt. Hamirpur under HPCDP (Phase-II), JICA- ODA]
[ No.Agr.H.SPMU F(8)/Turmeric Potato/85/25-1726 Dt 30.08.2025][2025_HPCDP_113079_1]
|
Himachal Pradesh Agriculture Development Society (JICA-ODA loan) |
975 |
01-Sep-2025 05:30 PM |
17-Sep-2025 12:00 PM |
17-Sep-2025 03:30 PM |
[Empanelment of firms or vendors for supply of street light materials]
[UD/MC/MND/online bids/2025-4516-17 dated 30.08.2025][2025_UDDHP_113549_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Corporation Mandi |
976 |
01-Sep-2025 05:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 11:30 AM |
[C/O Rajiv Gandhi Govt. Model Day Boarding School at Sol Vanehar (Jaisinghpur) Distt Kangra (HP) (Primary Block) (SH- Providing E.I. therein)]
[Elect. Division HPPWD Palampur][2025_PWD_113500_2]
|
PWD |
977 |
01-Sep-2025 05:00 PM |
17-Sep-2025 11:00 AM |
17-Sep-2025 11:30 AM |
[C/O Rajiv Gandhi Govt. Model Day Boarding School at Kamlehar (Kandwari) Distt Kangra (HP) (Primary Block) (SH- Providing E.I. therein)]
[Elect. Division HPPWD Palampur][2025_PWD_113500_1]
|
PWD |
978 |
01-Sep-2025 05:00 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 03:30 PM |
[HPSEBL/EDHMR/E/2025-26/82]
[HPSEBL/EDHMR/E/2025-26/82][2025_HPSEB_112949_2]
|
HPSEBL||CE(OP) CZ Hamirpur||SE(OP) Hamirpur||Sr. Xen (E) Hamirpur |
979 |
30-Aug-2025 06:30 PM |
18-Sep-2025 05:00 PM |
19-Sep-2025 03:00 PM |
[Contract for dog catching ,releasing, per and post operative case limited to feeding, water, washing for conducting Animal Birth Control of stray dogs in MC Solan.]
[7704-06 dt.29.08.2025][2025_UDDHP_113472_1]
|
Directorate of Urban Development||Urban Development - UDDHP||Municipal Council Solan - UDDHP |
980 |
30-Aug-2025 06:00 PM |
20-Sep-2025 02:00 PM |
20-Sep-2025 02:30 PM |
[E-tender for the procurement of reagents, kits, chemicals, and other consumables items for the departments of Microbiology, IGMC Shimla]
[HFW/ME(MCS)G(3)(micro)25-16794][2025_IGMC1_113438_1]
|
Directorate of Medical Education and Research||IGMC Shimla||Principal IGMC Shimla |
981 |
30-Aug-2025 05:40 PM |
26-Sep-2025 03:00 PM |
27-Sep-2025 11:30 AM |
[PROCUREMENT OF EQUIPMENT FOR NIROG CLINICS ON BEHALF OF NHM-HP ]
[HPMSCL/Proc/MandE(Nirog Clinics)-NHM/2024][2025_HPMSC_113467_1]
|
Himachal Pradesh Medical Services Corporation Limited||Accounts||Head Office |
982 |
30-Aug-2025 05:00 PM |
25-Sep-2025 01:00 PM |
26-Sep-2025 11:00 AM |
[Providing LT extension to newly constructed house at Lower Katyali in (E) section Gandhi nagar,under ESD No.-I, HPSEBL, Kullu. (TS No. 219/2024-25)]
[NIT-88/2025-26][2025_HPSEB_113410_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Kullu |
983 |
30-Aug-2025 05:00 PM |
25-Sep-2025 01:00 PM |
26-Sep-2025 11:00 AM |
[Providing additional circuit (3ph- 5 wire) LT line from existing 630KVA, 110/.4KV DTR Lower Badah in (E) Section Gandhinagar under ESD No I, HPSEBL, Kullu. (TS No. 259/2024-25)]
[NIT-89/2025-26][2025_HPSEB_113419_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Kullu |
984 |
30-Aug-2025 05:00 PM |
25-Sep-2025 01:00 PM |
26-Sep-2025 11:00 AM |
[Providing LT extension to leftout/newly constructed houses from 9KVA, 11/0.4KV DTR Tiun in (E) Section Bhutti under ESD No. II, HPSEBL, Kullu. (TS No. 230-2022-23)]
[NIT-92/2025-26][2025_HPSEB_113450_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Kullu |
985 |
30-Aug-2025 05:00 PM |
25-Sep-2025 01:00 PM |
26-Sep-2025 11:00 AM |
[Providing SOP to JSV by providing additional 250KVA, 11/0.4KV DTR at Nangabag Bhihal in (E) section Babeli under ESD No. II, HPSEBL, Kullu]
[NIT-93/2025-26][2025_HPSEB_113456_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Kullu |
986 |
30-Aug-2025 05:00 PM |
25-Sep-2025 01:00 PM |
26-Sep-2025 11:00 AM |
[Providing LT extension to leftout/newly constructed houses from existing 63KVA, 11/0.4KV S/stn Bhulang, 25KVA, 11/0.4KV Sarach, 25KVA, 11/0.4KV Pachali and 63KVA, 11/0.4KV S/stn Khalyani in (E) Section Kolibehar under ESD No. I, HPSEBL, Kullu. ]
[NIT-90/2025-26][2025_HPSEB_113441_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Kullu |
987 |
30-Aug-2025 05:00 PM |
25-Sep-2025 01:00 PM |
26-Sep-2025 11:00 AM |
[Providing LT extension to leftout houses from existing 25KVA, 11/0.4KV DTR Churla and 25KVA, 11/0.4KV DTR Bhaltha in (E) Section Bharai under ESD No. II, HPSEBL, Kullu (TS No. 189/2022-23)]
[NIT-94/2025-26][2025_HPSEB_113462_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Kullu |
988 |
30-Aug-2025 05:00 PM |
25-Sep-2025 01:00 PM |
26-Sep-2025 11:00 AM |
[Providing LT extension to leftout/newly constructed houses from various DTRs ( 63 KVA Churla, 63 KVA Suma and 25 KVA Sarli) in (E) Section Bharai under ESD No. II, HPSEBL, Kullu. (TS No. 52/2025-26)]
[NIT-87/2025-26][2025_HPSEB_113404_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Kullu |
989 |
30-Aug-2025 05:00 PM |
25-Sep-2025 01:00 PM |
26-Sep-2025 11:00 AM |
[Providing LT extension to leftout/newly constructed houses from existing 25KVA, 11/0.4KV DTR Bagan and 25KVA, 11/0.4KV Bedhar in (E) Section Bharai under ESD No. II, HPSEBL, Kullu. (TS No. 73/2023-24)]
[NIT-86/2025-26][2025_HPSEB_113390_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Kullu||Sr. Xen (E) Kullu |
990 |
30-Aug-2025 05:00 PM |
22-Sep-2025 03:00 PM |
23-Sep-2025 11:30 AM |
[Procurement of High-End Echocardiography Machine ON BEHALF OF AIMSS Shimla]
[HPMSCL/Proc/Machinery and Equipment-AIMMS/2023][2025_HPMSC_113440_1]
|
Himachal Pradesh Medical Services Corporation Limited||Accounts||Head Office |
991 |
30-Aug-2025 05:00 PM |
19-Sep-2025 10:30 AM |
19-Sep-2025 11:00 AM |
[Repair of 2 no. Nursery ponds i.e. S. No. 1 and 4 at Fish Farm Alsu Distt. Mandi H.P.]
[2025_HPAFMS_1929_1][2025_HAFMS_113403_1]
|
HP Aquaculture Fisheries and Marketing Society||Chief Executive Officer-HAFMS||Deputy Director Fisheries-HQ-HAFMS |
992 |
30-Aug-2025 02:00 PM |
22-Sep-2025 12:00 PM |
23-Sep-2025 11:30 AM |
[Potato Cyst Nematode Treatment Chambers, Drain and Soak Pit at PDS Khunna GP Chowai PO Chowai Tehsil Anni ,Distt Kullu HP]
[No.Agr.Ani/ Kullu/DDAKulluFunds/1 /2015-16-408][2025_DoA_113400_1]
|
Director of Agriculture||Agriculture Head Office - DoA||DDA Shimla - DoA||SDSCO Rampur - DoA |
993 |
30-Aug-2025 10:30 AM |
20-Sep-2025 05:00 PM |
22-Sep-2025 02:30 PM |
[HPPTCL/PIU Ghumarwin/SMG Tenders/010/ 2025-26]
[HPPTCL/PIU Ghumarwin/SMG Tenders/010/ 2025-26][2025_HPPTC_113384_1]
|
HP Power Transmission Corporation limited||Projects||DGM (Kullu)||PIU Ghumarwin |
994 |
30-Aug-2025 09:00 AM |
17-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
[ Tender for outsourcing the job of Operation and Maintenance of H.T and L.T distribution network in Electrical Division, HPSEBL, Una under (Op.) Circle Una through licensed CLASS-A Electrical Contractor.]
[NIT-12/2025-26][2025_HPSEB_113296_1]
|
HPSEBL||CE(OP) CZ Hamirpur |
995 |
30-Aug-2025 09:00 AM |
17-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
[ Tender for outsourcing the job of Operation and Maintenance of H.T and L.T distribution network in Electrical Division, HPSEBL, Ghumarwin under (Op.) Circle Bilaspur through licensed CLASS-A Electrical Contractor.]
[NIt-13/2025-26][2025_HPSEB_113301_1]
|
HPSEBL||CE(OP) CZ Hamirpur |
996 |
30-Aug-2025 09:00 AM |
17-Sep-2025 10:00 AM |
18-Sep-2025 03:00 PM |
[ Tender for outsourcing the job of Operation and Maintenance of H.T and L.T distribution network in Electrical Division, HPSEBL, Nadaun under (Op.) Circle Hamirpur through licensed CLASS-A Electrical Contractor.]
[NIT-11/2025-26][2025_HPSEB_113287_1]
|
HPSEBL||CE(OP) CZ Hamirpur |
997 |
30-Aug-2025 09:00 AM |
19-Sep-2025 01:30 PM |
20-Sep-2025 01:30 PM |
[Providing and fixing PVC Ceiling]
[KED/DBTender12/2025-26-1377-83][2025_HPSEB_113269_1]
|
HPSEBL||CE(OP) South||SE(OP) Rampur||Sr. Xen (E) Kumarsain |
998 |
30-Aug-2025 09:00 AM |
25-Sep-2025 11:00 AM |
26-Sep-2025 12:30 PM |
[Monitoring of flow of power in real-time basis of Small/Micro HEPs at SLDC/ALDC, Shimla by installing Multi-Functional Meters (MFMs) at HEPs and integrating these MFMs with SCADA system through Gateway at HPSLDC using GSM/GPRS/Leased line as communic]
[CE(SO-1)/2024-25][2025_HPSEB_113209_1]
|
HPSEBL||CE(SO) Shimla |
999 |
29-Aug-2025 01:00 PM |
19-Sep-2025 11:30 AM |
19-Sep-2025 03:30 PM |
[Tender for replacement of rotten wooden X-arms with MS. X-arms of 22 KV HT line Doldhar, Giri Sukibain Feeder in (E) section jai Devi under ESD Sundernagar ]
[No/DB/183619 NIT-84/2025-26][2025_HPSEB_113282_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Bilaspur||Sr. Xen (S/Nagar) |
1000 |
29-Aug-2025 12:30 PM |
22-Sep-2025 11:00 AM |
22-Sep-2025 11:30 AM |
[Supply of Pre Primary Teaching Learning Material in all the Elementary Education Blocks of District Solan (H.P.)]
[DIET SOLAN 180][2025_HPSES_113274_1]
|
Himachal Pradesh School Education Society||Samagra Shiksha (ISSE)||DIET Solan |
1001 |
28-Aug-2025 04:00 PM |
20-Sep-2025 01:00 PM |
20-Sep-2025 03:00 PM |
[Supply of Dental Material ]
[HFW(GDC)G(3)-5/99-4216 ][2025_GMCS_113140_1]
|
Directorate of Medical Education and Research||Government Dental College Shimla |
1002 |
28-Aug-2025 01:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 11:00 AM |
[Annual Repair, Maintenance and Operation of STP and its sewer networ]
[RGGEC/NGB/STORE/STP/2025][2025_DTE_113163_1]
|
Directorate of Technical Education||Engineering Colleges||Rajiv Gandhi Govt.Engg. College Nagrota Bagwan |
1003 |
27-Aug-2025 05:00 PM |
17-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[TENDER DOCUMENT FOR HIRING OF LIGHT TRANSPORT VEHICLE (TRUCK) ON OUTSOURCE BASIS.]
[AHY-MND-RGM-Etenders-10001][2025_DAH1_113090_1]
|
Directorate Animal Husbandry||Director Animal Husbandry |
1004 |
27-Aug-2025 04:30 PM |
18-Sep-2025 04:00 PM |
19-Sep-2025 11:30 AM |
[Job of Cleaning, Sweeping and Multipurpose Work for Operational Functioning of HPTAMC (JCC), Kunihar Distt. Solan (H.P) for a period of one under HPPTCL PIU Kala Amb]
[HPPTCL/PIU-KALA-AMB/ TENDERS/ 2025-26/01][2025_HPPTC_113064_1]
|
HP Power Transmission Corporation limited||Projects||DGM (Shimla)||PIU Kalaamb |
1005 |
26-Aug-2025 05:20 PM |
17-Sep-2025 02:00 PM |
17-Sep-2025 02:30 PM |
[Procurement of ICU Ventilators for AIMSS Shimla]
[HFW-AIMSS-G(6)-80/2025-5231][2025_AIMS_113001_1]
|
Directorate of Medical Education and Research||Atal Institute of Medical Super Specialities Shimla |
1006 |
26-Aug-2025 05:00 PM |
23-Sep-2025 03:00 PM |
23-Sep-2025 03:30 PM |
[Rate Contract for supply and installation of IEC Material]
[HFW-SML/IEC(e-Tender)2025-5501][2025_DFHW_112990_1]
|
Department of Health and Family Welfare||Directorate of Health and Family Welfare||CMO SHIMLA |
1007 |
26-Aug-2025 12:50 PM |
19-Sep-2025 11:00 AM |
19-Sep-2025 01:00 PM |
[Construction of EMRS Lahaul at Kukumseri Distt. Lahaul and Spiti of Himachal Pradesh with composite RCC framed structure including MEP services, External lighting, Fire Fighting System and allied works.]
[RTDC/EMRS Kukumseri(Phase-II)/2025/1936 dt 23/08/2025][2025_RTDCH_112906_1]
|
Ropeway and Rapid Transport System Development Corporation |
1008 |
25-Aug-2025 04:45 PM |
26-Sep-2025 01:00 PM |
27-Sep-2025 03:00 PM |
[SSD-561/2025]
[SSD-561/2025][2025_HPSEB_112923_1]
|
HPSEBL||CE(ES) Hamirpur||SE(Design) Hamirpur||Senior Executive Engineer-III |
1009 |
25-Aug-2025 11:00 AM |
20-Sep-2025 11:00 AM |
20-Sep-2025 02:30 PM |
[Tender for Supply, Erection and Commissioning of SCADA items (Communication to remote through existing system) at 2x1.6 MVA Sub Station Kut Bounger under ESD HPSEBL, Talai.]
[NIT-50/2025-26][2025_HPSEB_112791_1]
|
HPSEBL||CE(OP) CZ Mandi||SE(OP) Bilaspur||Sr. Xen (E) Ghumarwin |
1010 |
25-Aug-2025 09:00 AM |
25-Sep-2025 01:00 PM |
25-Sep-2025 02:00 PM |
[E-tender for the supply of medicines/drugs to IGMC and Hosptial Shimla ]
[HFW(MS-IG)-S-4/2025-(Medicine tender )8823 dated 22.08.2025][2025_IGMC1_112829_1]
|
Directorate of Medical Education and Research||IGMC Shimla||MS IGH Shimla |
1011 |
23-Aug-2025 03:45 PM |
25-Sep-2025 12:00 PM |
25-Sep-2025 03:00 PM |
[Library Books]
[RGGEC/NGB/Library/2025-10726][2025_DTE_112678_1]
|
Directorate of Technical Education||Engineering Colleges||Rajiv Gandhi Govt.Engg. College Nagrota Bagwan |
1012 |
23-Aug-2025 12:30 PM |
26-Sep-2025 05:00 PM |
27-Sep-2025 11:00 AM |
[Development of Bulk Drug Park at Una Distt. Una (H.P.) SH- Construction of Common Effluent Treatment Plant (CETP) 5.0 MLD (HTDS- 1.5 MLD, LTDS- 3.5 MLD).]
[Job No. 1][2025_SIDC_112726_1]
|
HP SIDC Limited |
1013 |
23-Aug-2025 09:00 AM |
22-Sep-2025 02:00 PM |
22-Sep-2025 03:00 PM |
[e-tenders are invited from interested bonafied himachalis for allotment of following Shops/Counters in IGMC premises on monthly rent basis for 3 years]
[RKS(MS) Samiti- Allotment-550-551 dated 22.08.2025][2025_IGMC1_112721_1]
|
Directorate of Medical Education and Research||IGMC Shimla||MS IGH Shimla |
1014 |
21-Aug-2025 06:30 PM |
24-Sep-2025 06:00 PM |
25-Sep-2025 11:00 AM |
[Consultancy Service for updation of DPR including Geo technical investigation and hydraulic calculations for bridges in Km 63.00 to 97.00 on NH.305 in the State of Himachal Pradesh.]
[3221-70][2025_PWD_112667_1]
|
PWD |
1015 |
21-Aug-2025 04:00 PM |
25-Sep-2025 05:00 PM |
27-Sep-2025 11:30 AM |
[Supply, Manufacture, Fabrication, Testing at Manufacturers Works, Transportation to site, Insurance, Loading and Unloading, Storage, Erection, Testing and Commissioning of 400kV Double-Circuit Transmission line from LILO point on]
[HPPTCL/CONTRACTS/ TENDERS/GMCD/ 2025/011][2025_HPPTC_112630_1]
|
HP Power Transmission Corporation limited |
1016 |
21-Aug-2025 02:00 PM |
18-Sep-2025 05:00 PM |
20-Sep-2025 11:30 AM |
[Construction of 220 kV D/C TL by Utilization of existing 400 kV D/C Rehru-Kunihar Transmission line by Charging it on 220 kV level from 400/220 kV PGCIL Substation to 220/132 kV HPSEBL Substation and ]
[HPPTCL/CONTRACTS/ TENDERS/WORLD BANK/ 2025-001][2025_HPPTC_112558_1]
|
HP Power Transmission Corporation limited |
1017 |
21-Aug-2025 09:00 AM |
18-Sep-2025 03:00 PM |
19-Sep-2025 12:00 PM |
[Tender for Reconductoring of existing/construction of new 33 KV HT Line(s) from 220/132/33 KV S/Stn. Kangoo to 33/11 KV Elect. S/Stn. HPSEBL Kandrour under E/Sub Division, HPSEB Ltd. Kandrour in r/o ED Ghumarwin ]
[NIT-06/2025-26][2025_HPSEB_112491_1]
|
HPSEBL||CE(OP) CZ Hamirpur |
1018 |
20-Aug-2025 06:00 PM |
17-Sep-2025 03:00 PM |
18-Sep-2025 11:00 AM |
[Procurement of Advance Laproscopic Surgry Set, on behalf of Dr. RKGMC, Hamirpur]
[HPMSCL/Proc/Advance Laparoscopic Set/Dr. RKGMC Hamirpur/2023-Vol-III][2025_HPMSC_112569_1]
|
Himachal Pradesh Medical Services Corporation Limited||Accounts||Head Office |
1019 |
19-Aug-2025 02:00 PM |
20-Sep-2025 04:00 PM |
22-Sep-2025 11:00 AM |
[E-tender for Procurement and Supply of Energy Efficient Appliances ]
[Electric/Project of Energy Dep./2024-25-6579-6580 dt 18-8-2025][2025_HO_112401_1]
|
HP State Civil Supplies Corporation Limited |
1020 |
19-Aug-2025 11:30 AM |
17-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Design, Engineering, Manufacturing, Testing of Equipment, Delivery, Storage, Erection, Testing and Commissioning of Additional 132kV Line Bay and Associated Works at the Premises of HPSEBLs 132/33 kV Sub-Station Johron District Sirmaur (Himachal Prad]
[HPPTCL/CONTRACTS/ TENDERS/GMCD/ 2025/010][2025_HPPTC_112397_1]
|
HP Power Transmission Corporation limited |
1021 |
18-Aug-2025 06:00 PM |
17-Sep-2025 05:00 PM |
17-Sep-2025 05:00 PM |
[Construction of Way Side Amenities at Kaleshwar Mahadev, Kunha, District Kangra, Himachal Pradesh SH Civil, WS and SI, EI, Fire Fighting, Fire Alarm system and Surveillance System etc OCB/ Contract Package Invitation for Bids No. SITDP-HP W15/2025-2]
[SITDP-HP_W15][2025_HPTDB_112369_1]
|
Himachal Pradesh Tourism Development Board||HPTDB - ADB Tenders |
1022 |
18-Aug-2025 04:40 PM |
25-Sep-2025 04:00 PM |
26-Sep-2025 11:00 AM |
[Housing Colony at Basal, Distt. Solan H.P. (SH- Construction of 2 Nos. Twin Towers (Block No. 28 and 29) 24 Nos. 3BHK (flats) with Parking and Attic Floor including Internal Water Supply, Sanitary Installation, 2 Nos. 6000 litre Capacity Rain Water.]
[HIMUDA ND CB ETENDER 2024 2319-28 DT 18.08.2025][2025_HIMUD_112357_1]
|
Himachal Urban Development Authority||Supdt. Engineer (S),HIMUDA||Executive Engineer,Shimla Division-II,HIMUDA |
1023 |
14-Aug-2025 06:00 PM |
22-Sep-2025 03:00 PM |
22-Sep-2025 03:00 PM |
[Planting material]
[HPSHIVA/G03][2025_DOH_112238_1]
|
Directorate of Horticulture |
1024 |
14-Aug-2025 05:10 PM |
20-Sep-2025 01:00 PM |
20-Sep-2025 03:00 PM |
[Durgs and Injectable dept of nephrology]
[E-Tender of drugs and injectable ][2025_DMER5_112275_1]
|
Directorate of Medical Education and Research||Dr Rajendra Prasad Govt Medical College Tanda Kangra |
1025 |
13-Aug-2025 05:00 PM |
26-Sep-2025 11:30 AM |
26-Sep-2025 12:30 PM |
[M21(01) Modular Steel Water Storage Tanks]
[No. Ind.SP/F/(NIT)148/94-VOl-III][2025_HPInd_111985_1]
|
Industries Department |
1026 |
13-Aug-2025 05:00 PM |
26-Sep-2025 11:30 AM |
26-Sep-2025 12:30 PM |
[C-02 (Bleaching Powder (ISI Marked))]
[No. Ind.SP/F/(NIT)148/94-VOl-III][2025_HPInd_111985_6]
|
Industries Department |
1027 |
13-Aug-2025 05:00 PM |
17-Sep-2025 11:30 AM |
17-Sep-2025 12:30 PM |
[M-44 (Steel Furniture)]
[No. Ind.SP/F/(NIT)148/94-VOl-III][2025_HPInd_111985_9]
|
Industries Department |
1028 |
13-Aug-2025 05:00 PM |
17-Sep-2025 11:30 AM |
17-Sep-2025 12:30 PM |
[C-02(01) Alumino Ferric (ISI Marked)]
[No. Ind.SP/F/(NIT)148/94-VOl-III][2025_HPInd_111985_7]
|
Industries Department |
1029 |
13-Aug-2025 05:00 PM |
17-Sep-2025 11:30 AM |
17-Sep-2025 12:30 PM |
[M-15 (Copper Alloy Check Valves etc.).]
[No. Ind.SP/F/(NIT)148/94-VOl-III][2025_HPInd_111985_12]
|
Industries Department |
1030 |
13-Aug-2025 05:00 PM |
17-Sep-2025 11:30 AM |
17-Sep-2025 12:30 PM |
[M-119(02) Ratchet pipe Threader for the Taper Pipe Thread (R-sereis) (ISI Marked)]
[No. Ind.SP/F/(NIT)148/94-VOl-III][2025_HPInd_111985_11]
|
Industries Department |
1031 |
13-Aug-2025 05:00 PM |
17-Sep-2025 11:30 AM |
17-Sep-2025 12:30 PM |
[M-59 (Wooden Furniture)]
[No. Ind.SP/F/(NIT)148/94-VOl-III][2025_HPInd_111985_10]
|
Industries Department |
1032 |
13-Aug-2025 05:00 PM |
17-Sep-2025 11:30 AM |
17-Sep-2025 12:30 PM |
[M-128(01) Sericulture Machinery]
[No. Ind.SP/F/(NIT)148/94-VOl-III][2025_HPInd_111985_8]
|
Industries Department |
1033 |
07-Aug-2025 06:00 PM |
18-Sep-2025 02:00 PM |
18-Sep-2025 02:00 PM |
[Construction of Water Treatment Plant at Manali adjoining area, Sewerage Treatment Plant at Palampur zone 1 3 Karsog and Nahan]
[2919][2025_HPIPH_111854_1]
|
HP Irrigation and Public Health||JSV (Project) Mandi||Project Director (PMU) HPRWSP JSV Mandi |
1034 |
07-Aug-2025 05:15 PM |
20-Sep-2025 01:00 PM |
20-Sep-2025 03:00 PM |
[ supply of cadiology stent and its accessories]
[E-Tender of Cardiology Implats Stent][2025_DMER5_111862_1]
|
Directorate of Medical Education and Research||Dr Rajendra Prasad Govt Medical College Tanda Kangra |
1035 |
28-Jul-2025 06:00 PM |
01-Oct-2025 02:00 PM |
01-Oct-2025 02:00 PM |
[C O Water Supply Network at Manali adjoining area Sewerage Network at Palampur Zone 1 3 Karsog Nahan Zone 1 2 3]
[2757][2025_HPIPH_111139_1]
|
HP Irrigation and Public Health||JSV (Project) Mandi||Project Director (PMU) HPRWSP JSV Mandi |
1036 |
26-Jul-2025 06:30 PM |
16-Oct-2025 02:00 PM |
16-Oct-2025 03:00 PM |
[RFP for Diagnostic Study on Hindrances in Mainstreaming Gender in Disaster Risk Reduction ]
[PlanRev (DMC) (F) 11-50/2023-DRRP (AFD-III) Mainstreaming Gender][2025_HPDMC_110354_1]
|
Disaster Management Cell |
1037 |
26-Jul-2025 06:30 PM |
25-Sep-2025 02:00 PM |
29-Sep-2025 03:00 PM |
[RFP for IVA]
[Rev (DMC) (F)11-50/2023-DRRP (AFD-III) IVA][2025_HPDMC_111018_1]
|
Disaster Management Cell |
1038 |
26-Jul-2025 06:30 PM |
15-Oct-2025 02:00 PM |
15-Oct-2025 03:00 PM |
[Diagnostic Study of Public Financial Management PFM systems]
[Rev (DMC) (F)11-50/2023-DRRP (AFD-III) PFM][2025_HPDMC_111029_1]
|
Disaster Management Cell |
1039 |
25-Jul-2025 12:00 PM |
20-Sep-2025 11:00 AM |
20-Sep-2025 03:00 PM |
[HO CPA 1 2 1 Tender 177 CAMC 2025 26]
[HO CPA 1 2 1 Tender 177 CAMC 2025 26][2025_HRTC_110896_1]
|
HP-HRTC-Manging Director||General manager (Tech)-HRTC-HP |
1040 |
25-Jul-2025 12:00 PM |
20-Sep-2025 11:00 AM |
20-Sep-2025 03:00 PM |
[HO CPA 1 2 1 Tender 176 CAMC 2025 26 ]
[HO CPA 1 2 1 Tender 176 CAMC 2025 26][2025_HRTC_110874_1]
|
HP-HRTC-Manging Director||General manager (Tech)-HRTC-HP |
1041 |
18-Jul-2025 09:00 AM |
24-Sep-2025 01:00 PM |
25-Sep-2025 03:00 PM |
[SSD 566/2025]
[SSD 566/2025][2025_HPSEB_110295_1]
|
HPSEBL||CE(ES) Hamirpur||SE(Design) Hamirpur||Senior Executive Engineer-III |
1042 |
11-Jul-2025 03:00 PM |
01-Oct-2025 05:00 PM |
03-Oct-2025 12:00 PM |
[Supply of approximately 3,00,000 Day Old Commercial Broiler Chicks]
[HPWF/62/LS/SML/2025][2025_HPWF0_109816_1]
|
Wool Fedration |
1043 |
16-Jun-2025 04:00 PM |
22-Sep-2025 04:00 PM |
24-Sep-2025 11:30 AM |
[Supply, Design, Engineering, Manufacture, Fabrication, Testing at Manufacturers Works of Equipment and Materials, Loading, Transportation and Delivery and Unloading of 1 No. 50/63 MVA]
[HPPTCL/CONTRACTS/ TENDERS/GEC-II/ 2025/004][2025_HPPTC_107632_1]
|
HP Power Transmission Corporation limited |
1044 |
06-Jun-2025 11:00 AM |
26-Sep-2025 05:00 PM |
27-Sep-2025 11:00 AM |
[Development of Bulk Drug Park at Una Distt. Una (H.P.) SH- Construction of Hazardous Waste Management Plant (HWMP) 50,000 MT/ Annum.]
[Job No. 3][2025_SIDC_106977_1]
|
HP SIDC Limited |
1045 |
09-May-2025 12:00 PM |
22-Sep-2025 05:00 PM |
23-Sep-2025 12:30 PM |
[Establishment of Centre of Excellence Dairy Farm cum Training Centre,at Mohal Basal, up Mohal Thakurdwara, Tehsil, District Una, Himachal Pradesh, India, PIN 174303]
[AHY-H-(II)F-9-102/14-NPBB DD][2025_DAH0_105066_1]
|
Directorate Animal Husbandry |
1046 |
02-May-2025 03:00 PM |
19-Sep-2025 03:30 PM |
20-Sep-2025 03:30 PM |
[Request for Proposal For Selection of System Integrator for designing, develop, and implement AI based comprehensive Digital Library and Learning Management System in the State of Himachal Pradesh]
[DDTG-F05(30)/2/2024-IT][2025_DIT_104691_1]
|
Department of Information Technology |
1047 |
04-Feb-2025 05:15 PM |
08-Oct-2025 11:00 AM |
08-Oct-2025 03:00 PM |
[Development, Operations and Maintenance of Innovative Urban Ropeway transport Network in Shimla project (Phase 2) on Design, Build, Finance, Operate and Transfer (DBFOT) Mode]
[RTDC/ShimlaParwano/23/3664-65 dt 01/02/25][2025_RTDCH_99304_1]
|
Ropeway and Rapid Transport System Development Corporation |
1048 |
04-Feb-2025 05:00 PM |
08-Oct-2025 11:00 AM |
08-Oct-2025 03:00 PM |
[Development, Operations and Maintenance of passenger Ropeway from Narkanda to Hatu Peak, Distt. Shimla on DBFOT mode]
[RTDC/ShimlaParwano/23/3664-65 dt 01/02/25][2025_RTDCH_99303_1]
|
Ropeway and Rapid Transport System Development Corporation |
1049 |
04-Feb-2025 05:00 PM |
08-Oct-2025 11:00 AM |
08-Oct-2025 03:00 PM |
[Development, Operations and Maintenance of passenger Ropeway Network from Parwanoo to Shimla on DBFOT mode]
[RTDC/ShimlaParwanoo/23/3664-65 dt 01/02/25][2025_RTDCH_99299_1]
|
Ropeway and Rapid Transport System Development Corporation |